Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Proposals (RFP) for Professional Engineering Services 2022 - 2023 Storm Damage Repair Projects

Closed
2021-RFP-065State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238110
New
Federal
Z--Crow Agency Admin Building Concrete Pad
Solicitation # 140A1627Q0111
The Crow Agency Admin Building Concrete Pad project, solicitation 140A1627Q0111, is a firm fixed price construction effort managed by the Bureau of Indian Affairs under the Department of the Interior. This competitive acquisition is a set-aside for Indian Small Business Economic Enterprises (ISBEE) under NAICS code 238110, with a project magnitude of less than 35,000 dollars. The scope of work involves a concrete pad upgrade at the Crow Agency Admin Building, with all work performed according to specified attachments. The period of performance is mandatory and spans ninety calendar days following the issuance of a Notice to Proceed, which is contingent upon the acceptance of required bonding and insurance. Award will be based on the lowest total evaluated price, with the government assessing the lowest priced quote for fairness and reasonableness. Offerors must submit sealed proposals by December 15, 2026, including pricing and the Indian Affairs Indian Economic Enterprise Representation Form. The contract incorporates various FAR clauses regarding construction schedules, inspection, and safety standards, including the Buy American requirement for construction materials. Invoicing must be processed electronically via the Invoice Processing Platform (IPP) and requires approval and acceptance by the Government COR before payment is issued.
Bureau Of Indian Affairs

POSTED

about 3 hours ago

DEADLINE

in 28 days

AI Contract Overview

Show more

The County is seeking a qualified consulting firm to provide comprehensive engineering design, geotechnical analysis, and environmental permitting services for five storm damage sites identified along Bear Creek Road, Eureka Canyon Road, Mountain View Road, Redwood Lodge Road, and other locations in Santa Cruz County. These sites experienced significant damage due to heavy rains from December 2022 through March 2023, resulting in roadway instability, embankment failures, slipouts, and washouts. The proposed repairs involve constructing various stabilization structures such as soldier pile walls, MSE walls, rock slope protection, retaining structures, and drainage improvements to restore stability and prevent future damage. Each site requires specialized services including design, geotechnical investigations, and obtaining permits from agencies like the Water Board, Fish and Wildlife, Army Corps of Engineers, and compliance with riparian regulations. The contract, titled "Request for Proposals for Professional Engineering Services 2022 - 2023 Storm Damage Repair Projects," is managed by Santa Cruz Public Works and has a project size estimated between $500,000 and $1,500,000. The solicitation was posted in June 2025, with a response deadline of July 31, 2025. Interested firms can find additional details and submit proposals through the designated procurement portal. The project aims to address the storm-related damages efficiently by implementing structural and drainage solutions that restore roadway safety and stability across multiple sites affected by severe weather events.

Documents

5
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first7 pages · sow
High
PDF, High priority: read this firstrfp
High

Read all 5 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 43 days
  • 26_1123 – Hanska-MNOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Cruz Public Works / Roads
Contacts1 person available
OfficeN/A

Full Description

Show more
The County is seeking a qualified Consulting firm to provide engineering design, geotechnical, and environmental permitting services for a total of five (5) December 2022 through March 2023 storm damage sites that were identified along Bear Creek Road, Eureka Canyon Road, Mountain View Road, and Redwood Lodge Road. Descriptions of the damage in addition to the anticipated repairs for the sites are described below. Hazell Dell Road at PM 2.35 (2022 December) - Heavy rain caused water to run over the roadway and down the embankment. The saturated soils and could not handle the volume of runoff causing a portion of the road embankment to lose stability and fall into the creek. The slipout has been faced with shotcrete to stabilize the remaining travel lane and the proposed project is to construct an MSE wall to restore the roadway embankment. Services needed: Design, Geotech, Permits (Water Board, F&W, Army Corps., Riparian Exception-County Planning) Bear Creek Road at PM 7.41 (2023 March) - Heavy rain caused water to run over the roadway and down the embankment. The saturated soils could not handle the volume of runoff causing the embankment to lose stability and fall down the hillside. The proposed project is to construct a soldier pile wall. Services needed: Design, Geotech, Permits (Water Board, F&W, Army Corps., Riparian Exception-County Planning) Eureka Canyon Road at PM 5.17 (2023 March) - Heavy rain caused water to flow in high volume over the roadway and down the embankment, resulting in a slipout on the West Bound shoulder. The proposed project is to construct rock slope protection and drainage improvements. Services needed: Design, Geotech, Permits (Water Board, F&W, Army Corps., Riparian Exception-County Planning) Hazell Dell Road PM 2.57 (2023 March) - Heavy rain caused water to run over the roadway and down the embankment. The saturated soils could not handle the volume of runoff causing the road embankment to lose stability and fail. The proposed project is to construct rock slope protection or a retaining structure and drainage improvements. Services needed: Design, Geotech, Permits (Water Board, F&W, Army Corps., Riparian Exception-County Planning)Ice Cream Garde PM 1.24 (March 2023) - Heavy rain caused water to run over the roadway, over a log retaining wall, and down the embankment. The saturated soils could not handle the volume of runoff causing the road and retaining wall to lose stability and fail. The proposed project is to construct rock slope protection and drainage improvements. Services needed: Design, Geotech, Permits (Water Board, F&W, Army Corps., Riparian Exception-County Planning) Jamison Creek Road PM 1.09 (March 2023) - Heavy rain caused water to run over the roadway and down the embankment creating a 40 foot long slipout. The saturated soils and failed culvert could not handle the volume of runoff causing the road to lose stability and slump. The proposed project is to construct a soldier pile wall. Services needed: Design, Geotech, Permits (Water Board, F&W, Army Corps., Riparian Exception-County Planning) Spreckels Drive south of Soquel Drive (March 2023) – Heavy rain caused water to run over the roadway and down the embankment. The saturated soils could not handle the volume of runoff causing the road side to lose stability and fail. The proposed project is to construct a soldier pile wall. Services needed: Design, Geotech, Permits (Water Board, F&W, Army Corps., Riparian Exception-County Planning) Upper East Zayante Road PM 1.18 (March 2023) - heavy rains caused water to run over the roadway and down the embankment. The saturated soils and could not handle the volume of runoff causing the road to lose stability and fall into the creek. The proposed project is to construct a soldier pile wall. Services needed: Design, Geotech, Permits (Water Board, F&W, Army Corps., Riparian Exception-County Planning) 

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS