Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on July 17, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Restoration of Wetlands Reserve Program (WRP) Site in Whiting VT

Awarded
AG-1644-S-09-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

2 days ago

DEADLINE

in 23 days

AI Contract Overview

Show more

This project involves the restoration of a Wetlands Reserve Program site in Whiting, Vermont, located in an abandoned pasture with muck, peat, and clay soils. The scope of work includes the installation of two earthen ditch plugs, two culvert plugs using flowable fill, and one steel vertical sheet pile ditch plug featuring a 28 inch weir notch and a sheet pile cap. Rock riprap must be placed on the downstream side of the sheet pile structure, and borrow material will be sourced from a designated area within 1000 feet of the site. The selected contractor must be added as a co-permittee to the existing Construction Stormwater Permit from the Vermont DEC and adhere to the Low Risk Site Handbook for Erosion Prevention and Sediment Control. Access to the site is provided via the Leicester Whiting Road and a farm access road. The estimated performance time for the completion of all installations and associated components is 21 days.

General Info

Agency

N/A

Contract Value

$0

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Saenger WRP Site, WHITING, VT, 05778, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Patricia M PickettContract Specialist
Bob ThompsonCivil Engineer

Full Description

Show more
This project shall consist of the installation of two earthen ditch plugs, two culvert plugs,one steel vertical sheet pile ditch plug and all associated components. The project is located in the town of Whiting Vermont, approximately 1 mile east of Whiting Village. Access to the site is off the Leicester Whiting Road along approximately 1 mile of farm access road. The construction site is located in an approximate 50 acre abandoned pasture. The soils are mapped as predominately Muck and Peat, with the planned borrow area being mapped as Covington Clay. This project will require a Construction Stormwater Permit from the Vermont DEC which has been obtained by NRCS. Selected contractor shall be added to the permit as a co-permittee, as required by these storm water regulations. Construction shall be done in accordance with - The Low Risk Site Handbook for Erosion Prevention and Sediment Control by VT DEC. The culvert plugs consist of installing temporary formwork or earthen berms so flowable fill can be placed to completely fill the culvert. The earthen ditch plugs consist of plugging existing drainage ditches that are 4 to 5 feet deep and about 18 feet wide. These drainage ditches are typically dry during the summer months. The borrow material shall be hauled from the designated borrow area, which is approximately 1000 feet from the farthest ditch plug. The one sheet pile ditch plug consists of installing approximately 48 lineal feet of steel sheet pile with a 28 weir notch. This plug is located in a larger existing drainage ditch that typically has standing water in it. A sheet pile cap is required. Rock riprap shall be placed on the downstream side of the structure. Performance time is estimated to be 21 days and anticipated to begin in mid-July. Complete solicitation package will be available on or about May 22, 2009. Estimated Price range: between $100,000 and $250,000.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS