Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on October 3, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Information: SUU-72 Pylon Upper Panel Replacement

Closed
SUU-72_Upper_PanelFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

FL, USA

Set-Aside

NONE

Documents

2

AFNWC SUU-72 Pylon Upper Panel Replacement RFI

PDF, High priority: read this firstrfi
High

SUU-72 Upper Panel Questions and Answers

PDF, Low priority1 page · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2103 Afnwc Ndb Pzne
Contacts2 people available
OfficeEGLIN AFB, FL, 32542, USA
Office AddressEGLIN AFB, FL, 32542, USA
Contacts

Full Description

Show more
AFNWC/NDB is seeking information from industry regarding procurement and replacement of the SUU-72 Pylon Upper Panels. SUU-72 Pylons have been in desert storage and long-term environmental exposure has resulted in corrosion damage. Repair of damage must be performed before hardware is modified to a SUU-103 configuration. Corrosion damage is primarily focused on the Upper Panel, an aluminum bulkhead in the Pylon's basic structure. Due to the type of corrosion, Upper Panels are planned to be replaced under this effort. The existing bulkhead aluminum alloy material is no longer acceptable for use on US Air Force weapons systems. A replacement alloy needs to be identified, replacement bulkheads manufactured, and installed into the Pylons. Refurbished SUU-72s will be expected to meet a minimum 30-year service life. Question due no later than 4:00 P.M. CST on 26 September 2024

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS