Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on October 21, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFB 6122 Aaron Drive (Saratoga Boulevard to Summer Winds Drive)

Closed
RFB 6122 Project No. 23164State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the comprehensive rehabilitation and reconstruction of approximately 2,500 linear feet of roadway along Aaron Drive, extending from Saratoga Boulevard to Summer Wind Drive. The scope includes pavement removal, subgrade and base reconstruction, and the application of new asphalt surface treatments. Key infrastructure improvements encompass traffic control measures, pavement markings, signage, street lighting, and the demolition of existing utilities. The project also involves the removal, rehabilitation, or installation of underground utilities such as water, wastewater, stormwater, gas, electric, and communication lines, ensuring proper integration with the new roadway. Additionally, the work includes concrete improvements like new sidewalks, ADA-compliant ramps, curbs, gutters, driveways, and housekeeping pads for manholes and valves. The total estimated cost for the project is approximately $5.2 million, with a contract size ranging from $4.68 million to $5.72 million. The project solicitation was posted on October 21, 2024, with a response deadline of November 20, 2024, and is managed by the City of Corpus Christi Finance Department in Texas. The primary contact for the project is Leslie Carreon, reachable via email or phone.

General Info

Agency

Texas → City of Corpus Christi Finance

Place of Performance

TX, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City of Corpus Christi Finance
Contacts1 person available
OfficeN/A
Organization / Agency
Texas → City of Corpus Christi Finance
Office AddressN/A

Full Description

Show more
Aaron Dr. (Saratoga to Summer Wind): The project consists of the rehabilitation/reconstruction of approximately 2,500 lf of existing pavement, right‐ofway and associated infrastructure appurtenances. General requirements of the contractinclude but are not limited to traffic control, pavement markings and signage, demolition and street lighting. Street improvement construction will include subgrade and base reconstruction/replacement, associated pavement saw cutting, prime coating,undersealing and placement of HMAC surface treatment. Underground utilities including water, wastewater, stormwater, gas, electric and miscellaneous communications will be removed, rehabilitated, installed as new or adjusted as part of the contract. Concrete work on the project will include new sidewalks, ADA ramps, curb and gutter, driveways and manhole cover/valve cover housekeeping pads.  Estimate: $5,200,000.00

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS