Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

REQUEST FOR INFORMATION (RFI) DDG 1000 Class Modernization: USS Michael Monsoor (DDG 1001) Conventional Prompt Strike (CPS) Depot Modernization Period (DMP); Large Missile Vertical Launch System (LMVLS) Heavy Lift and Industrial Installation

Open
N00024-27-R-4444Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

DC, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 28 days

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

special-notice

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsea Hq
Contacts2 people available
OfficeWASHINGTON NAVY YARD, DC, 20376-5000, USA

Full Description

Show more

1.0 PURPOSE & OBJECTIVE


PAE Maritime, on behalf of the dPAE Combatants/ DDG 1000 Class Program Office (PMS 500), is conducting market research to assess industry capabilities, engineering rigor, and shipyard infrastructure necessary to accomplish the industrial integration and installation of the Large Missile Vertical Launch System (LMVLS) aboard the USS Michael Monsoor (DDG 1001).


The primary objective of this RFI is to evaluate prospective offerors' specific technical expertise, dry dock/pier-side heavy-lift capabilities, dimensional control methodologies, and integrated production scheduling to execute the installation of a pre-manufactured ~600-ton LMVLS module and associated Conventional Prompt Strike (CPS) warfare alterations.


The questions contained in Section 3.0 are specifically structured to allow industry respondents to demonstrate their understanding of the unique structural, spatial, lifting, and combat systems complexities associated with this depot modernization period.



2.0 TECHNICAL BASELINE & REQUIREMENT SUMMARY


Key technical parameters within the DDG 1001 CPS DMP include:


2.1 Ship Particulars


  • Vessel: USS Michael Monsoor (DDG 1001)
  • Length Overall (LOA) / LBP: 186 m (610 ft) / 182.9 m (600 ft)
  • Beam (Maximum): 24.6 m (80.7 ft)
  • Draft (Navigational / DWL): 8.4 m (27.6 ft) / 7.0 m (23.0 ft)
  • Hull Form & Superstructure: Wave-piercing tumblehome hull; steel hull structure with composite deckhouse; integrated power system (IPS).

2.2 LMVLS Pre-Manufactured Assembly Profile (GFM)


  1. The Government plans to deliver the LMVLS as Government-Furnished Material (GFM) as a fully out-fitted, pre-manufactured modular block. The industrial effort will require rigging, lifting, transferring, lowering, and setting the ~600-ton LMVLS module into the hull pocket within tight spatial and angular tolerances. Additional specifications include:

  • Envelope Dimensions: Approximately 44’ 7” Length × 20’ 8” Width × 41’ 1” Height.
  • Total Lift Weight: Approximately 600 Long Tons (LT).
  • Component Integration: Four (4) launch tubes housing Advanced Payload Modules (APMs) and All-Up Round Canisters (AUR-C), integral shock-isolation foundation assemblies, multi-level bulkheads (down through L5), decks, pre-installed outfitting, and weather deck / 01-level hatch structures.
  • Installation Location: Forward Stack 1400 (reclaimed forward space following MT 61 AGS complete removal).


3.0 TECHNICAL CAPABILITY QUESTIONNAIRE


Interested sources are requested to provide detailed technical narrative responses, supported by engineering calculations, facility specifications, past performance references, and risk mitigation methodologies, addressing each section below.


Section A: Heavy Lift, Rigging & Facility Engineering Capabilities


  1. Lifting Infrastructure & Capacities:

  • Detail your primary crane assets (gantry, floating, portal, or crawler) capable of hoisting and swinging a 600-ton (approx. 1,344,000 lbs) rigid modular assembly.
  • Provide the specific crane load charts demonstrating rated capacity at the required operating radius and minimum hook height necessary to clear DDG 1001’s deck edge, bulwarks, and adjacent deckhouse structures (taking into account the 41’ 1” module height plus lifting beam/spreader bar rigging height).
  • If utilizing a floating crane for the LMVLS, confirm that the selected crane has the clearance to transit under any bridges necessary to arrive at your shipyard.
  • Specify whether the 600-ton lift will be executed in dry dock or pier-side, and detail the structural load-bearing capacity (pounds per square foot / ground bearing pressure) of the quay wall, pier apron, or dry dock wing walls supporting the crane footprint during maximum outrigger or track loadings.

  1. Rigging, Stability & Tandem Operations:

  • Describe your concept for the lift rigging assembly (spreader frames, equalizing grommets, dynamic load monitoring systems) to eliminate torsional deflection, racking, and localized stress concentrations on the pre-assembled LMVLS module during the pick.
  • If a tandem or multi-crane lift is planned, provide your operational methodology for synchronous motion, hook travel rate synchronization, and emergency load re-distribution mitigation.
  • Address environmental limits: What are your maximum allowable wind speed, wave/surge motion (if using floating derrick/crane barges), and tidal envelopes for executing this precision lift?

  1. Ship Mooring, Ballast & Hull Stability During Module Placement:

  • DDG 1001 possesses a unique wave-piercing tumblehome form with strict naval architectural stability limitations. Describe your approach to calculate, model, and monitor ship list, trim, draft changes, and metacentric height during the removal of the forward AGS weight and subsequent setting of the 600-ton LMVLS module (whether afloat at a pier or during block contact in dry dock).


Section B: Precision Alignment, Metrology & Structural Integration


  1. Dimensional Control & Metrology Framework:

  • The LMVLS module must interface with existing ship structure, pre-established shock-attenuation foundations, and tight topside radar cross-section (RCS) deck tolerances. Describe your advanced metrology procedures (e.g., 3D laser scanning, photogrammetry, laser tracking) from initial ship condition surveying through pre-lift verification and final post-weld alignment.


Section C: Industrial Coordination, Schedule Phasing & AIT Co-Existence


  1. Integration of Alteration Installation Teams (AIT) & System OEMs:

  • Installation of the CPS LMVLS requires extensive concurrent work by Government labs and weapon system prime contractors (e.g., Raytheon, Lockheed Martin, NAVWAR).
  • Detail your approach for managing space conflicts, shared lifting/crane services, security access controls for classified weapon compartments, and jurisdictional hand-offs between shipyard trades and specialized weapon installers.

  1. Subcontracting, Teaming & Industrial Workshare:

  • If teaming or significant subcontracting (>20%) is required to satisfy heavy crane, precision metrology, or specialized welding capabilities, outline your proposed organizational hierarchy, prime contractor oversight model, and quality assurance audit procedures.
  • If responding as a Small Business prime under FAR 52.219-14, explicitly demonstrate how your organization will perform at least 50% of the cost of manufacturing and direct industrial labor.


Section D: Risk Assessment, Lessons Learned & Resource Management


  1. Critical Technical & Industrial Risks:

  • Identify what your organization views as the top three (3) critical technical failure modes or schedule risks during the LMVLS module installation (e.g., crane unavailability, structural distortion exceeding cell launch tolerances, GFM delivery mismatches, dry dock schedule creep).
  • For each identified risk, provide specific, mitigation strategies and fallback procedures.


4.0 RESPONSE INSTRUCTIONS & SUBMISSION GUIDELINES


4.1 Content & Page Limitations


  • Cover Sheet: CAGE Code, SAM UEI, MSRA/ABR status, business size under NAICS 336611 (Ship Building and Repairing), primary technical and contracts POCs.
  • Volume I (Technical Capability Narrative): Not to exceed five (5) pages, addressing all questions in Section 3.0.
  • Volume II (Facilities, Equipment & Crane Load Charts): Not to exceed five (5) pages, containing facility schematics, dry dock certified dimensions, dock loading curves, and relevant crane radius/load capacity charts.

4.2 Marking of Proprietary Information


Respondents must clearly mark and isolate any proprietary data, trade secrets, or commercial pricing/cost methodologies. The Government will handle properly marked data in accordance with applicable statutory regulations and protect it as Business Sensitive.


4.3 Inquiries & Submission Points of Contact


Submissions shall be delivered electronically via DoD SAFE or secure email no later than the time and date specified in the official SAM.gov synopsis:


Similar Contracts

Same NAICS industry code

NAICS: 336611
New
DIBBS
LUMBER, NON-WOOD, DIMENS
Solicitation # SPE8E6-27-T-0677
Solicitation SPE8E6-27-T-0677 is a request for quotations issued by the Defense Logistics Agency for the procurement of 100 units of recycled plastic dimensional lumber. The specified product is a non-structural, solid profile lumber with nominal dimensions of 2"x4"x10' in grey color. This environmentally friendly material is designed to be maintenance-free and resistant to insects, salt, chemicals, decomposition, and high-impact, while featuring positive buoyancy and compatibility with standard tools and fasteners. The required delivery date is November 19, 2026, with a delivery timeframe of 10 days after award, shipped FOB Origin to Fort Eustis, Virginia. The contract mandates strict adherence to packaging and marking standards, requiring compliance with ASTM D3951 and MIL-STD-129, with the DLA Master List of Technical and Quality Requirements taking precedence. Palletization must follow RP001 requirements, and shipments must be sent via the fastest traceable means, specifically prohibiting the use of parcel post. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. Legal and regulatory compliance includes the Buy American and Balance of Payments Program, safeguarding of covered defense information per DFARS 252.204-7012, and prohibitions on covered defense telecommunications equipment. Inspection and acceptance will occur at the destination.
Defense Logistics Agency

POSTED

about 7 hours ago

DEADLINE

in 13 days
View Details
NAICS: 336611
New
Federal
Multiple Ship Sustainment Partnership (MSSP) Single Award Indefinite Delivery Indefinite Quantity (SA-IDIQ) Contracts for Fleet Maintenance Availabilities and Incremental Selected Restricted Availabilities on DDG-51 Class Ships Homeported in Norfolk, VA
Solicitation # N00002426R4439414
The Multiple Ship Sustainment Partnership (MSSP) is a Single Award Indefinite Delivery Indefinite Quantity (SA-IDIQ) contract managed by Navsea HQ for the Department of Defense. The contract focuses on the maintenance, modernization, and repair of DDG-51 class ships homeported in Norfolk, VA, with the primary goal of reducing depot maintenance downtime to maximize operational availability. The scope is divided into a Facilitized Lot, covering Chief of Naval Operations scheduled Incremental Selected Restricted Availabilities (ISRAs) and Fleet Maintenance Availabilities, and a Non-Facilitized Lot for Fleet Maintenance Availabilities that do not require specialized shipyard facilities. Work is ordered through a competitively pre-priced task menu to streamline acquisition cycles, and contractors must possess Master Ship Repair Agreement (MSRA) level managerial and technical capabilities. Planned for Fiscal Year 2027, the contract structure consists of three one-year ordering periods. Performance locations vary by task: ISRAs are performed at contractor-provided facilities, while Fleet Maintenance Availabilities and Non-Facilitized Lot tasks are generally performed at Government facilities. This procurement is designated as a partial Small Business Set Aside under NAICS code 336611. The solicitation, numbered N00002426R4439414, was posted on November 17, 2026, with a response deadline of December 17, 2026.
Navsea Hq

POSTED

about 12 hours ago

DEADLINE

in 30 days
View Details
NAICS: 336611
New
Federal
USS MILIUS (DDG 69) 6J1 SIA Bundle# 1, Yokosuka Japan
Solicitation # N6264926RA035
NAVSUP Fleet Logistics Center Yokosuka is soliciting a Firm-Fixed-Price contract for the USS MILIUS (DDG-69) 6J1 SIA Bundle# 1, located at the Commander, Fleet Activities Yokosuka Naval Base in Japan. The scope of work involves a comprehensive repair and maintenance package, including the replacement of VCHT and fuel oil piping, sewage system testing and operations, chemical cleaning of piping, and the installation and removal of scaffolding for surface work. Additionally, the contractor must provide AIT support for the resurfacing of the AS-3851/SPY-1D antenna array. The period of performance is scheduled from January 19, 2027, through April 6, 2027. The government will utilize a Lowest Price Technically Acceptable (LPTA) source selection process, where price is the dominant factor and technical tradeoffs are not permitted. To be eligible for award, offerors must be authorized to do business in Japan and possess an active U.S. MSRA/ABR as a prime contractor. Proposals must be submitted in English by December 17, 2026, at 10:00 AM JST. Key deliverables include an Initial Integrated Production Schedule (IPS), a Schedule of Record, and participation in various project integration and review conferences. All work must be performed in accordance with NAVSEA Standard Item 009-04 and the provided Quality Assurance Surveillance Plan.
Navsup Flt Logistics Ctr Yokosuka

POSTED

about 12 hours ago

DEADLINE

in 29 days
View Details
NAICS: 336611
New
Federal
Propulsor Device Machining
Solicitation # N0016727Q1004
The Naval Surface Warfare Center Carderock Division (NSWCCD) is soliciting quotes for solicitation N0016727Q1004 to perform propulsor component machining for VIRGINIA Class propulsor devices. This firm-fixed-price contract is a total small business set-aside under NAICS 336611. The scope of work involves machining various piece-parts for S1L and R4 configurations, including body tubes, top caps, bottom caps, and center masses. Specifically, the requirement includes 675 units each of S1L top caps, bottom caps, and body tubes, and 160 units each of R4 top caps, body tubes, bottom caps, shim rings, and center masses. While the government provides raw materials for most items, the contractor is responsible for providing mild steel ASTM A106 for the R4 shim rings. The period of performance extends from contract award through July 18, 2027, with final deliveries requested by July 30, 2027. Award will be granted to the responsible quoter providing the lowest evaluated price among those deemed technically acceptable on a pass/fail basis. Key compliance requirements include CMMC Level 2 certification, adherence to ANSI/ASQ/ISO 9001:2015 quality management systems, and strict unique item identification per MIL-STD-130. All finished parts must be cleaned with acetone and packaged according to applicable drawings. Quote packages, including a cover sheet with the company name, point of contact, and CAGE code, are due by 12:00 PM Noon on November 12, 2026.
Nswc Carderock

POSTED

about 12 hours ago

DEADLINE

in 14 days
View Details
NAICS: 336611
New
DIBBS
43--SEAL ASSEMBLY,SHAFT
Solicitation # SPE7M1-27-T-2774
Solicitation SPE7M1-27-T-2774, issued by the DLA Weapons Support Maritime Supply Chain, is for the procurement of three shaft seal assemblies under NSN 4320-01-121-0214. The requirement specifies part number 1304F30G04 and identifies potential sources including Curtiss-Wright Electro-Mechanical, Lynn Electronics LLC, and True Position, Inc. The contract is a total small business set-aside with a delivery timeline of 175 days, featuring a need ship date of May 7, 2024, and an original required delivery date of November 18, 2024. Delivery is FOB Origin, with the final destination for inspection and acceptance being the DLA Distribution Puget Sound facility in Bremerton, Washington. The contract mandates strict adherence to technical and quality standards, incorporating the DLA Master List and requiring Item Unique Identification in accordance with MIL-STD-130 and DFARS 252.211-7003. Packaging and marking must comply with MIL-STD-2073-1E, MIL-STD-129, and RP001. Key regulatory prohibitions include the use of Class I ozone-depleting chemicals and the acquisition of covered defense telecommunications equipment per DFARS 252.204-7018. Administrative requirements include the use of the Wide Area Workflow system for invoicing and compliance with DFARS 252.204-7012 regarding the safeguarding of covered defense information.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

about 12 hours ago

DEADLINE

in 12 days
View Details

More opportunities from Department Of Defense → Navsea Hq

Same awarding agency

NAICS: 336611
New
Federal
ex-CGN9 Long Beach Dismantlement and Disposal
Solicitation # N0002426R4164
NAVSEA HQ is soliciting proposals for a firm-fixed-price contract to prepare, transport, dismantle, de-militarize, and dispose of the ex-Long Beach (CGN 9) cruiser and its defueled reactor plants. The scope of work involves moving the vessel from PSNS&IMF in Bremerton, Washington, to a contractor-selected disposal site. The contractor is responsible for all personnel, equipment, and facilities, ensuring strict compliance with NRC radiological regulations, DOT requirements, and hazardous waste laws. Key deliverables include a decommissioning work plan, transportation and tow plans, and various certifications for demilitarization and hazardous material disposal. The period of performance is scheduled from April 1, 2027, to September 30, 2032. Award will be based on a best-value tradeoff between past performance and price, provided the technical and management approach is deemed acceptable. The pricing structure includes firm-fixed-price CLINs for transport and dismantlement, a non-separately priced CLIN, and a three million dollar incentive fee for radiological regulatory compliance. Due to the sensitive nature of the work, the contract mandates strict protection of Unclassified Naval Nuclear Propulsion Information (U-NNPI) in accordance with NN-801 and NIST SP 800-171. Additionally, key personnel must be U.S. citizens, and the contractor must provide a 20 percent performance bond before taking possession of the vessel.
Ship Building and Repairing

POSTED

5 days ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS