Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Idaho was posted on July 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Reuse Compliance-15.0 Extension Pipeline

Closed
PWWWUPPH2FState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

38 minutes ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

38 minutes ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station featuring a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes from various trades, including SWPPP, survey, aggregates, demolition, paving, precast concrete, masonry, metals, coatings, process equipment, fire suppression, piping, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids are due by 2:00 PM on October 29, 2025. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

38 minutes ago

DEADLINE

in about 10 hours

AI Contract Overview

Show more

The project involves the construction of approximately 3,600 linear feet of solid wall PVC irrigation pipeline along the Moses Drain within an existing easement in Nampa, Idaho. The work includes installing an 18-inch diameter pipeline to collect drainage from the 15.0 North Lateral, which runs west along Homedale Road, and then increasing to a 24-inch diameter pipe after connecting with the South Lateral, which flows north along N Midway Road. The pipeline will also accommodate flow from an existing storm drain pipe and will connect to an existing Highline Canal concrete structure north of Laster Street. Bidders are invited to submit sealed bids at the Nampa Development Services Center by August 21, 2025, with project costs estimated between $500,000 and $1,000,000. The solicitation is managed by the City of Nampa, Idaho, under NAICS code 237110, and details are available on the city’s bidding portal.

General Info

Agency

Idaho → City of Nampa

Place of Performance

ID, USA

Set-Aside

NONE

Documents

1

Project 186294: Reuse Compliance - 15.0 Extension Pipeline

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIdaho → City of Nampa
ContactsNo contacts available
OfficeN/A
Organization / Agency
Idaho → City of Nampa
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Sealed bids for the construction of the Project will be received at the Nampa Development Services Center, 1st Floor large conference room, located at 500-12th Avenue South, Nampa ID.The work covered under this contract will be performed along the Moses Drain, within the existing Moses Drain easement.  The overall project will consist of furnishing and installing Solid Wall PVC irrigation pipeline of approximately 3,600 lineal feet.  The gravity irrigation pipe alignment will collect drainage from the existing 15.0 North Lateral traveling west along Homedale Road the flow northwest along the eastern band of Moses Drain.  This first section of irrigation pipe will be 18-inches in diameter and will collect flow from the the 15.0 South Lateral, which flows north along N Midway Road.  The irrigation pipe will increase to a 24-inch pipe after connecting with the South Lateral.  An existing storm drain pipe will require continue to flow northwest along the eastern bank of the Moses Drain.  The pipeline will connect to the existing Highline Canal concrete structure north of Laster Street.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS