Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 25, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

+RESTORATION OF LOWER MAD RIVER TRAIL #1409-PHASE 2

Awarded
AG-05GG-S-10-0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 9 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Restoration of Lower Mad River Trail #1409-Phase 2 project involves the new construction of approximately 2165 feet and the restoration of 44,247 feet of existing trail within the Entiat Ranger District of the Okanogan and Wenatchee National Forests in Chelan County, Washington. The scope of work includes clearing and grubbing, excavation, rock retaining walls, shallow stream fords, turnpikes, wire gabion baskets, trail lift, puncheon bridges, and culverts. A critical operational constraint mandates that motorized equipment and trail building machines are strictly prohibited beyond MP 5.10, meaning all work from MP 5.10 to MP 8.82 must be performed by hand. This contract is 100 percent set aside for HUBZONE certified firms, with an estimated value between 100,000 and 250,000 dollars. The performance period is 393 calendar days, commencing as soon as practical after the contract award. Managed by the Department of Agriculture, the project is overseen by Contracting Specialist Lois Tate.

General Info

Contract Value

$102,589.75

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

WA, USA

Set-Aside

NONE

Award Issued Date

Documents

21

932-2 Puncheon with Decking Technical Drawing

PDF, High priority: read this firstspecifications
High

Amendment 1 - AG-05GG-S-10-0009 (Lower Mad River Trail #1409 Restoration)

PDF, High priority: read this firstamendment
High

Existing Trail Restoration - Detail 915-1

PDF, High priority: read this firstspecifications
High

Lower Mad River Trail #1409 Phase 2 - Drawings Title Sheet

PDF, High priority: read this firstspecifications
High

Lower Mad River Trail #1409 Restoration (AG-05GG-S-10-0009)

DOC, High priority: read this firstrfp
High

Project Map - Lower Mad River Trail #1409

PDF, High priority: read this firstspecifications
High

Rock Retaining Wall Specifications (935-1)

PDF, High priority: read this firstspecifications
High

Rolling Dip Standard Detail 912-5

PDF, High priority: read this firstspecifications
High

Shallow Stream Ford and Gully Crossing Rock Structure Specifications

PDF, High priority: read this firstspecifications
High

Turnpike Type II Technical Drawing

PDF, High priority: read this firstspecifications
High

USDA Forest Service - Tread Lift Details

PDF, High priority: read this firstspecifications
High

Wire Baskets (Gabions) Installation Detail

PDF, High priority: read this firstspecifications
High

912_1+Model (1).pdf

PDF, Low priorityother
Low

911_1+Model+%281%29.pdf

PDF

Amendment+No1+Schedule+of+Items.docx

DOCX

general_notes.rtf

RTF

Lower+Mad_+station+log+Phaze+2.xlsx

XLSX

sps_906.doc

DOC

SPS-Trail+Lift.docx

DOCX

vicinity_map_hand_work.pdf

PDF

WAGE+DECISION.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from May 27, 2010 to Jun 18, 2010. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Okanogan-Wenatchee National Forest
Contacts2 people available
OfficeWENATCHEE, WA, 98801, USA
Office AddressWENATCHEE, WA, 98801, USA
Contacts
Lois K TateContracting Specialist
Ellen R. KinamonProcurement Technician

Full Description

Show more
RESTORATION OF LOWER MAD RIVER TRAIL #1409-PHASE 2, Entiat Ranger District, Okanogan & Wenatchee National Forests, Chelan County, Washington. This project consists of new construction for approximately 2165 feet and trail restoration of existing trail for approximately 44,247 feet. Items of work will include: Clearing and grubbing, excavation, trail restoration, rock retaining walls, shallow stream fords, turnpikes, wire gabions baskets, trail lift, puncheon bridge and culverts. Motorized equipment and trail building machines are only allowed between MP 0.0 and 5.10.00. ALL WORK (excavation of new trail construction and trail restoration) FROM MP 5.10 TO MP 8.82 WILL BE DONE BY HAND ONLY. MOTORIZED TRAIL BUILDING MACHINES AND EQUIPMENT ARE NOT PERMITTED BEYOND MP 5.10. The Contract Time will commence as soon as practical after contract award. The contract time is 393 calendar days. This project is estimated to range between $100,000 and $250,000. The Solicitation will be posted to FBO on approximately April 26, 2010 and will only be available through FBO. This project is 100% Set Aside for HUBZONE certified firms. In the event no reasonable offers are received from HUBZone Certified firms, this solicitation will be converted to full and open competition. The Contracting Specialist for this project is Lois Tate, e-mail contact@example.gov.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS