Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Request For Quotes Sanitary Sewer Repair at 805 S. Lake Street

Active
2026-GEN-059State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

IN, USA

Set-Aside

NONE

Documents

1

REQUEST_FOR_QUOTES_805_S_LAKE_STREET.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIndiana → Engineering
Contacts1 person available
OfficeGary, IN, 46406, USA
Organization / AgencyIndiana → Engineering
Office AddressGary, IN, 46406, USA
Contacts
Jabez AndersonAssistant Manager of Engineering

Interested Companies (8)

ConstructConnectCincinnati, OH
LGS PlumbingCrown Point, IN
METZ Sewer Plumbing & PumpingGary, IN

See All 8 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Remove and replace existing 36-inch diameter pipe with 36-inch diameter PVC SDR 35 ± 46-linear feet from Manhole No. 567 going towards Manhole No. 568. Remove and replace existing 36-inch diameter pipe with 36-inch diameter PVC SDR 35 ± 57-linear feet starting 31 feet from Manhole No. 568 going towards Manhole No. 567. Remove and replace existing 36-inch diameter pipe with 36-inch diameter PVC SDR 35 ± 32-linear feet starting 93 feet from Manhole No. 568 going towards Manhole No. 570. Remove and replace existing 36-inch diameter pipe with 36-inch diameter PVC SDR 35 ± 33-linear feet starting 166 feet from Manhole No. 568 going towards Manhole No. 570. Contractor shall ensure pipe penetrations are sealed and watertight. Contractor shall connect new pipe to existing good pipe with a watertight connection. Connect new pipe to existing PVC pipe with neoprene rubber coupling with stainless steel straps or coupling provided by the manufacturer and approved by the owner. When adjoining new pipe to existing, the maximum space between the abutting pipes shall be 1/8 inches or less. Any further space between pipes shall not be acceptable. Submit pictures or request an inspection of rubber coupling and manhole connections before and after installation to the Gary Sanitary District for verification.

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS