Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on March 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

(REBID) Request for Proposals: Existing Main Metered Service Modifications to Existing Generator System at City Hall Building for City Hall And Police Department

Awarded
CO26-001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Federal
Full Start-Up Commissioning of Data Center Cooling Infrastructure and UPS battery
Solicitation # W912HQ26S0077
The U.S. Army Corps of Engineers Headquarters is soliciting a firm-fixed-price contract under Simplified Acquisition Procedures for the full start-up and commissioning of existing data center environmental control systems at Building 2592 in Alexandria, Virginia. The scope of work includes the commissioning of twelve Liebert CRV units, two Liebert IRC controllers, and one Multistack rooftop glycol chiller based on original design specifications. Additionally, the contractor must perform the replacement and EPA-compliant disposal of 80 Eaton Uninterruptible Power Supply batteries, including all necessary testing and calibration. All work must be completed within 90 days of the award. This procurement is a small business set-aside with a size standard of 19 million dollars. A mandatory site visit is required on September 18 at the Cude Building 2592, and offers are due by September 25. To be eligible, offerors must be U.S. citizens or nationals, possess a valid government ID and driver's license, and be registered in the System for Award Management. Award decisions will be based on the most advantageous offer, evaluating technical capability, past performance, and price. Proposals must include a technical work plan limited to ten pages and a detailed price proposal on company letterhead. The contract requires a payment and performance bond, adherence to specific wage determinations, and compliance with DFARS cybersecurity and EPA disposal regulations.
W4LD USA Hecsa

POSTED

about 3 hours ago

DEADLINE

in 1 day
NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture, and secured to the existing concrete slab using Grade 5 or higher galvanized anchor bolts. The project also includes the installation of two new NEMA 3R automatic transfer switches and the performance of load bank testing for both units. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ, with an estimated magnitude between $250,000 and $300,000. The period of performance is 270 calendar days from the Notice to Proceed, with a requirement to submit a project schedule within 15 days of that notice. Work must be performed during regular business hours, Monday through Friday, from 7:30 am to 4:00 pm. Award will be based solely on the lowest total evaluated price. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including the signing of DHS non-disclosure agreements and the acquisition of ICE-provisioned PIV cards for personnel. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 5 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves the provision and installation of two 40ft x 8ft steel FLEXTAINER conex offices for forensic personnel in St. Thomas, US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and the integration of essential utilities and security features. Each office will be equipped with two split-system A/C units, a steel door with a Cypher lock, four security windows, vinyl flooring, and a 5-pound ABC fire extinguisher. Electrical connectivity will be established via 2-inch diameter PVC or uPVC conduit to the nearest circuit. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 364 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order set aside for 8(a) Multiple Award Construction Contract (MACC) holders. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Compliance requirements include the Buy American Act, Davis-Bacon prevailing wage rates under determination VI20260001, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and potential PIV card issuance for personnel. Contractors are required to conduct a site survey prior to proposal submission and must submit payment requests electronically via the Invoice Processing Platform accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 5 days
NAICS: 238210
New
CBP: Replacement Fiber Line
Solicitation # CBP: Replacement Fiber Line
The Earle C. Clements Job Corps Center, operated by Management and Training Corporation (MTC) for the U.S. Department of Labor, is soliciting bids for a fixed-price, single lump sum contract to replace existing multi-mode fiber optic cabling with 12 strand single mode fiber optic cabling. The project involves removing retired aerial fiber lines and splice boxes and installing new 12 strand single mode aerial fiber, specifically Belden FS3L0024NS OS2 OSP Fiber or an equivalent, to establish network connectivity between the building 2436 network closet (MDF) and the building 2443 Maintenance office (IDF) using center-owned utility poles. The contractor is responsible for providing all labor, equipment, and materials, including fiber supports, rack-mounted enclosures, adapter panels, and lift rentals. The work will be performed in Morganfield, Kentucky, and is subject to Davis-Bacon Act prevailing wage rates as specified in General Decision Number KY20250041. Bids are due by October 5, 2026, and will be evaluated based on overall best value. To be considered, bidders must conduct a physical site visit, submit a signed bid form and a detailed cost breakout on company letterhead, and provide proof of insurance. A bid bond is required for offers of $25,000 or more; similarly, performance and payment bonds from a surety with at least an A- rating are required if the base bid reaches or exceeds $25,000. The solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. Applicants must provide a 12-digit Unique Entity ID (UEI) and a 9-digit Tax ID via the MTC Supplier Self-Certification form. Compliance with FAR clauses regarding the Buy American Act, combating trafficking in persons, and strict government data security and confidentiality protocols is mandatory.
Earle C. Clements Job Corps Center

POSTED

about 11 hours ago

DEADLINE

in 11 days
NAICS: 238210
New
Los Angeles Job Corps Egress Lighting
Solicitation # Emergency Egress Lighting
Management & Training Corporation (MTC) is seeking a small business electrical contractor under NAICS code 238210 to provide and install emergency egress lighting at a warehouse facility located at 424-426 Towne Avenue, Los Angeles, California. The scope of work includes the installation of four emergency egress lights: two near the primary front exit doors, one on the storage area wall, and one on the mezzanine level. The contractor is responsible for all labor, materials, equipment, and electrical work, including wiring, circuit integration, battery backup testing, and site cleanup, ensuring all work complies with applicable life safety, fire, and electrical codes. This is a subcontracting opportunity with a response deadline of September 25, 2026, at 3:00 PM PT. Bidders must submit a lump sum fee bid sheet, proof of insurance, three references, and a completed supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions. Award will be based on best value as determined by MTC. The contract requires compliance with Service Contract Labor Standards under Wage Determination SCLS 2015-5613 Rev 31 and adheres to FAR regulations regarding small business utilization, minimum wages, and the protection of sensitive government information. Invoicing should be submitted weekly or bi-weekly, and the facility is exempt from sales tax under the Workforce Investment Act.
MTC Los Angeles Job Corps

POSTED

about 11 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The City of Norco is seeking proposals from qualified California-licensed C-10 Electrical Contractors to perform modifications to the existing main metered electrical service and integrate it with the current generator system at City Hall, especially addressing critical loads for the Police Department. The project involves reconfiguring electrical distribution to separate emergency and non-emergency circuits, ensuring code compliance, safety, and minimal disruption to public safety operations by performing all work on weekends with support from a temporary generator. The contractor will handle disconnecting and replacing bussing, installing new circuit breakers and conductors, updating arc-flash hazard labeling, and relocating circuits. Responsibilities also include obtaining permits, scheduling inspections, coordinating with Southern California Edison and other local agencies, conducting required testing, commissioning, and providing complete documentation, training, and closeout. All work must comply with California Electrical Code, NFPA 70, NFPA 110, IEEE standards, Cal/OSHA, and Southern California Edison requirements, with the contractor managing all regulatory compliance and permitting tasks. The project must be completed within 45 working days, with liquidated damages of $1,000 per day for delays. The contractor must hold a valid CSLB C-10 license and possess city business licenses, maintain a clean and accessible worksite, and ensure site safety. A 10% bid bond is required, and material readiness must be certified before mobilization. The approved project plans require the contractor to obtain building permits and schedule timely inspections with the City of Norco Building Department.

General Info

California-licensed C-10 contractor to upgrade City Hall electrical service integrating emergency circuits, ensuring compliance.

Agency

California → Facilities and Maintenance Department of City of NorcoView Agency

Contract Value

$7,500

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

2870 Clark Avenue, Norco, CA 92860, CA, USA

Set-Aside

NONE

Awardee

Baker Electric & Renewables LLCView Profile

Award Issued Date

Documents

(4)

2025-00000829_2870 CLARK AVE_PLANS.pdf

HTML

Business Cards from Pre-Bid Meeting.pdf

HTML

RFP City Hall Main Metered Service Modifications.pdf

HTML

Sign In Sheet from Pre Bid Meeting.pdf

HTML

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Contract opportunity posted

Deadline changed

Response deadline time changed from 5:00 PM UTC to 6:00 PM UTC on Feb 9, 2026.

Notice updated

Response deadline changed from Feb 9, 2026 to Mar 30, 2026. The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Facilities and Maintenance Department of City of Norco
Contacts1 person available
OfficeCA, USA
Organization / Agency
California → Facilities and Maintenance Department of City of Norco
View Agency Profile
Office AddressCA, USA
Contacts

Full Description

Show more
Scope: The City of Norco (“City”) invites sealed proposals from qualified California-licensed C‑10 Electrical Contractors to furnish construction services for modifications to the existing main metered electrical service and integration with the existing generator system at the City Hall building, including critical Police Department loads. The Work shall be planned and executed to ensure safety, code compliance, selective coordination, minimal disruption to public safety operations, and complete, compliant closeout in accordance with the project plans.
Project Address: 2870 Clark Avenue, Norco, CA 92860
The project aims to deliver a reliable, code-compliant service entrance configuration and integrate emergency power to ensure operational continuity for City Hall and the Police Department. The work includes reconfiguring electrical distribution to clearly separate emergency and non-emergency loads, achieving selective coordination, and updating arc-flash hazard labeling. To minimize disruption, all work will be performed on weekends only, supported by a temporary generator rated at 40 kW or larger to maintain power for critical systems. The contractor will be responsible for administering all permits, scheduling inspections, and coordinating with Southern California Edison (SCE), the City of Norco, and the Corona-Norco Unified School District as needed. Comprehensive testing, training, and documentation—including accurate as-built drawings and full closeout submittals—are required.
The scope of work includes disconnecting existing conductors to the automatic transfer switch (ATS), installing new copper bussing, removing and replacing bussing between sections of the main service, and providing new circuit breakers and conductors to reconfigure Sections One and Two. Emergency and non-emergency circuits will be relocated accordingly, and labeling will be updated to clearly identify “Generator Power Only.” Approximately three Z-bars will be replaced as part of bussing modifications. The contractor must procure all materials prior to starting work and maintain the electrical room in a clean, accessible condition throughout the project. A detailed weekend phasing plan must be implemented to manage outages and ensure Police Department continuity.
All work shall comply with the California Electrical Code (NFPA 70), NFPA 110, IEEE standards, Cal/OSHA requirements, Southern California Edison service standards, and City of Norco permitting processes. The contractor is responsible for all permits, fees, inspections, utility approvals, and compliance with applicable regulations. Special conditions include maintaining critical operations, limiting work to weekends, completing the project within 45 working days, adhering to security protocols, prevailing wage requirements, and DIR registration. The contractor must certify material readiness before mobilization and ensure site safety, including electrical room cleanliness and accessibility.
There are 45 working days allowed to complete the construction portion of this project. Liquidated damages shall be assessed at $1,000.00 per working day.
The project plans have been approved by the City of Norco Building Department, the contractor is responsible for obtaining a building permit with the City for the construction of the project and scheduling inspections with the building inspector in a timely manner.
Notes: The successful bidder shall be licensed according with the provisions of the Business and Professional Code and shall possess a Class C10 – Electrical Contractors issued by Contractors State License Board (CSLB) license at the time this contract is awarded. The successful Contractor and his/her subcontractors will be required to possess business licenses from the City of Norco.
Bid Bond: 10.00%

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS