This Solicitation opportunity from Georgia was posted on April 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Request for Qualifications (RFQ): 2025-038: Design Services for North Fork Peachtree Creek Trail fro
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
DeKalb County, Georgia, is seeking qualified design consultants through a formal RFQ process to develop a trail along North Fork Peachtree Creek, stretching from Fisher Trail Park to Chamblee Tucker Road. The project involves creating a comprehensive scoping study and a limited-scope concept report, with all preliminary engineering design services to follow the Georgia Department of Transportation’s Plan Development Process. The selected firm will need to consider environmental, right-of-way, and constructability constraints, aiming to keep the trail close to the creek where feasible, while also accommodating necessary modifications for at-grade roadway crossings, such as traffic signal adjustments or new crossings. Responses must be submitted via the County’s eProcurement Portal by 3:00 pm on May 20, 2025, with late submissions not accepted. The project budget ranges from $500,000 to $1,500,000, and the contract will be managed by DeKalb County Government. Interested firms can contact Jennifer Schofield for further information. The project emphasizes environmentally sensitive planning, coordination with existing infrastructure, and adherence to established design processes to ensure a functional and sustainable trail development along this creek corridor.
General Info
Place of Performance
GA, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Project work includes the preparation of a scoping study for this trail segment that will include the development of a limited-scope concept report. The consultant will provide all preliminary engineering design services based on the Georgia Department of Transportation¿s Plan Development Process (PDP) for concept reports.
The project limits are from Fisher Trail Park to Chamblee Tucker Road along North Fork Peachtree Creek. It is desirable to have as much of the trail as possible follow near the creek, but right-of-way, environmental and constructability constraints may require some of the proposed trail to be away from the creek. Any at-grade crossings of existing roadways may require modification of existing traffic signals or establishment of new mid-block crossings.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
