Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Oral Quote (RFQ) for Industrial Mist Fans

Closed
FFQ-Oral-FansFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333413
New
DIBBS
FAN, VANEAXIAL
Solicitation # SPE8E9-26-T-3546
Solicitation SPE8E9-26-T-3546 is issued by the DLA Troop Support Construction and Equipment MRO Service for the procurement of 10 vaneaxial fans, identified by NSN 4140-00-289-8801. The required hardware must be 440 volts, 60 Hz, three phase, and comply with basic specification MIL-PRF-18953C(1) and QPL-18953-30. A critical requirement for this award is that the manufacturer must be Qualified Products List (QPL) approved at the time of contract award. The items are designated as critical application items, and the contract prohibits the intentional addition of mercury or mercury-containing compounds, with specific exceptions for functional components as specified by NAVSEA. Delivery is required within 203 days after receipt of order, with shipping terms set as FOB Origin and the final destination being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. Inspection and acceptance will occur at the destination. Packaging must adhere to MIL-F-18953 and MIL-STD-2073-1E, with marking following MIL-STD-129 and a general requirement to avoid plastics for wrapping or cushioning where possible. Invoicing and receiving reports must be processed electronically through the Wide Area WorkFlow (WAWF) system. This solicitation is open to quotes via the DIBBS portal and includes a price evaluation preference for HUBZone concerns.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

about 21 hours ago

DEADLINE

in 4 days
NAICS: 333413
New
Federal
Dust Collector with Installation
Solicitation # FA488726Q0054
Solicitation FA488726Q0054 is a Firm-Fixed Price contract for the procurement and installation of a wood dust collection and ambient-air filtration system at Building 948, Luke Air Force Base, Arizona. The requirement consists of two primary line items: the provision of one 7.5 HP dust collector meeting specific salient characteristics, including NFPA 664 compliance and a 230-gallon dump bin, and the professional installation of the unit, including new galvanized ducting, a custom capture plenum, and electrical work. The project requires the removal of the old system and all new packaging, with a mandatory minimum 12-month parts and labor warranty. The required delivery and completion date is December 10, 2026. This is a total small business set-aside with a 10 percent price evaluation preference for HUBZone small business concerns. Award will be made to the technically acceptable offeror with a Green or better Supplier Performance Risk System rating and the lowest Total Evaluated Price. Technical acceptability is determined on a pass/fail basis covering delivery schedule, technical approach, and material specifications. Prospective contractors must coordinate base access through the contracting officer, providing REAL ID compliant identification and vehicle documentation. It is noted that funds are not presently available, and no award will be made until such funds are secured. All invoicing and payment processing must be conducted through the Wide Area WorkFlow system.
FA4887 56 Cons Cc

POSTED

1 day ago

DEADLINE

in 2 days

AI Contract Overview

Show more

This solicitation is a Request for Oral Quote (RFQ) for four new industrial mist fans under the solicitation number FFQ-Oral-Fans, issued by the Department of Defense through the FA9101 AEDC PKP Procurement Branch at Arnold Air Force Base, Tennessee. The acquisition is a 100% Total Small Business Set-Aside under FAR 19.5, with NAICS code 333413, and is conducted under the Revolutionary FAR Overhaul (RFO) 12.201-1(d), making this oral solicitation the only formal procurement vehicle—no written solicitation will be issued. Respondents must submit technical specifications, manufacturer OEM data sheets, and preferred availability windows for an oral dialogue scheduled for June 15, 2026, via email to the primary and secondary points of contact by June 12, 2026, at 12 p.m. Central Time. Pricing cannot be included in initial submissions but must be held firm for 60 calendar days following the due date as per the revised FAR 52.212-1 provision. All vendors must be registered in SAM.gov, and failure to meet this or other mandatory requirements, such as participating in the oral solicitation or providing a technical solution, renders a quote non-responsive. The equipment must be new and comply with strict technical specifications including a minimum 65,000 BTU/h cooling effect, nozzle-free centrifugal atomizing technology, an 85-gallon integrated water tank, 80-foot cooling reach, 3,000-square-foot coverage, 40 hours of continuous run time, 110V/120V AC power, and heavy-duty mobility via integrated wheels or casters for industrial terrain. Delivery is FOB Destination to Arnold AFB, TN, by June 24, 2026, with no freight charges permitted. Payment will be made exclusively through the Government Purchase Card (GPC), and vendors must certify they will not charge for GPC usage fees or freight on FOB Destination orders. No contract financing will be provided. Evaluation will follow a Lowest Price Technically Acceptable (LPTA) approach, where quotes are reviewed from lowest to highest price until one meets all technical and compliance pass/fail gates, which include SAM registration, GPC compliance, contractor responsibility, technical adherence, and explicit affirmation of no exceptions to the RF

General Info

DoD requests oral quotes for industrial mist fans; small businesses only, due June 12, 2026.

Agency

Department Of Defense → FA9101 Aedc Pkp Procrmnt BranchView Agency

NAICS

333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment ManufacturingView NAICS

Place of Performance

TN, USA

Set-Aside

SBA

Documents

(2)

Specifications for Industrial Misting Fans

PDFspecifications

Oral Solicitation RFQ for Industrial Mist Fans

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9101 Aedc Pkp Procrmnt Branch
Contacts2 people available
OfficeARNOLD AFB, TN, 37389-1332, USA
Organization / Agency
Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch
View Agency Profile
Office AddressARNOLD AFB, TN, 37389-1332, USA
Contacts
Aliyah P. Moore

Full Description

Show more

Please see attachments.

More opportunities from Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch

Same awarding agency

NAICS: 541330
New
Federal
Request for Whitepaper - AEDC Facility Digital Twins and Predictive Analytics
Solicitation # FA910126RWP-DigitalTwins
The Department of the Air Force is seeking innovative solutions through a Request for Whitepapers to establish an Other Transaction Agreement under 10 U.S.C. 4022 for the Arnold Engineering Development Complex (AEDC). The primary objective is to modernize facility documentation by creating high-fidelity, as-built 3D digital twins and predictive analytics for critical test infrastructure. The program begins in Fiscal Year 2027 with an initial prototype phase focusing on the Von Karman Gas Dynamics Facility, covering approximately 260,000 square feet of footprint and 1,040,000 square feet of scan area, with plans to eventually scale to over 2.5 million square feet across the complex. Technical requirements specify engineering-grade models with a minimum Level of Detail (LOD) 350, though LOD 400 is highly desired for primary connection points. Deliverables must maintain a dimensional accuracy of +/- 1/4 inch, globally referenced to project survey control, and utilize Autodesk Revit for architectural/structural models and Autodesk Plant PDM for intelligent process models. All work must be performed within the continental United States, and performers must comply with strict cybersecurity standards, including NIST SP 800-171 and CMMC Level 2 self-assessment. The agreement is not a standard procurement contract and is not subject to the Federal Acquisition Regulation. Instead, it utilizes a milestone-based, firm-fixed price structure for the base phase. Evaluation of submissions will be based on technical merit, innovation, program management, and risk. Eligible participants must certify as small businesses or nontraditional defense contractors. The submission deadline for whitepapers is October 8, 2026, and a site visit is scheduled for September 30, 2026.
Engineering Services

POSTED

2 days ago

DEADLINE

in 26 days
View Details
NAICS: 541330
New
Federal
RWP Independent Air Supply
Solicitation # FA9101269IAS
The Arnold Engineering Development Complex at Arnold Air Force Base, Tennessee, is seeking white papers for the Independent Air Supply project under the authority of 10 U.S.C. section 4022. The objective is to establish a secondary, dedicated, and conditioned air supply for an existing test cell. The scope of work includes the demolition of existing equipment and the design, procurement, fabrication, and installation of a system featuring at least four modular compressor units, dryers, heaters, expansion turbines, and a final mixing chamber. The system must integrate with base utilities and utilize a local control network featuring Emerson RX3i PLCs, Proficy Machine Edition programming, and a Simplicity HMI interface capable of supporting simultaneous unclassified and classified operations. The government may award up to two prototype agreements, with a preference for base milestone pricing around 250,000 dollars, though this is not a strict ceiling. All final engineering drawings and analyses must be stamped by a Professional Engineer licensed in Tennessee, and air purity must comply with ISO 8573-1 Class 1P. Evaluation of submissions will involve a go/no-go compliance check followed by a qualitative review of technical capability, schedule feasibility, and cost realism. The submission deadline for white papers has been extended to September 23, 2026. Interested parties must verify their CAGE code, Joint Certification Program, and CMMC status to access export-controlled Distribution D documents.
Engineering Services

POSTED

4 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS