Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on May 18, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Information - Procure and Installation of Electric Vehicle Charging Stations (EVCS) (EVSE)

Closed
FY22HQIMCOMRFIFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335999
New
Federal
Prototype Stripline Kickers
Solicitation # MB483335
Brookhaven Science Associates, LLC, operating Brookhaven National Laboratory for the Department of Energy, is soliciting quotes for the design, fabrication, assembly, and delivery of one stripline kicker prototype for the Electron Storage Ring at the Electron-Ion Collider. The scope of work includes the production of a brass RF mockup to verify geometry and impedance, followed by the detailed mechanical design and fabrication of the full prototype, which incorporates kicker bodies, stripline electrodes, cooling features, and ultra-high-vacuum feedthrough interfaces. The contractor is responsible for comprehensive testing and verification, including RF electrical characterization, vacuum certification, and thermal and leak tests, all while adhering to BNL-QA-101 and UHV fabrication practices. The contract is a combined type with a performance period of 18 months from the effective date. Award will be granted to the responsive and responsible contractor offering the lowest total price who meets all technical requirements. Proposals must be submitted via email to the designated Contract Specialist by December 4, 2026, and must include the signed pricing sheet on Enclosure C along with a separate document detailing how the company meets the RFQ requirements. All shipments must comply with ASTM Standard D 3951-10 for commercial packaging and be delivered FOB Destination, Freight Prepaid, to Upton, New York. Domestic vendors must be registered in the System for Award Management, while foreign vendors must complete AMS-Form-050.
Brookhaven National Labor -Doe Contractor

POSTED

about 15 hours ago

DEADLINE

in about 1 month

General Info

NAICS

335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing

Place of Performance

AL

Set-Aside

NONE

Documents

1

HQIMCOM+EVCS+Request+for+Information+Rev1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice title changed. The notice description changed.

Notice updated

Response deadline changed from May 20, 2022 to May 25, 2022. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil
Contacts2 people available
OfficeREDSTONE ARSENAL, AL, 35898-0000, USA
Office AddressREDSTONE ARSENAL, AL, 35898-0000, USA

Full Description

Show more
Please review the attachment "HQIMCOM EVCS Request for Information REV1" for the full RFI. The United States Army Corps of Engineers, Huntsville Center (CEHNC), in support of the Installation Management Command (IMCOM) and Army Material Command (AMC), is seeking information on how many interested and qualified EVCS vendors could provide off-grid charging stations to meet the Government's FY22 need. The Government requires delivery and installation of the charging stations as soon as possible. The following are the required charging station salient features: Level 2 charging capable with SAE J1772 J-Plug (or compatible plug) Standalone and scalable EV charging solution, quickly deployable No engineering, construction, installation, or utility connection requirements No foundation needed but ground anchor connection ready. Zero impact or changes to parking layouts Battery storage with minimum capacity of 40 kWh with 240-mile range Temperature control for use in ambient temperature ranges of 0-120 degrees Fahrenheit Comply with Buy American Act Additionally, the following are desired but optional capabilities: Trickle charge ready to supplement low sun hours. Generating/storing clean energy Charging multiple vehicles simultaneously Access control features, including fob, badge, or card access Emergency power panel Network capability with remote monitoring and maintenance services RFI Whitepaper/Capabilities Statement. The RFI whitepaper/capabilities statement should be as a Microsoft PDF document and due NLT 25 May 2022, 1700 EST. The whitepaper response and or/capabilities statement is limited to 5 single-sided pages and submitted via e-mail only to the Government Point of Contract (POC): Audrey Maack, Contract Specialist, Audrey.M.Maack@usace.army.mil. The RFI whitepaper should address the following: Whether the respondent is a vendor or manufacturer: If a manufacturer, whether the Government can make a direct purchase; or If a vendor, what product would be provided and whether it meets all salient features listed in Paragraph 1.0, If an authorized seller of any specific brands, please list those accordingly. All salient features and optional capabilities, Location of the manufacturing facility Manufacturing and delivery lead times (specifically from order to delivery and installation for up to 500 total units), Elements that cause derated performance (i.e., number of vehicles charging, weather, location, etc..), Maintenance requirements, Method of installation, How would the charging station be used after completion of the final plan (i.e. would the Government eventually be able to tie-in the charging station to the power grid at a later date after installation. If not, what could the Government do with the charging station), and Any alternative methods for off-grid charging stations that might meet the Government's need.

More opportunities from Department Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil

Same awarding agency

NAICS: 236220
Federal
HQ USMC Phase 2 Relocatables Progressive Design Build OTA
Solicitation # CEHNC-HQUSMC-10072026
The U.S. Army Corps of Engineers, through the Engineering and Support Center Huntsville, is initiating a competition for the HQ USMC Phase 2 Relocatables project. This effort utilizes a Progressive Design Build approach under 10 USC 2808a Other Transaction Authority for Construction. The project involves the design and construction of ICD 705-compliant Secured Working Areas (SWA) capable of dual accreditation in accordance with ICD/ICS 705, DoD 5200.1, and NSA 94-106. Key technical requirements include 100% Fiber-to-the-Desk infrastructure, STC 50 acoustic attenuation for all interior spaces, and rigorous RF shielding verified through third-party Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT). The scope encompasses a turnkey solution including civil site development, environmental mitigation, life safety, and comprehensive interior design. The total period of performance is 630 calendar days from the Notice to Proceed, with specific timelines requiring site adaptation within 100 days, assembly within one week of delivery, and final hookup and furniture installation within 40 days of delivery. Facilities must be manufactured at the vendor's secure location and delivered to designated project sites. Key personnel, including the Site Superintendent, Site Safety and Health Officer, and Quality Control Representative, must be U.S. citizens. The government will conduct an Industry Day on October 27, 2026, to provide further details on the acquisition strategy and requirements, with RSVPs required by October 23, 2026. Design deliverables are structured around sequential submissions at 65%, 95%, 100%, and Issued for Construction milestones.
Commercial and Institutional Building Construction

POSTED

13 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS