This Solicitation opportunity from California was posted on January 16, 2013. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Bid Package for Modular Building Purchase & Installation, Bid No. 5845: This document is the complete bid package for the Modular Building Purchase & Installation project, Oracle Project No. 1016139, with bid opening on February 28, 2013. It includes bidding information, contract documents, and special notices such as Disabled Veterans Business Enterprise (DVBE) participation requirements. The project involves furnishing and installing a 24' x 60' pre-manufactured building at the Kearny Mesa Juvenile Detention Facility in San Diego, CA. The package outlines mandatory pre-bid conference details, submission instructions, and contact information for project management and procurement officers. It also provides instructions for addenda, plan holders list, and compliance with DVBE participation goals.
PDF
PDF, High priority: read this firstspecial-notice
HighAI Summary for Mandatory Pre-Bid Walk Agenda for Kearny Mesa Juvenile Detention Facility Modular Building Construction: This document is the agenda for the mandatory pre-bid walk for the Kearny Mesa Juvenile Detention Facility Modular Building Construction and Installation project. It outlines key topics to be covered including attendance, introductions, bidding process, site conditions, communications, utilities, security requirements, permits, parking, storage, clean-up responsibilities, owner-furnished equipment, record documents, impact of separate contracts, and miscellaneous items. The agenda is intended to prepare bidders for the project and ensure understanding of site and contract conditions before submitting bids.
PDF
PDF, High priority: read this firstsoils-report
HighAI Summary for rfb5845 2013 soils report for KMJDF Mental Health Office: This soils report dated February 22, 2013, prepared by the County of San Diego Department of Public Works, provides geotechnical information for the proposed Mental Health Office at the Kearny Mesa Juvenile Detention Facility. It includes field work with soil borings, laboratory testing results classifying soils as silty sand, and engineering properties such as density, moisture content, and expansion potential. Recommendations cover soil removal and recompaction, allowable bearing pressures, foundation and flatwork construction specifications, corrosion potential, and drainage requirements. The report supports foundation design and construction planning for the modular office building.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 5845 Addendum 1 Modular Building Purchase & Installation: This document is Addendum No. 1 to Request for Bid (RFB) 5845 for Modular Building Purchase & Installation, Oracle Project No. 1016139. It modifies the original solicitation by replacing page 2-6 with a revised version. The addendum includes updated representations and certifications that bidders must complete, sign, and return with their offer. Key certifications cover not-for-profit status, interlocking directorates, disabled veterans business enterprise representation, debarment and suspension status, cost or pricing data accuracy, and independent pricing certification. The addendum also outlines submission instructions and contact information for the contracting officer.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 5845 Addendum 2 for Modular Building Purchase & Installation: This document is Addendum No. 2 to Request for Bid (RFB) 5845 for Modular Building Purchase & Installation, Oracle Project No. 1016139, dated January 31, 2013. It modifies the original solicitation by replacing several pages, revising award and subcontractor information paragraphs, updating wage determination references, and adding security requirements. It also includes changes to contract termination clauses and updates the Table of Contents. The addendum clarifies bid submission instructions and contract award timelines, emphasizing the lowest responsive, responsible bidder selection. Contact information for the Contracting Officer is provided for inquiries.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 5845 Addendum 3 for Modular Building Purchase & Installation: This document is Addendum No. 3 to Request for Bid (RFB) 5845 concerning the purchase and installation of a modular building, Oracle Project No. 1016139. It clarifies that a mandatory pre-bid conference will be held at 9:00 a.m. on February 4, 2013, at the Building Lobby of 2801 Meadow Lark Drive, San Diego, CA. The addendum modifies the original solicitation document only as stated and provides contact information for the Contracting Officer, Kristen Hill.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 5845 Addendum 4 for Modular Building Purchase & Installation: This document is Addendum No. 4 to Request for Bid (RFB) 5845 for Modular Building Purchase & Installation, Oracle Project No. 1016139. It modifies the original solicitation by replacing page 3-8 from Addendum 2 with a new page 3-8 from Addendum 4. Clarifications include that the fence separating the sally port area from the construction area will be removed by the County prior to delivery, and the modular building must be new. The addendum is issued by Kristen Hill, Contracting Officer, on behalf of the Department of Purchasing and Contracting.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 5845 Addendum 5 Modular Building Purchase & Installation: This document is Addendum No. 5 to Request for Bid (RFB) 5845 for Modular Building Purchase & Installation, dated February 25, 2013. It modifies the original solicitation by updating bid submission details, subcontracting requirements, window specifications, and adding a soils report. It clarifies post-award requirements including Water Pollution Control Plan, foundation work, installation responsibilities, ID badge process, inspections, permits, and coordination with County staff. The addendum is issued by the Department of Purchasing and Contracting, San Diego County, with contact Kristen Hill as Contracting Officer.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 5845 Addendum 6 Modular Building Purchase & Installation: This document is Addendum No. 6 to Request for Bid (RFB) 5845 for Modular Building Purchase & Installation, dated February 28, 2013. It clarifies site work responsibilities including grading, demolition, and electrical removal to be completed by others, and notes that concrete slab installation will be done by a contractor for the County of San Diego. It also states that after award, the modular building will be moved 5 feet to allow for removal and compaction beyond the building footprint perimeter. Contact information for the Contracting Officer is provided.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 5845 Modular Building Purchase & Installation Abstract: This document is the abstract for Solicitation No. 5845, a Request for Bid (RFB) for the purchase and installation of a modular building. The opening date for bids was March 13, 2013. It lists the apparent low bidders and their total bid amounts, with Visionary submitting the lowest bid at $179,000. The work location is in San Diego County, California, specifically for the Kearny Mesa Juvenile Detention Facility. The document includes designation of subcontractors with their business names, addresses, and percentages of the total contract. It also outlines bidder responsibilities, including bonding requirements and compliance with contract provisions. The abstract serves as a summary of bids received and conditions that may affect the apparent low bidder.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 5845 Modular Building Purchase & Installation Bid Documents: This document is part of the bid package for RFB No. 5845 issued by the County of San Diego, California, for the purchase and installation of a modular building at the Kearny Mesa Juvenile Detention Facility. It includes bidder execution documents, bid terms, and conditions, including bid pricing instructions, contract bonding requirements, and compliance certifications such as drug and alcohol policy and debarment status. The document references plans dated January 10, 2013, and outlines the bid submission and award process, emphasizing the lowest responsible bidder criteria and prohibited contracts under the San Diego County Administrative Code.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Planholders List for Modular Building Purchase & Installation Bid #5845: This document is the Planholders List for the Modular Building Purchase & Installation Bid #5845, with a bid date of February 28, 2013. It includes a table listing companies and contact persons who have shown interest in the bid, along with their general or subcontractor status, addresses, phone and fax numbers, and email contacts. The list was updated with entries from January 22, 2013, through February 6, 2013.
PDF
PDF, Low priorityattendance-sheet
LowAI Summary for RFB5845 Mandatory Pre-Bid Walk Attendance Sheet Feb 4 2013: This document is an attendance sign-in sheet for the mandatory pre-bid walk of the KMJDF/ Modular Building Supply-Installation project held on February 4, 2013. It lists attendees including their names, company names and addresses, contractor type (sub or general), phone numbers, and email addresses. The sheet is issued by the County of San Diego Department of General Services and serves to record participation in the pre-bid walk event.