Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on June 19, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Information (RFI) for the MQ-1C Gray Eagle Unmanned Aircraft Systems Engine Replacement

Closed
W58RGZ-18-R-0221Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336412
New
Federal
Fd203062700424 (2995-01-290-1428J)
Solicitation # FD20302700424
The 421st Supply Chain Management Squadron at Tinker Air Force Base is conducting market research via a Sources Sought Synopsis to identify potential manufacturing sources for a Valve Assembly for the F-118 engine, identified by NSN 2995-01-290-1428JU. This effort is intended to determine if the requirement can be competitive or a Small Business Set-Aside under NAICS code 336412. The government is seeking interested parties capable of providing all labor, materials, facilities, and equipment necessary for the manufacture, testing, preservation, packaging, and delivery of completely serviceable units, including the management of supply chains, long-lead parts procurement, and obsolescence issues. To be considered, potential sources must submit a Source Approval Request (SAR) package and a Company Profile to the Oklahoma City Small Business Office. Qualification requires that the company has manufactured the subject or a similar item within the past 36 months for the Department of Defense or the Original Equipment Manufacturer. Essential requirements include a valid Quality Assurance Certificate such as ISO 9001, AS9100, or NATO AQAP-2070, and the ability to provide detailed Process Operation Sheets and Inspection Method Sheets. Interested businesses of all sizes and socioeconomic categories are encouraged to respond with their company details, CAGE code, and documentation of their capabilities. This notice is for planning purposes only; no solicitation is currently available, and no funds have been allocated at this time.
Ok DLA Aviation At Oklahoma City

POSTED

about 11 hours ago

DEADLINE

in 10 days
NAICS: 336412
New
Federal
Igniter, Spark Gas T (3D)
Solicitation # SPRTA127R0103
Solicitation SPRTA127R0103 is a request for proposal issued by the Defense Logistics Agency Weapons Support for the procurement of 159 Gas Turbine Spark Igniters (NSN 2925015034385RV, Part Number 9045600-1) for TF33 engines. These steel components are designated as Critical Safety Items and are used to provide high voltage, high energy pulses to ignite fuel in the combustion section of the engine. The government is seeking firm unit prices for a quantity range between 40 and 239 units, with delivery expected to begin as early as July 31, 2028, at a rate of 10 units per month. The procurement is intended as a limited source action under FAR 6.302, identifying Unison Industries, LLC as a qualified source. The contract mandates strict adherence to quality and safety standards, requiring ISO 9001:2000 certification and Higher Level Contract Quality Requirements. Deliverables must comply with MIL-STD-2073-1 for packaging, MIL-STD-129 for marking, and MIL-STD-130 for Item Unique Identification (IUID). Additionally, all wood packaging materials must be heat-treated and certified per ISPM 15 and ALSC standards. Inspection and acceptance will occur at the point of origin, with shipping terms set as FOB Origin. Proposals are due by November 20, 2026, and will be evaluated based on a combination of price and past performance.
Ok DLA Aviation At Oklahoma City

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 336412
New
DIBBS
COVER ASSEMBLY, METE
Solicitation # SPE4A7-27-T-1569
Solicitation SPE4A7-27-T-1569 is a fixed-price procurement issued by the Defense Logistics Agency for five units of Cover Assembly, Mete, identified by NSN 2915011735343. This procurement is designated as an Air Force Critical Safety Item and requires production in accordance with TDP Rev A Gen 8 and reference drawing NR 13873 EI-011735343. The delivery timeline for the primary items is 263 days, with an FOB Origin designation for both inspection and acceptance. A critical requirement of this contract is the First Article Test, which requires the delivery of three units to Tinker Air Force Base within 30 calendar days of the contract date for government testing. The contractor must maintain a quality management system compliant with SAE AS9100 and adhere to strict sampling methods, including zero-based sampling plans. Packaging must comply with ASTM D3951 and MIL-STD-129, and all payment requests must be processed through Wide Area WorkFlow. Offerors must comply with domestic material restrictions, including the Buy American Act and the Berry Amendment, and are prohibited from using additive manufacturing processes unless specifically authorized. The solicitation also mandates compliance with CMMC Level 2 self-assessment and DFARS cybersecurity reporting requirements. Small business joint ventures must provide specific socioeconomic representations, and all offerors must certify they will not provide covered telecommunications equipment or services.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

1 day ago

DEADLINE

in 7 days
NAICS: 336412
New
DIBBS
ADAPTER, INPUT, CONTR
Solicitation # SPE4A7-27-R-X044
Solicitation SPE4A7-27-R-X044 is an Indefinite Delivery Contract issued by the DLA Weapons Support ASC Supplier Oper AE and AF Div for the procurement of an Engine Control Input Assembly Adapter (NSN 1560-01-101-9743). This is a total small business set-aside for a Navy-identified Critical Safety Item. The contract requires a total delivery period of 780 days after receipt of order, which includes specific timelines for production, government production lot testing evaluation, and final delivery to MCAS Cherry Point, North Carolina. The award will be based on a best-value trade-off assessment, with significant weight placed on past performance, specifically SPRS assessments and historical quality and delivery compliance. The contractor must adhere to stringent quality and security standards, including CMMC Level 2 certification and compliance with ITAR and EAR export controls. Technical data access is restricted to approved US/Canada Joint Certification Program participants. Packaging and marking must strictly follow MIL-STD-129 and MIL-STD-130 for unique item identification. Inspection occurs at the source, while acceptance is at the destination. Payment and invoicing are processed through the Wide Area Workflow (WAWF) system. Offerors must submit quotes via email and maintain active registration in the System for Award Management.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

1 day ago

DEADLINE

in 13 days
NAICS: 336412
New
DIBBS
DISK, VALVE
Solicitation # SPE4A7-27-T-1601
Solicitation SPE4A7-27-T-1601 is a request for one Valve Disk, identified as NSN 2915-01-528-5417 and designated as a Navy Identified Critical Safety Item. The procurement is managed by the DLA Weapons Support ASC Supplier Oper AE and AF Div, with a required delivery of 160 days after order, targeting a ship date of April 6, 2027. Delivery is set as FOB Origin to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. All quotes must be submitted via the DLA Internet Bid Board System (DIBBS). Offerors are encouraged to provide quantity ranges to accommodate volatile demand and must provide details regarding dealer or distributor certifications. The contract mandates strict adherence to quality and material standards, including SAE AS9100 for quality management and MIL-STD-2073-1E and MIL-STD-129 for packaging and marking. Compliance with the Buy American Act and the Berry Amendment is required, and any use of non-domestic materials must be disclosed. Notably, items produced via additive manufacturing are prohibited unless specifically authorized. The award process involves origin inspection and acceptance, with sampling conducted per MIL-STD-1916 or ASQ H1331. Payment and invoicing must be processed through the Wide Area WorkFlow (WAWF) system, and contractors must register via the Account Management and Provisioning System (AMPS) to maintain access to the Vendor Shipment Module.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

1 day ago

DEADLINE

in 7 days

General Info

NAICS

336412 - Aircraft Engine and Engine Parts Manufacturing

Place of Performance

N/A, AL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Rsa
Contacts1 person available
OfficeREDSTONE ARSENAL, AL, 35898-5000, USA
Office AddressREDSTONE ARSENAL, AL, 35898-5000, USA

Full Description

Show more
MQ-1C Gray Eagle Unmanned Aircraft Systems Engine Replacement Request for Information (RFI) W58RGZ-18-R-0221 Version 1 19 June 2018 Synopsis The US Army Aviation Turbine Engines Project Office (ATE PO), herein after referred to as the US Government is seeking information, performance capabilities, and technical data on a Commercial Off the Shelf (COTS) or Non-Developmental Item (NDI) engine that will require minimal modification and integration for primary application to MQ-1C Gray Eagle Unmanned Aircraft System. Modification and integration activities are expected to be rapid and completed within two years of contract award. Both system and component level data are sought, which describe candidate technologies of interest, their current capabilities, estimated costs, schedules, and risks. This data will assist the US Government's planning efforts to procure a solution for current and future Army Aviation applications. This Request for Information (RFI), in accordance with Federal Acquisition Regulation 15.201(e), is issued for the purpose of preliminary planning for potential acquisition of a MQ-1C Gray Eagle engine replacement and is not a Request for Proposal (RFP) or a promise to issue an RFP in the future. There is no firm requirement at this time. Further, the US Government is not seeking proposals and will not accept unsolicited proposals. This does not commit the US Government to contract for any supplies or services in the future. All information submitted in response to this announcement is voluntary. Failure to respond to this RFI will not preclude participation in any future RFP, if applicable. If a future solicitation is released, it will be synopsized in FedBizOpps. The US Government may also utilize other potential means such as Specific Catalogs, Product Directories, Trade Journals, Seminars, Professional Organizations, Contractor Briefings, In-house Experts, Vendor Surveys, and Trade Shows. There will be no compensation by the US Government for any cost incurred in providing a response. A response to this notice is not an offer and no offer can or will be accepted by the US Government to form a binding contract. 1.0 Introduction The US Government is interested in obtaining information on current and planned technologies, engine capabilities, and costs for materiel solutions that could satisfy existing capability needs. 2.0 Background The US Government is in the planning stages for the procurement of a COTS or NDI engine to replace the current engine system within the MQ-1C Gray Eagle fleet. Uninstalled and installed engines account for roughly 400 engines. Current planning envisions a timeframe which will consist of a competitive two year rapid prototyping, integration, and testing contract followed by a production contract. Offered engine systems will not be limited to the current capabilities of the Gray Eagle and should offer expanded reliability and system endurance. The US Government has not excluded this replacement effort based on engine types. Piston, turbine, hybrid electric, electric, and other engine variations will all be reviewed. The US Government also has an added interest in this engine being compatible with Future Unmanned Aerial System (FUAS). There is a significant amount of conceptual design and mission benefit analyses that needs to be performed to refine the requirements for the envisioned FUAS family of aircraft. Propulsion technology has been identified as a key enabling technology that needs to be developed for these systems. As such, the US Government is interested in growth opportunities to potential FUAS use to enable commonality. 3.0 Requirements The US Government aims to focus procurement assets on engine technology that meets military requirements. Primary focus is on the requirements/goals surrounding reliability and availability of the engine; however, current operational capabilities cannot be regressed. Engine conformance or equivalency with the following specifications and/or current capabilities are requested: - Ability to begin production for the MQ-1C Gray Eagle systems within a two year timeframe post contract award - Conform to dimensions similar to 32.1" L X 25" H X 30.6" W - Maximum weight with auxiliary systems (engine, driveshaft, gearbox, controls, intake system, exhaust system, fuel system, and ignition system) less than 450 lbs. - Rated between 180 - 220 shp at Sea Level Static, Standard Day - Equipped with Full Authority Digital Engine Control (FADEC) or similar control system - FADEC must support a digital/analog interface for commanding the FADEC and a Controller Area Network Bus interface to provide status from the FADEC - Heavy fuel capability (JP-5, JP-8, JP-8+100, Jet A, Jet A-1, or variants) over its complete environmental and operating envelope for all steady-state and transient operations - Able to operate in a temperature range of at least -26 F to 248 F - Able to operate at an altitude of 29,000' Mean Sea Level (MSL) or higher - Enable the capability of supporting 48 hour mission with 950 lbs. of fuel at a cruise altitude of 10,000' MSL and provide takeoff and cruise/loiter specific fuel consumption - Engine design life of greater than 1,800 hours Responses should include information on how proposed engines will comply with the MQ-1C Gray Eagle mission profile: - Max takeoff weight of 4,200 lbs. - Mission time of up to 48 hours - Operates in all types of environments - Operates at an attitude of 29,000' MSL - Take-off altitude of up to 9,000'MSL Responses should also include: - Existing engine specifications - The engine's current Technology Readiness Level (TRL) and Manufacturing Readiness Level (MRL) and the basis for that TRL and MRL - The path to TRL 8 within