This Solicitation opportunity from California was posted on June 10, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Asbestos Abatement Specifications for JB Askew Building: This document, prepared in March 2011 for the County of San Diego Department of General Services, outlines the asbestos abatement contract and specifications for the JB Askew Building at 1700 Pacific Highway, San Diego, CA. It includes general requirements, site work protocols, and detailed procedures for asbestos removal in compliance with federal, state, and local regulations. Key content covers contractor responsibilities, modification procedures, project coordination, required submittals, and abatement operations including air monitoring, waste disposal, and safety measures. The document serves as a statement of work guiding contractors on the scope and execution of asbestos abatement activities.
PDF
PDF, High priority: read this firstsurvey-report
HighAI Summary for Asbestos/Lead Prework Survey JB Askew Building 2011-03-03: This document is an asbestos and lead prework survey report for the JB Askew Building at 1700 Pacific Highway, San Diego, dated March 3, 2011. Conducted by the Department of Environmental Health's Community Health Division, the survey was requested by the Department of General Services in preparation for the building's planned demolition. The report details the presence of asbestos in various building materials such as acoustic spray ceiling, floor tiles, thermal system insulation, and roof mastic, among others. It also identifies high concentrations of lead-based paint on specific surfaces, referencing HUD guidelines and local ordinances for lead safety thresholds. The survey includes sampling limitations due to the building being occupied at the time and provides recommendations to mitigate identified hazards.
PDF
PDF, High priority: read this firstsow
HighAI Summary for EIR Mitigation Measures for Project 110767: This document outlines the Environmental Impact Report (EIR) mitigation measures and environmental design considerations for project 110767. It includes detailed requirements for geology and soil compliance, hydrology and water quality management, air quality controls including asbestos handling, transportation and parking management plans, hazardous materials disposal, and noise mitigation strategies. The document references specific mitigation measures (e.g., MM 2.2, MM 2.3, MM 2.4) and incorporates recommendations from geotechnical and environmental studies. It serves as a statement of work to ensure environmental compliance during project construction and operation.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 5152 Askew Building Demolition Addendum 1: This document is Addendum No. 1 to Request for Bid (RFB) 5152 for the Askew Building Demolition, dated June 16, 2011. It forms part of the original solicitation and specifies changes to the original bid documents. The addendum includes instructions for submitting plan holder information and contact details for questions, emphasizing its role in updating and clarifying the solicitation requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 5152 Askew Building Demolition Addendum 2: This document is Addendum No. 2 to Request for Bid (RFB) 5152 for the Askew Building Demolition project. It updates the original solicitation with changes including assumptions about asbestos-containing materials, removal and disposal requirements, jobsite trailer specifications, temporary lighting, and revised demolition plans. The addendum also includes an attachment for the Stormwater Pollution Prevention Plan (SWPPP) and a revised Table of Contents. The SWPPP section provides detailed stormwater management requirements, certifications, and best management practices for the construction phase, prepared to comply with California's General Permit for Storm Water Discharges. The document is dated June 7, 2011, and includes contact information for the Procurement Contracting Officer.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 5152 Askew Building Demolition Addendum 3: This document is Addendum No. 3 to Request for Bid (RFB) 5152 for the Askew Building Demolition project dated June 29, 2011. It modifies the original solicitation by specifying that all floor tile is assumed to be Asbestos Containing Material (ACM) except terrazzo flooring in the first floor lobby. It updates license requirements for bidders to include specific California contractor classifications. The addendum references revised sections 00201 and 00700, which include changes to contractor indemnity and bonds. The project involves hazardous material abatement, demolition, hauling, crushing, stockpiling, and backfilling at specified locations in San Diego, CA. The document also details bid submission instructions, pre-bid conference information, and contractor licensing and labor code compliance requirements.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 5152 Askew Building Demolition Bid Documents: This document is a Request for Bid (RFB) for the Askew Building Demolition project located at 1700 Pacific Highway, San Diego, California. It includes bid submission forms, instructions, and certifications required from bidders. Key sections cover the bid form with total bid pricing, prohibited contracts per San Diego County Administrative Code, designation of subcontractors, and a noncollusion affidavit. The document outlines the requirements for bidders to provide bonds, accept contract terms, and comply with subcontracting rules. It also includes representations and certifications to be completed and signed by the bidder. The version date indicated is June 10, 2011.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 5152 Askew Building Demolition Project: This document is the Project Manual for the Askew Building Demolition Project No. 10154204 issued by the County of San Diego Department of General Services. It includes the Invitation to Bid (RFB No. 5152) with a bid opening date of July 5, 2011. The project involves hazardous material abatement, demolition of existing structures, hauling and crushing concrete and asphalt, backfilling, and associated utility work. The manual contains detailed sections such as bidding information, contract documents, general and supplementary conditions, technical specifications, and attachments including asbestos surveys and geotechnical reports. A pre-bid conference was scheduled for June 23, 2011. The document provides contact information for the project manager and the engineering firm Nasland Engineering responsible for the plans and specifications.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Solicitation 5152 Askew Building Demo Bid Abstract: This document is the bid abstract for Solicitation No. 5152 concerning the Askew Building Demolition project. It lists the opening date as July 5, 2011, at 2:00 P.M. The abstract includes the apparent low bidders and their total bid amounts, with the lowest bid being $596,700.00 by West-Techn. It also notes that the abstract only indicates the apparent low bidder and that conditions such as math errors or non-responsiveness may displace the apparent low bidder. The document contains bid receipt details, bidder names, delivery methods, and contact information for company representatives. This bid abstract serves as a summary of bids received for the demolition project.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for RFB 5152 Askew Building Demolition Planholders List: This document is the planholders list for the Askew Building Demolition project under RFB 5152 with a bid date of July 5, 2011. It includes a table of companies and contact persons who have obtained the plans, categorized as general contractors or subcontractors, along with their addresses and telephone/fax numbers. The list was last updated on June 29, 2011.
PDF
PDF, Low prioritysign-in-sheet
LowAI Summary for RFB 5152 Pre-Bid Conference Sign-In Sheet: This document is a sign-in sheet for the pre-bid conference related to RFB 5152. It lists attendees' names, their companies or departments, phone numbers, and email addresses. The sheet captures participation from various contractors and companies interested in the bidding process. The document serves as a record of attendance for the pre-bid meeting, facilitating communication and follow-up with potential bidders.
PDF
PDF, Low priorityenvironmental-checklist
LowAI Summary for San Diego County Pre-Demolition Environmental Checklist and Guide for Asbestos: This document is a pre-demolition environmental checklist and guide focused on asbestos for the County of San Diego. It explains the nature of asbestos, its health risks, and its common uses in building materials such as boiler rooms, flooring, electrical components, pipe insulation, surfacing materials, roofing, cement materials, ceiling materials, and miscellaneous items. The guide also highlights other environmental and regulatory issues to address before demolition, including solid waste, hazardous waste, oil disposal, and tanks. It emphasizes that this guidance is not a substitute for legal rules and statutes and encourages independent determination of applicability to demolition projects.
PDF
PDF, Low prioritychecklist
LowAI Summary for San Diego County Pre-Demolition Environmental Checklist for PCBs, Lead, and CFCs: This document is a pre-demolition environmental checklist and guide from San Diego County focusing on hazardous materials such as Poly-Chlorinated Biphenyls (PCBs), lead, and chlorofluorocarbons (CFCs). It describes common locations and items where these substances may be found in buildings, including transformers, capacitors, lead-based paint, batteries, and refrigeration equipment. The guide aims to assist in identifying these materials prior to demolition to ensure proper handling and compliance with environmental regulations.
PDF
PDF, Low priorityenvironmental-checklist
LowAI Summary for San Diego County Pre-Demolition Mercury Environmental Checklist: This document is a Pre-Demolition Environmental Checklist and Guide focused on mercury for the County of San Diego. It assists in identifying potential sources of mercury in building demolition projects, emphasizing the importance of not removing mercury from devices but storing them safely. The guide covers special buildings like hospitals and schools, and lists common mercury-containing items in batteries, lighting, HVAC systems, electrical systems, and other industrial equipment. It mandates thorough examination of equipment control boxes and panels for mercury prior to demolition.
PDF
PDF, Low prioritygeotechnical-report
LowAI Summary for Update Geotechnical Investigation Report for County Administration Center Waterfront Park: This document is an update geotechnical investigation report prepared by Geocon Incorporated for the County Administration Center Waterfront Park project in San Diego, California, dated March 29, 2002. It updates a previous 1984 geotechnical report and includes results from field investigations such as drilling monitoring wells and cone penetration tests, laboratory soil testing, and a review of geologic literature. The report covers site and project description, soil and geologic conditions, groundwater, geologic hazards, and provides conclusions and recommendations for grading, foundations, excavation, and other geotechnical aspects relevant to the proposed construction of two new parking structures at the site.