This Solicitation opportunity from California was posted on July 16, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Rfb 3983 - Edgemoor Demolition. Prebid Conference/Site Walk Scheduled For 7/23/09 At 10 Am. See Attached For Additional Information. Additional Site Walk Scheduled For 8/4/09 At 9:00 Am.
Closed
3983State & Local
Submission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
HighAI Summary for 59351 Edgemoor Facility Demolition Bid Form Addendum 3: This document is the bid form for the Edgemoor Facility Demolition Project located at 9065 Edgemoor Drive, Santee, California. It includes the base bid and two alternate bids: crushing and stockpiling demolished asphalt and concrete on site, and removal and disposal of hard pipe insulation. The form outlines the bidder's declaration to provide all labor, materials, and services as specified. The low bidder will be determined based on the total of the base bid and both alternates, with the County reserving the right to award the contract for the base bid alone or with any combination of alternates. The document is dated 06/08/09 and is part of Addendum 3.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 for Demolition of Edgemoor Hospital Bid No. 3983: This document is Addendum No. 1 dated July 16, 2009, for the Demolition of Edgemoor Hospital Project No. MF9775, Bid No. 3983. It serves as a formal amendment to the original solicitation, correcting the bid number to 3983 and providing contact information for questions related to the project. The addendum clarifies that all inquiries should be directed to Sarah E. Castaneda, Assistant Procurement Contracting Officer at the County of San Diego Department of Purchasing and Contracting.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 2 for Demolition of Edgemoor Hospital Project No. MF9775 Bid No. 3983: This document is Addendum No. 2 to the solicitation for the Demolition of Edgemoor Hospital Project No. MF9775, Bid No. 3983, dated 2009. It revises the original solicitation by changing the bid date to August 21, 2009, and adds a site walk on August 4, 2009. It includes revisions to plan sheets, demolition notes, and utility notes, specifying contractor responsibilities for capping utilities, removing power poles, and maintaining services to certain buildings. Additional instructions cover disposal of fluorescent bulbs and PCB ballasts, as well as pipe removal in Building #15. Revised Sheet 7 and as-built plans are attached for bidder use. Contact information for the Assistant Procurement Contracting Officer is provided for questions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 3 for Demolition of Edgemoor Hospital Project No. MF9775 Bid No. 3983: This document is Addendum No. 3 to the solicitation for the Demolition of Edgemoor Hospital Project No. MF9775, Bid No. 3983. It updates the original solicitation by including an attachment summarizing estimated quantities of asbestos-containing materials (ACM), revising the bid form to include ACM in the base bid except for a specific alternate bid, and modifying insurance requirements. Additional changes include removal and disposal of fire hydrants, use of recycled water for construction activities with a specified meter installation, and coordination requirements with Padre Dam Municipal Water District for water and sewer laterals. The addendum is issued by the Department of Purchasing and Contracting and provides contact information for questions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 4 for Demolition of Edgemoor Hospital Project No. MF9775 Bid No. 3983: This document is Addendum No. 4 to the solicitation for the Demolition of Edgemoor Hospital Project No. MF9775, Bid No. 3983. It modifies the original solicitation by revising Sheet 7 to include changes related to electrical work, conduit, service panel, wiring, pedestal, permits, cutting, trenching, backfill, patching, and traffic control. The changes are clouded on the plan and noted as 'Addendum #4'. It also references associated SDG&E sketches and specifications, clarifying that the contractor is responsible for all work except that performed by SDG&E. The addendum is issued by the Department of Purchasing and Contracting and includes contact information for questions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 5 for Demolition of Edgemoor Hospital Project No. MF9775 Bid No. 3983: This document is Addendum No. 5 to the solicitation for the Demolition of Edgemoor Hospital Project No. MF9775, Bid No. 3983. It modifies the original solicitation by clarifying the Basis of Award. The previous Basis of Award listed on page 00202-2 of the Instructions to Bidders is removed. The Basis of Award now follows the Revised Bid Form, determining the low bidder based on the total base bid plus alternate bids #1 and #2. The addendum is issued by the Department of Purchasing and Contracting and includes contact information for questions.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Article 11 Insurance and Bonds Requirements: This document, titled Article 11 Insurance and Bonds, outlines the insurance requirements for contractors under a contract with the County of San Diego. It specifies the minimum scope and limits of insurance coverage including Commercial General Liability, Automobile Liability, Workers' Compensation, Employer's Liability, and Contractors Pollution Legal Liability. The document details coverage amounts, required endorsements such as additional insured and primary insurance endorsements, notice of cancellation, and loss payee clauses. It also sets standards for qualifying insurers and evidence of insurance submission. The document is critical for ensuring contractors maintain adequate insurance throughout the contract period and comply with County risk management policies.
PDF
PDF, High priority: read this firstnotice-to-contractors
HighAI Summary for Bid Notice for Demolition of Edgemoor Hospital, Bid No. 3983: This document is a Notice to Contractors from the County of San Diego for sealed bids due by 2pm on August 7, 2009, for the demolition of Edgemoor Hospital, Project No. MF9775, Bid No. 3983. The work includes demolition and removal of all site buildings except the polo barn and garage, hazardous material abatement, and site restoration. A pre-bid conference is scheduled for July 23, 2009. The estimated construction cost is $2.9 to $3.1 million. Contractors must have a California Contractor's license (Classification A or B). Bid security of 10% and payment/performance bonds of 100% are required. A 3% Disabled Veterans Business Enterprise goal is encouraged. Contract documents are available for purchase, and addenda will be posted online. Contact Sarah E. Castaneda for inquiries.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Edgemoor Nursing Facility Electric Service Specifications Addendum 4: This document dated August 3, 2009, provides detailed specifications and conditions for electric service installation at the Edgemoor Nursing Facility project (Project No. 954652-030,040, Work Order #2926000). It includes technical information on overhead and underground electric service, construction responsibilities, cost details, storm water permitting, site access requirements, trenching advisories, and inspection procedures. The document outlines compliance with safety regulations and provides contact information for project management and inspections. It serves as an addendum to the project specifications, ensuring proper coordination and adherence to utility and regulatory standards for the electric service installation.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 3983 Demolition of Edgemoor Hospital: This document is a Request for Bid (RFB) numbered 3983 for the Demolition of Edgemoor Hospital. The bid opening date is August 7, 2009, with an estimated cost range of $2.9 million to $3.1 million. The document includes a list of companies that purchased the contract documents, along with their contact information. The project manager is Richard Dinnean, reachable at [phone hidden]. The price for contract documents is $5.00, with no full-size plans or soils report available. This RFB serves as the primary solicitation for contractors interested in bidding on the demolition project.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for RFB 3983 Edgemoor Facility Demolition Q&A: This document dated August 14, 2009, is a Q&A for RFB #3983 Edgemoor Facility Demolition issued by the County of San Diego Department of General Services. It addresses bidder questions about plans availability, project methods, environmental mitigation, site access, asbestos quantities, disposal requirements, and site visits. Key clarifications include no online plans, no implosion allowed, environmental monitoring details, asbestos abatement scope, and bid inclusions. The document supports bidders in understanding solicitation requirements and project constraints.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for RFB 3983 Edgemoor Facility Demolition Q&A 2: This document dated August 19, 2009, from the County of San Diego Department of General Services, provides additional questions and answers related to RFB #3983 Edgemoor Facility Demolition. It clarifies bid inclusions such as A/C paving and chain link fence, confirms no extension of the bid date despite addenda changes, and explains hazardous waste disposal requirements for lead-based paint components. The document emphasizes proper removal and disposal of lead components as hazardous waste prior to demolition, referencing federal and state regulations.
PDF
PDF, Low priorityother
LowAI Summary for 59351 S10335 As Built Plans Continued: This document appears to be a continuation of as-built plans associated with project or contract number 59351 S10335. No readable content or detailed information is provided in the document content, so the specific purpose, version, or key details cannot be determined.
PDF
PDF, Low priorityplanholder-list
LowAI Summary for Bidder Planholder List for Demolition of Edgemoor Hospital, Bid 3983: This document is a planholder list for the Demolition of Edgemoor Hospital project with bid number 3983. It includes a table of companies that have purchased contract documents, along with their contact information and dates of purchase. The bid opening date is August 7, 2009, and the estimated cost range is $2.9M to $3.1M. The document also provides project management contact details and pricing information for contract documents and mailing.
PDF
PDF, Low priorityplanholder-list
LowAI Summary for Demolition of Edgemoor Hospital Planholder List Bid No. 3983: This document is a planholder list for the Demolition of Edgemoor Hospital project, bid number 3983, with a bid opening date of August 7, 2009. It includes a detailed table of companies that purchased contract documents, listing their purchase dates, book numbers, company names, addresses, and contact information. The project cost range is estimated between $2.9 million and $3.1 million. The document also provides contact details for the General Services Project Manager, Richard Dinnean, and pricing information for contract documents and mailing fees. No technical specifications or solicitation instructions are included.
PDF
PDF, Low priorityplanholder-list
LowAI Summary for Demolition of Edgemoor Hospital Planholder List Bid No. 3983: This document is a planholder list for the Demolition of Edgemoor Hospital project with bid opening date August 7, 2009, and bid number 3983. It includes a detailed table of companies that purchased contract documents, with their contact information such as addresses, telephone, fax numbers, and email addresses. The cost range for the project is $2.9M to $3.1M. The document also provides information on the price of contract documents ($5.00) and notes that full size plans, cross sections, and soils reports are not available. The project manager is Richard Dinnean, reachable at [phone hidden].
PDF
PDF, Low priorityplanholder-list
LowAI Summary for Demolition of Edgemoor Hospital Planholder List Bid No. 3983: This document is a planholder list for the Demolition of Edgemoor Hospital project with bid opening date August 7, 2009, and bid number 3983. It includes a detailed table of companies that purchased the contract documents, with dates sold, book numbers, company names, addresses, and contact information. The cost range for the project is $2.9M to $3.1M. The document also provides pricing information for contract documents and mailing costs, and notes that cross sections, full size plans, and soils reports are not applicable or available. The project manager is Richard Dinnean, reachable at [phone hidden].
PDF
PDF, Low priorityplanholder-list
LowAI Summary for Demolition of Edgemoor Hospital Planholder List Bid No. 3983: This document is the planholder list for the Demolition of Edgemoor Hospital project, bid number 3983, with a bid opening date of August 7, 2009. It includes a table of companies that have purchased the contract documents, along with their contact information such as addresses, telephone, and fax numbers. The project manager is Richard Dinnean, reachable at [phone hidden]. The cost range for the project is estimated between $2.9 million and $3.1 million. The document also notes the price for contract documents and mailing fees, and indicates that cross sections, full size plans, and soils reports are not applicable or available.
PDF
PDF, Low priorityplanholder-list
LowAI Summary for Demolition of Edgemoor Hospital Planholder List Bid No. 3983: This document is a planholder list for the Demolition of Edgemoor Hospital project with bid opening date August 7, 2009, and bid number 3983. It includes company names, addresses, contact information, and dates when contract documents were sold. The project cost range is $2.9M to $3.1M. The General Services Project Manager is Richard Dinnean. The document also notes prices for contract documents and mailing, and indicates no full size plans, cross sections, or soils reports are available.
PDF
PDF, Low priorityplanholder-list
LowAI Summary for Demolition of Edgemoor Hospital Planholder List Bid No. 3983: This document is a planholder list for the Demolition of Edgemoor Hospital project with bid opening date August 7, 2009, and bid number 3983. It includes a detailed table of companies that purchased contract documents, with their contact information, dates sold, and book numbers. The project cost range is $2.9M - $3.1M. The document also provides the project manager's contact details and pricing information for contract documents. No technical specifications or solicitation instructions are included.
PDF
PDF, Low priorityplanholder-list
LowAI Summary for Planholder List for Demolition of Edgemoor Hospital Bid 3983: This document is a planholder list for the Demolition of Edgemoor Hospital project, bid number 3983, with a bid opening date of August 7, 2009. It includes a detailed table of companies that purchased contract documents, listing dates sold, book numbers, company names, general or subcontractor status, addresses, email addresses, and telephone/fax numbers. The project cost range is estimated between $2.9 million and $3.1 million. The document also provides contact information for the General Services Project Manager, Richard Dinnean, and pricing details for contract documents and mailing. No full-size plans, cross sections, or soils reports are included or available for mailing.
PDF
PDF, Low priorityplanholder-list
LowAI Summary for Planholder List for Demolition of Edgemoor Hospital Bid 3983: This document is a planholder list for the Demolition of Edgemoor Hospital project, bid number 3983, with a bid opening date of August 7, 2009. It includes detailed information on companies that purchased contract documents, including dates sold, book numbers, company names, addresses, email addresses, and telephone/fax numbers. The project cost range is estimated between $2.9 million and $3.1 million. The document also provides contact information for the General Services Project Manager, Richard Dinnean, and pricing details for contract documents and mailing. No cross sections, full-size plans, or soils reports are included or available for mailing.
PDF
PDF, Low priorityplanholder-list
LowAI Summary for Planholder List for Demolition of Edgemoor Hospital Bid 3983: This document is a planholder list for the Demolition of Edgemoor Hospital project, bid number 3983, with a bid opening date of August 7, 2009. It includes a detailed table of companies that have purchased the contract documents, along with their contact information such as addresses, telephone and fax numbers, and email addresses where available. The cost range for the project is estimated between $2.9 million and $3.1 million. The document also provides information on the price of contract documents ($5.00) and notes that full-size plans, cross sections, and soils reports are not available. The project manager is Richard Dinnean, reachable at [phone hidden].
PDF
PDF, Low prioritysummary-of-building-materials
LowAI Summary for Summary of Building Materials Containing Asbestos - Attachment 1: This document is Attachment 1 titled 'Summary of Building Materials Containing Asbestos.' It provides a detailed tabular summary of various building materials found in multiple buildings, including their locations, quantities, and asbestos content results. The materials listed include drywall compounds, acoustic ceilings, floor tiles, mastics, pipe insulation, stucco, plaster, and roofing materials across buildings constructed between 1913 and 2008. The asbestos results specify chrysotile percentages or note assumed asbestos-containing materials (ACM). The document serves as an asbestos material inventory for buildings involved in a project, aiding in identification and management of asbestos hazards.