two years for the intended application of this engine if modification is required - Reliability, Availability, and Maintainability metrics o Showing a MTBF o Showing a MTTR o Showing a MTBSA o Showing a MTBEFF Description of any modifications that would need to be done to existing MQ-1C Gray Eagle systems to facilitate integration including but not limited to: fuel systems, electrical systems, mounts, drive system, gear box, etc. - Description of effort and a Rough Order Magnitude (ROM) of projected cost for prototyping, integration, and testing of the offered engine into a MQ-1C Gray Eagle - ROM for projected production costs - Notional schedule for prototyping, integration, and testing - Information on scalability, growth, and improvement opportunities of engine design for current MQ-1C Gray Eagle system and FUAS - Information on existing engine reliability, qualification, lifing analysis and certification data - If the proposed engine does not meet the current engine specifications, describe how the offered engine and modifications to the current system can be made to satisfy current mission profiles - Any other information that would be needed in order to facilitate better information provided to the Army or provide the ability to respond to related future RFP - Information on the willingness and desire to attend an Industry Day. Include number of attendees, meeting place requirements, and if foreign nationals will be attending The information provided by industry will be used to assess the current state of technology and whether the technology can satisfy current capability needs and reasonably support an affordable, achievable, moderate risk acquisition program. The requested information is for internal planning purposes only and will not be publicly released outside the Government RFI Assessment Group. It is the intent of the US Government that industry responses to this RFI will be considered with respect to the development of a future RFP, should a decision be made to proceed. The US Government intends to engage industry on their RFI submittals by Government announcement via an Industry Days within approximately one month after responses have been received or via other face to face engagements as determined by the US Government. The intent of these engagements is to conduct market research and for respondents to discuss select technologies described in their RFI response, provide insights to the challenges they face in developing potential MQ-1C Gray Eagle engine replacement to meet US Government requirements, and the risks associated with developing an executable moderate risk acquisition program. Respondents are not required to participate in these discussions. Should a formal RFP be issued in the future, any and all respondents and non-respondents will be eligible to compete for the acquisition. Submission of a response to this RFI is not required to submit a proposal in response to any RFP which may be released in the future or to be awarded any contract pursuant to same. 4.0 Respondent Responsibilities Respondents are advised that the US Government will not pay for any information, discussions, or administrative costs incurred in response to this RFI; all costs associated with responding to this RFI will be solely the responsibility of the respondent. 5.0 Future Acquisition Plans There is no guarantee that the MQ-1C Gray Eagle engine replacement program will advance to an acquisition based upon the results of the information provided by industry. No determination of a path forward for MQ-1C Gray Eagle engine replacement has been made at this time. 6.0 RFI Respondent Instructions All final responses must be received to the address below no later than 20 days after posting of the RFI to FedBizOpps. All information submitted by RFI respondents will be handled as procurement sensitive information submitted to the protections, restrictions, and requirements set forth in FAR 3.104. Further, all information submitted by respondents and all review material developed by the US Government and their support contractors will be marked and protected as procurement sensitive data and each individual involved with the ATE PO RFI will execute an agreement expressly prohibiting the release of RFI respondent information. Proprietary information should be clearly marked. No classified documents shall be included in your response. Please be advised all documents or electronic media submitted in response to the RFI becomes the property of the US Government and will not be returned. Two hardcopy responses and two electronic copies of the RFI response via Compact Disc are requested. There is no page limit for RFI responses. Please provide your firm/company's name and address, point of contact with telephone number, and e-mail address. Any questions on this RFI must be directed to the Contracting Officer, Shirley Ross, via email at shirley.b.ross2.civ@mail.mil, no later than 20 days after the RFI announcement. No questions will be accepted telephonically nor will any responses to questions be provided telephonically. The mailing address for questions and responses to the RFI is: Army Contracting Command - Redstone Attention: CCAM-PLA, Shirley Ross, Contracting Officer Room 4228, Building 5304 Martin Road, Redstone Arsenal, AL 35898-5280 Hand delivery of the requested RFI responses is acceptable. If hand delivered, delivery must be made by the response date/time to the address below: US Army Contracting Command - Redstone Attention: CCAM-PLA, Shirley Ross Sparkman Office Complex 5300 Martin Road, 1st Floor Redstone Arsenal, AL 35758, Phone: (256) 842-7383.

More opportunities from Department Of Defense → W6QK Acc-Rsa

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS