This Solicitation opportunity from Massachusetts was posted on November 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this first3 pages · certification-statement
HighAI Summary for Attachment B Certification Statement for MSBA RFR Compliance: This document is Attachment B, a Certification Statement related to a Request for Response (RFR) for the Massachusetts School Building Authority (MSBA). It includes multiple certifications such as compliance with Massachusetts Child Care Law, tax filing status, business operations in Northern Ireland, and disclosure of business relationships. The statement also covers certifications of no conflicting relationships, criminal actions, good standing and licensure, solvency, minimum qualifications, compliance with RFR requirements, and confidentiality agreements. The document requires authorized signature and date, affirming the firm's adherence to these conditions under penalty of perjury.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Attachment F - Feasibility Study Educational Program Requirements: This document, titled Attachment F, outlines the educational program requirements for the Feasibility Study phase of a school district project. It details the process and content for the Preliminary Design Program (PDP) and Preferred Schematic Report (PSR) submittals to the Massachusetts School Building Authority (MSBA). The document specifies the need to document the current educational program, proposed educational specifications, and design responses to meet educational objectives. Key content includes grade and school configuration policies, class size policies, school scheduling methods, teaching methodologies, curriculum delivery methods, and academic support programming spaces. The document emphasizes collaboration among stakeholders and requires detailed narratives, figures, and charts to describe the educational program's elements, goals, and proposed changes. It serves as a statement of work guiding the development of educational program documentation during the feasibility study.
PDF
PDF, High priority: read this firstfeasibility-study
HighAI Summary for Attachment G - Module 3 Feasibility Study July 2024: This document, titled 'Module 3 Feasibility Study' dated July 2024, serves as a comprehensive guide for school districts collaborating with the Massachusetts School Building Authority (MSBA) during the Feasibility Study phase of a school building project. It outlines the procedures, participant roles, submittal requirements, and approval processes necessary to develop and recommend a cost-effective and educationally appropriate solution for school facilities. The document includes detailed sections on the Preliminary Design Program, Preferred Schematic Report, and the steps required for MSBA Board approval to proceed into schematic design. It emphasizes the importance of collaboration with the MSBA and adherence to their regulations to qualify for grant funding. Appendices provide additional resources such as program overviews, project schedules, certification templates, and budget statements.
PDF
PDF, High priority: read this firstjob-aid
HighAI Summary for COMMBUYS Job Aid for Creating a Quote in Response to Bid Solicitations: This Job Aid provides step-by-step instructions for sellers on how to create a quote in response to bid solicitations posted in the COMMBUYS system. It covers accessing bids via advanced search and the Bids tab, acknowledging receipt of bid solicitations, and reviewing key bid information such as bid number, description, opening date, purchaser details, and attached documents. The document includes screenshots and detailed directions to guide users through the process, emphasizing the importance of the Items Tab and acknowledging bid receipt to receive future updates. The example bid referenced is BD-20-1080-OSD03-OSD03-50290 for Advertising, Marketing and Event Planning Services with a bid opening date of July 23, 2020.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Massachusetts School Building Authority Master Services Agreement: This Master Services Agreement (MSA) is between the Massachusetts School Building Authority (MSBA) and a Contractor, establishing terms for professional services to be provided. It defines key terms, scope of services, payment, and termination conditions. The MSA allows MSBA to issue Work Orders detailing specific services, deliverables, and payment terms. The Contractor must perform services professionally and timely, with MSBA retaining rights to terminate the agreement or any Work Order. The document includes provisions on deliverables, invoicing, and compliance with professional standards. This version is undated but outlines foundational contractual obligations and procedures for service engagement and termination.
PDF
PDF, High priority: read this first18 pages · sources-sought
HighAI Summary for MSBA FY26 Educational Program Reviewer Request for Responses: This document is a Request for Responses (RFR) issued by the Massachusetts School Building Authority (MSBA) seeking educational planners, curriculum developers, firms, or individuals to provide professional Educational Program Review services. The contract term is initially two years starting June 1, 2026, with possible renewals. The services involve reviewing and evaluating educational program submittals from school districts during the Feasibility Study phase for public K-12 school projects. The scope includes assessing program clarity, alignment with MSBA guidelines, and support for educational goals. Minority and diverse business enterprises are encouraged to respond. The MSBA may award contracts to one or more qualified respondents based on qualifications, experience, and value.
PDF
PDF, High priority: read this first13 pages · contract-document
HighAI Summary for MSBA Master Services Agreement: This Master Services Agreement (MSA) is between the Massachusetts School Building Authority (MSBA) and a Contractor, establishing terms for professional services to be provided. It defines key terms, scope of services via Work Orders, payment terms, and conditions for termination and survival. The MSA emphasizes the Contractor's obligation to perform services professionally and timely, with MSBA retaining rights to terminate without cause. The document serves as a foundational contract for ongoing service engagements, dated as of the Effective Date to be specified, and includes provisions for amendments and incorporation of Work Orders.
PDF
PDF, High priority: read this firstrfr
HighAI Summary for MSBA Request for Responses for Educational Program Review Services MSBA-RFR-EPR-2026: This document is a Request for Responses (RFR) issued by the Massachusetts School Building Authority (MSBA) under file number MSBA-RFR-EPR-2026, dated for services starting June 1, 2026. It seeks qualified educational planners, curriculum developers, firms, or individuals to provide professional Educational Program Review services. The purpose is to assist MSBA in reviewing and evaluating educational program submittals from school districts during the Feasibility Study phase for public K-12 school projects. The contract term is initially two years with possible renewals up to four years. The scope includes detailed review and evaluation of educational programs, assessment of alignment with MSBA guidelines, and recommendations for modifications. Minority and diverse business enterprises are encouraged to respond. The document outlines the background, objectives, and detailed scope of services expected from respondents.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for MSBA-RFR-EPR-2026 Addendum No. 1 Questions and Answers: This document is Addendum No. 1 dated November 25, 2025, for the Massachusetts School Building Authority Request for Responses (RFR) for Educational Program Review Services MSBA-RFR-EPR-2026. It provides clarifications in a Q&A format regarding the RFR, including corrections to attachment links, explanations of special studies, conflict of interest limitations, meeting participation expectations, and details on the timing and volume of educational program reviews expected under the contract. The addendum aims to assist respondents in understanding the scope and requirements of the solicitation.
PDF
PDF, Low priority1 page · other
LowAI Summary for Attachment A Authorized Respondent Signature and Acceptance Form: This document is Attachment A, the Authorized Respondent Signature and Acceptance Form for a Request for Response (RFR) issued by the Massachusetts School Building Authority. It certifies that the respondent has read and understands the RFR requirements, agrees to comply with all terms and conditions, and acknowledges that the response will be incorporated into any resulting agreement. The form requires the printed name and signature of the authorized representative of the respondent.
PDF
PDF, Low priority1 page · other
LowAI Summary for Attachment A - Authorized Respondent's Signature and Acceptance Form: Attachment A is an Authorized Respondent's Signature and Acceptance Form for a Request for Response (RFR) issued by the Massachusetts School Building Authority. It certifies that the respondent has read and understands the RFR requirements, agrees to comply with all terms and conditions, and acknowledges that the response will be incorporated into any resulting agreement. The form requires the printed name of the respondent and the signature of an authorized representative to certify the truthfulness and correctness of the response.
PDF
PDF, Low prioritycertification-statement
LowAI Summary for Attachment B - Certification Statement for MSBA RFR: Attachment B is a Certification Statement related to a Request for Response (RFR) issued by the Massachusetts School Building Authority (MSBA). It includes multiple certifications such as compliance with Massachusetts Child Care Law, Revenue Enforcement and Protection Program, and business conduct in Northern Ireland. The document requires the respondent to disclose organizational structure, relationships, and any compensations related to the MSBA engagement. It also includes certifications of no conflicting relationships, criminal actions, good standing and licensure, solvency, minimum qualifications, compliance with RFR requirements, and confidentiality. The document is signed by an authorized representative of the firm.
PDF
PDF, Low priorityreport
LowAI Summary for Attachment D Supplier Diversity Program Prime Contractor Spending Report: This document is the Supplier Diversity Program (SDP) Prime Contractor Spending Report form, updated on 06/28/2021. It requires contractors to report quarterly spending with certified SDP partners, including contractor information, SDP partner details, and certification types. The form includes instructions for completion, definitions of relationship types, and links to certification resources. It is used to ensure compliance with annual supplier diversity spending commitments and must be submitted within 45 days after each quarter.
PDF
PDF, Low priority1 page · supporting-document
LowAI Summary for Attachment E - Invest in Massachusetts Data Form: A mandatory data collection form for respondents to certify whether 50% or more of the work-hours for a potential contract will be performed within the Commonwealth of Massachusetts, including job creation/preservation details and a signed certification.
PDF
PDF, Low priority1 page · other
LowAI Summary for Attachment E Invest in Massachusetts Data Form: This document is Attachment E, the Invest in Massachusetts Data Form, which is a mandatory form for respondents to complete as part of a contract proposal process. It collects respondent information, including business name, address, and contact details. The form requires respondents to certify that at least 50% of the work hours performed under the contract will be done in Massachusetts, including job creation or preservation details. The certification must be signed by an authorized individual and is a binding commitment for any contract awarded by the Massachusetts School Building Authority (MSBA).
PDF
PDF, Low priority8 pages · other
LowAI Summary for Job Aid for Creating a Quote in COMMBUYS: This Job Aid from July 2020 provides step-by-step instructions for vendors on how to create a quote in response to bid solicitations posted in COMMBUYS. It covers accessing bid searches, acknowledging receipt, reviewing bid solicitation details, creating and submitting a quote, and completing the Items tab with pricing and attachments. The document emphasizes the importance of following bid instructions and using the COMMBUYS system features correctly to ensure a valid quote submission.
PDF
PDF, Low priority30 pages · other
LowAI Summary for MSBA Module 3 Feasibility Study Guidelines July 2024: This document is the Massachusetts School Building Authority (MSBA) Module 3 – Feasibility Study Guidelines dated July 2024. It provides a general guide for school districts and their teams to plan and collaborate with the MSBA during the Feasibility Study phase of school building projects. The document outlines the purpose of the Feasibility Study, participant roles including the School Building Committee, Owner's Project Manager, Designer, and MSBA representatives, and the submittal procedures for required documentation. It includes a detailed table of contents covering the Preliminary Design Program, Preferred Schematic Report, MSBA review processes, and approval steps to proceed into schematic design. The guidelines emphasize the need for MSBA collaboration and approval at each step to qualify for grant funding and clarify that the Feasibility Study is not project approval but a step to recommend the most cost-effective and educationally appropriate solution to the MSBA Board of Directors.
PDF
PDF, Low priority8 pages · other
LowAI Summary for MSBA Module 9 Post Occupancy Evaluation July 2021: This document is the Massachusetts School Building Authority (MSBA) Module 9 Post Occupancy Evaluation Version 1.0, published in July 2021. It outlines the purpose and methodology of the Post Occupancy Evaluation (POE) process for MSBA-funded school building projects, aiming to assess building performance and occupant satisfaction approximately three years after substantial completion. The document details the evaluation criteria, timing, participants involved, and documentation requirements, including data collection from Modules 1-8, online surveys, pre-visit questionnaires, and site visits. The POE process collects both qualitative and quantitative data to inform future school building projects and maintenance practices.
PDF
PDF, Low priority2 pages · report
LowAI Summary for Supplier Diversity Program Prime Contractor Spending Report: This document is the Supplier Diversity Program (SDP) Prime Contractor Spending Report form, updated on 06/28/2021. It requires contractors to report quarterly spending with certified Supplier Diversity Program partners, including subcontracting and ancillary products/services. The form includes sections for contractor information, SDP partner details, and certification types. Contractors must submit this report within 45 days after each quarter to the Commonwealth Contract Manager. The report supports compliance with annual supplier diversity spending commitments and includes instructions for completion and resources for further information.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.