Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Michigan was posted on January 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Resurfacing and Culvert Replacement on Otter Lake Tapiola Road, Houghton County

Closed
31000-221275State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238110
New
Federal
Z--Crow Agency Admin Building Concrete Pad
Solicitation # 140A1627Q0111
The Crow Agency Admin Building Concrete Pad project, solicitation 140A1627Q0111, is a firm fixed price construction effort managed by the Bureau of Indian Affairs under the Department of the Interior. This competitive acquisition is a set-aside for Indian Small Business Economic Enterprises (ISBEE) under NAICS code 238110, with a project magnitude of less than 35,000 dollars. The scope of work involves a concrete pad upgrade at the Crow Agency Admin Building, with all work performed according to specified attachments. The period of performance is mandatory and spans ninety calendar days following the issuance of a Notice to Proceed, which is contingent upon the acceptance of required bonding and insurance. Award will be based on the lowest total evaluated price, with the government assessing the lowest priced quote for fairness and reasonableness. Offerors must submit sealed proposals by December 15, 2026, including pricing and the Indian Affairs Indian Economic Enterprise Representation Form. The contract incorporates various FAR clauses regarding construction schedules, inspection, and safety standards, including the Buy American requirement for construction materials. Invoicing must be processed electronically via the Invoice Processing Platform (IPP) and requires approval and acceptance by the Government COR before payment is issued.
Bureau Of Indian Affairs

POSTED

about 5 hours ago

DEADLINE

in 28 days

AI Contract Overview

Show more

The project involves the resurfacing and culvert replacement along a 2.04-mile stretch of Otter Lake Tapiola Road north of Askel Road in Houghton County, Michigan. It includes hot mix asphalt base crushing, shaping, paving, culvert replacements, signing, and pavement markings. As a Local Agency project managed by the Michigan Department of Transportation, it requires prime contractors to meet specific prequalification standards, including a subclassification of Ea. If the prime contractor is not prequalified in this subclassification, a prequalified subcontractor must be designated prior to contract award. The project’s estimated value ranges between $500,000 and $1,500,000, with a solicitation posted on January 31, 2025, and a response deadline of March 7, 2025. The project aims to improve roadway conditions and safety, and interested bidders can find additional details through the provided online link.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 43 days
  • 26_1123 – Hanska-MNOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMichigan Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
2.04 mi of hot mix asphalt base crushing, shaping and resurfacing, culvert replacement, signing and pavement markings on Otter Lake Tapiola Road north of Askel Road, Houghton County. This is a Local Agency project. ** 1077 Cb **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder.

More opportunities from Michigan Department of Transportation

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS