Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Agriculture was posted on July 23, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Information on Nationwide CLEAR 30 Pilot Conservation Reserve Program

Closed
12FPC221Q0037Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 16 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 16 hours ago

DEADLINE

in about 14 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 16 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 21 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

DC, USA

Set-Aside

NONE

Documents

2

CLEAR+30+Maintenance+Performance+Work+Statement+20210723+version+2.0.pdf

PDF

USDA+Nationwide+CLEAR30+RFI+%2823+Jul+21%29+version+2.0.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Fpac Bus Cntr-Acq Div-It_enterp SEC
Contacts2 people available
OfficeWASHINGTON, DC, 20250, USA
Office AddressWASHINGTON, DC, 20250, USA
Contacts
Bumjoon 'Joshua' Pak

Full Description

Show more
REQUEST FOR INFORMATION/SOURCE SOUGHT ON NATIONWIDE CLEAR 30 PILOT CONSERVATION RESERVE PROGRAM INTRODUCTION The U.S. Department of Agriculture (USDA) Farm Service Agency (FSA) is investigating the interest from contractors that will undertake conservation maintenance of the land(s) enrolled in the Conservation Reserve Program (CRP) for the Clean Lakes, Estuaries, and Rivers (CLEAR 30) pilot program to ensure the conservation practice performs according to the required standards. The CLEAR 30 pilot program was introduced in the Agricultural Improvement Act of 2018 as a component of the Commodity Credit Corporation's (CCC) Conservation Reserve Program's (CRP). The CRP CLEAR 30 pilot program offers program participants and owners of expiring CRP contracts with water quality practices to be re-enrolled into 30-year contracts with the option of having a government-managed contractors provide conservation activity plan directed maintenance to the acres under the CRP CLEAR 30 contract. Currently, the CRP CLEAR 30 pilot program is available in all counties and county equivalents nationwide, including U.S. territories and tribal lands. This Request for Information (RFI)/Source Sought is being issued solely for information and planning purposes and does not constitute an Invitation for Bids (IFB), a Request for Proposals (RFP), a Request for Quotations (RFQ) or an indication that the Government will contract for any of the items and/or services contained in this notice. In accordance with FAR 52.215-3, Request for Information or Solicitation for Planning Purposes, the Government will not pay for any information/items submitted in response to the RFI. No determination as to the viability of this requirement has been made at this point and there is currently no solicitation for this effort. Any solicitation resulting from this RFI will be announced separately. BACKGROUND The Agricultural Improvement Act of 2018, also known as the 2018 Farm Bill, created a pilot program, known as Clean Lakes, Estuaries, and Rivers 30 (CLEAR 30), on certain land devoted to specific practices which are limited to those that provide water quality protection by helping to reduce sediment loadings, nutrient loadings, and harmful algae blooms. This pilot program addresses land devoted conservation practices including grass sod waterway, contour grass sod strip, filter strip, riparian buffer, wetland or a wetland buffer, and wildlife habitat buffer. See references: CRP CLEAR 30 pilot program in the Federal Register: https://www.federalregister.gov/documents/2019/12/06/2019-26268/conservation-reserve-program. CRP CLEAR 30 FACT Sheet: https://www.fsa.usda.gov/Assets/USDA-FSA-Public/usdafiles/FactSheets/crp-clear30-pilot.pdf CRP Notice announcing FY2021 CRP CLEAR 30: https://www.fsa.usda.gov/Internet/FSA_Notice/crp_934.pdf To assist CRP CLEAR 30 participants, FSA will enter into a contract with contractors who will undertake conservation maintenance of the land to ensure the practice performs according to the required standards. Maintenance includes but is not limited to activities that help maintain the land's compliance with its conservation practice. Maintenance activities must relate to practice establishment/re-establishment, activities needed to maintain the conservation practice, and are included in the participant's conservation activity plan. They can be traditional CRP management activities or operation and maintenance activities as determined by Natural Resources Conservation Service (NRCS) or a Technical Service Provider (TSP). NRCS will complete a monitoring site visit in year 2 and recommend maintenance activities for years 3-5 followed by a monitoring site visit every 3 years following the year 2 visit, with recommended activities for the years in between the visits, throughout the 30-year CRP contract with the participant. REQUEST FOR INFORMATION For purposes of the RFI/Source Sought, FSA seeks contractors with the ability to service the projects nationwide, including territories and tribal lands, that will address conservation maintenance activities as outlined in the participant's CRP CLEAR 30 contract conservation activity plan. Additional maintenance activities may be deemed necessary by contractor to meet compliance requirements with the CRP CLEAR 30 conservation activity plan. Types of maintenance activities include, but are not limited to, site preparation, temporary cover, seasonal cover, seeding and re-seeding, controlling weeds, including noxious weeds, mowing of brush and herbaceous weeds, prescribed burning, and maintenance of installed structures, including fencing and barriers. For the CRP CLEAR 30 pilot, the offerors will be responsible for all contracting maintenance activities, whether directly providing the service or subcontracting the services, and permits, licenses, tools, equipment and/or infrastructure required to support contractual specifications. FSA is issuing this RFI/Source Sought for information to: (1). Gather industry input on the referenced Performance Work Statement (PWS). (2). Request information on any industry changes or improvements that the Government should consider when looking to achieve best value by improving quality and reducing costs. Please respond to the following questions: Conservation Maintenance Service Questions: What services do you or your company provide for the following? Site Preparation Seeding/Planting Grading/Shaping Cover Maintenance Spot treatment (chemical, mechanical) Prescribed burning Interseeding Do you plan to complete the required maintenance activities as yourself, yourself as a company, or will you be subcontracting the maintenance out? If subcontracting efforts are done, what procedures do you/your company have in-place to ensure requirements are met in the RFI? Describe what federal or state guidelines you/your company will use for compliance with maintenance? What licenses pertaining to the regulated activities listed in section C are currently held by you/your company? Do you have the appropriate licenses and training required to apply herbicide? Please explain how you will meet the needs if herbicide spraying is needed to control weeds. If any permits would be needed, do you/your company have experience or knowledge in obtaining the appropriate permits or post required notices? How would you/your company go about keeping the CRP CLEAR 30 participant updated on when you will arrive at the site to complete the required maintenance activities and how long it will take to complete the required activities? Describe the equipment currently owned or leased that will assist in completing the list of activities in section C above. Contract/General Questions: What states would you/your company be able to provide the services? Have you worked nationwide program? If not, what is your plan to meet this nationwide requirement? If not, what is your recommendation to meet this nationwide requirement? Describe any experience you/your company may have working with federal conservation programs. In what manner will you/your company communicate with FSA and the participant? How many projects are you/your company able to service in a month? Describe ownership and strategic partnerships of the business that will assist in completing the activities listed in section C above? Would you/your company be willing to supply references, and if so, may those references be contacted? Describe how you/your company handle customers that are not satisfied with the work completed? How long between notification of a required activity and mobilization to start the activity? Describe how you/your company will protect participants information during and after the contract is over. How would you/your company go about keeping FSA informed on the work completed and any issues you've run into or discovered at the site? Please describe how the security of contract information will be controlled due to personal information. Describe how you/your company will show that the maintenance activities have been completed. Do you/your company have insurance if damage is done to the CRP acreage or the CRP participant's property? The Government is planning to award Indefinite Delivery Indefinite Quantity (IDIQ) to multiple vendors to address the Clear 30 requirement. Individual task order tailored to the unique program requirements will be competed among the vendors with an active IDIQ. Based on the multiple IDIQ approach, what are the risks and/or impacts associated with this proposed action? The Government is considering IDIQ awards by regional area. What evaluation factors should the Government consider when evaluating contractor's capabilities for the program? What are the risks and/ or impacts associated with this approach? The Government intends to use a firm-fixed type contract. Are there other contract types that would be beneficial to both parties? Pricing Questions: What is your recommended approach for pricing? For example, by state or by project area? Could you provide a sample pricing table/structure (using simulated pricing data) showing your recommended approach? Business Size and Socioeconomic: Indicate business size based on NAICS codes of 237990 & 115112 and socioeconomic status of your company and that, if known, of primary subcontracts typically involved in providing the products and services you provide related to this RFI/Sources Sought. The list does not need to be comprehensive. Indicate whether your company has an active registration in SAM.gov. INSTRUCTIONS TO RESPONDENTS Responses to this RFI/Source Sought are due no later than 1 P.M. ET on August 09, 2021. Questions pertaining to this RFI/Source Sought is due by 12 P.M. ET on July 30, 2021. Please submit all responses electronically via email to Nancy.Harris@usda.gov with the words - USDA Nationwide CLEAR 30 RFI Response in the email subject line by the due date. The following instructions establish the acceptable minimum requirements for the format and content of the responses: Please address all questions and requirements and include feedback on all related topics, including application implementation costs, licensing costs, schedules, and risks. In addition, please feel free to provide other recommendations or suggestions on related subjects or issues. The electronic copy of your responses must be in an Adobe Systems(R) PDF (Portable Document Format) format and readable by the Adobe Acrobat Reader . The first page of the submission must state the RFI title and provide the name, e-mail address, and telephone number for the individual that can be contacted for clarification or questions regarding this submission. To aid in Government review, the total pages for the entire submission are limited to not more than 10 pages and file size shall not exceed 2 MB. Any proprietary data that is included in the response must be marked appropriately at the paragraph level (page level is acceptable for full page table, graphs, etc.). Any response marked proprietary at the document level will not be considered. CONTACT INFORMATION Clarifications or questions regarding this RFI must be submitted in writing via email to Nancy.Harris@usda.gov or bumjoon.pak@usda.gov. All clarifications or questions must reference this RFI. Please use the words - USDA Nationwide CLEAR 30 RFI Question in the email subject line. See the attached Performance Work Statement and Request for Information for detailed information concerning this requirement.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS