(REBID) Request for Proposals: Existing Main Metered Service Modifications to Existing Generator System at City Hall Building for City Hall And Police Department
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Norco is seeking proposals from qualified California-licensed C-10 Electrical Contractors to perform modifications to the existing main metered electrical service and integrate it with the current generator system at City Hall, especially addressing critical loads for the Police Department. The project involves reconfiguring electrical distribution to separate emergency and non-emergency circuits, ensuring code compliance, safety, and minimal disruption to public safety operations by performing all work on weekends with support from a temporary generator. The contractor will handle disconnecting and replacing bussing, installing new circuit breakers and conductors, updating arc-flash hazard labeling, and relocating circuits. Responsibilities also include obtaining permits, scheduling inspections, coordinating with Southern California Edison and other local agencies, conducting required testing, commissioning, and providing complete documentation, training, and closeout. All work must comply with California Electrical Code, NFPA 70, NFPA 110, IEEE standards, Cal/OSHA, and Southern California Edison requirements, with the contractor managing all regulatory compliance and permitting tasks. The project must be completed within 45 working days, with liquidated damages of $1,000 per day for delays. The contractor must hold a valid CSLB C-10 license and possess city business licenses, maintain a clean and accessible worksite, and ensure site safety. A 10% bid bond is required, and material readiness must be certified before mobilization. The approved project plans require the contractor to obtain building permits and schedule timely inspections with the City of Norco Building Department.
General Info
Agency
Contract Value
$1,598NAICS
Place of Performance
2870 Clark Avenue, Norco, CA 92860, CA, USSet-Aside
Awardee
Award Issued Date
Documents
(4)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Project Address: 2870 Clark Avenue, Norco, CA 92860
The project aims to deliver a reliable, code-compliant service entrance configuration and integrate emergency power to ensure operational continuity for City Hall and the Police Department. The work includes reconfiguring electrical distribution to clearly separate emergency and non-emergency loads, achieving selective coordination, and updating arc-flash hazard labeling. To minimize disruption, all work will be performed on weekends only, supported by a temporary generator rated at 40 kW or larger to maintain power for critical systems. The contractor will be responsible for administering all permits, scheduling inspections, and coordinating with Southern California Edison (SCE), the City of Norco, and the Corona-Norco Unified School District as needed. Comprehensive testing, training, and documentation—including accurate as-built drawings and full closeout submittals—are required.
The scope of work includes disconnecting existing conductors to the automatic transfer switch (ATS), installing new copper bussing, removing and replacing bussing between sections of the main service, and providing new circuit breakers and conductors to reconfigure Sections One and Two. Emergency and non-emergency circuits will be relocated accordingly, and labeling will be updated to clearly identify “Generator Power Only.” Approximately three Z-bars will be replaced as part of bussing modifications. The contractor must procure all materials prior to starting work and maintain the electrical room in a clean, accessible condition throughout the project. A detailed weekend phasing plan must be implemented to manage outages and ensure Police Department continuity.
All work shall comply with the California Electrical Code (NFPA 70), NFPA 110, IEEE standards, Cal/OSHA requirements, Southern California Edison service standards, and City of Norco permitting processes. The contractor is responsible for all permits, fees, inspections, utility approvals, and compliance with applicable regulations. Special conditions include maintaining critical operations, limiting work to weekends, completing the project within 45 working days, adhering to security protocols, prevailing wage requirements, and DIR registration. The contractor must certify material readiness before mobilization and ensure site safety, including electrical room cleanliness and accessibility.
There are 45 working days allowed to complete the construction portion of this project. Liquidated damages shall be assessed at $1,000.00 per working day.
The project plans have been approved by the City of Norco Building Department, the contractor is responsible for obtaining a building permit with the City for the construction of the project and scheduling inspections with the building inspector in a timely manner.
Notes: The successful bidder shall be licensed according with the provisions of the Business and Professional Code and shall possess a Class C10 – Electrical Contractors issued by Contractors State License Board (CSLB) license at the time this contract is awarded. The successful Contractor and his/her subcontractors will be required to possess business licenses from the City of Norco.
Bid Bond: 10.00%