This Solicitation opportunity from California was posted on April 24, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Rfb 8075 - Construction Contract For Winter Gardens Blvd At Winter Gardens Drive Traffic Signal Installation And Interconnect Project Federal Aid Project No. Hsipl-5957 (119)
Closed
RFB 8075State & Local
Submission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
HighAI Summary for Bid No. 8075 - Winter Gardens Blvd Traffic Signal Installation: Request for Bids (RFB) from the County of San Diego for the installation and interconnect of traffic signals at Winter Gardens Boulevard and Winter Gardens Drive (Federal Aid Project No. HSIPL-5957). The document includes bid opening date of June 01, 2017, DBE goals of 10%, and a comprehensive table of contents covering bidding information, proposal requirements, special conditions, and technical provisions.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for General Decision CA170001 - San Diego County Wage Determination: General Decision Number CA170001 (dated 05/26/2017) for San Diego County, California. This document specifies the prevailing wage rates and fringes for various construction types, including Building, Heavy, Highway, and Residential projects, in compliance with the Davis-Bacon Act and Executive Order 13658.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 8075 Addendum 1 - Base Bid Schedule: This document is Addendum 1 to RFB 8075, containing a continuation of the Base Bid Schedule. It lists specific line items for paving, traffic signal systems, fiber optic cabling, and communication equipment, including estimated quantities and units of measure for pricing.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 8075 Addendum 1 - Base Bid Schedule: This document is Addendum 1 for RFB 8075, specifically providing a continuation of the Base Bid Schedule. It contains a detailed list of line items (17 through 39) for construction and installation, including asphalt concrete, traffic signal systems, fiber optic cabling, and network switches, with associated estimated quantities and units of measure for pricing.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 8075 Addendum No. 1 - Winter Gardens Blvd Traffic Signal Installation: Addendum No. 1 dated May 12, 2017, for RFB 8075 regarding the Winter Gardens Boulevard at Winter Gardens Drive Traffic Signal Installation and Interconnect. This document modifies the original contract documents by replacing specific pages in Part II and Part III, updating technical provisions in Part V regarding compensation for ATC EX 2070 traffic signal controllers and training, and deleting a specific communication equipment item from the project plans.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 8075 Addendum No. 2 - Winter Gardens Blvd Traffic Signal Installation: Issued May 18, 2017, by the County of San Diego, this addendum modifies RFB 8075 for the Winter Gardens Boulevard at Winter Gardens Drive traffic signal installation. It provides clarifications via a Q&A section regarding conduit installation methods (trenching vs. boring) and the coordination responsibilities with AT&T for facility connections.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 8075 Addendum No. 3 - Winter Gardens Blvd Traffic Signal Installation: Issued May 26, 2017, by the County of San Diego, Addendum No. 3 modifies Request for Bid (RFB) 8075 for the Winter Gardens Boulevard at Winter Gardens Drive Traffic Signal Installation and Interconnect. The amendment replaces page 4-8 of Part IV (Special Conditions) and pages 6-18 through 6-44 of Part VI (Other Agency Requirements).
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 8075 - Winter Gardens Blvd Traffic Signal Installation: This document contains a bid abstract for RFB 8075 (opening June 1, 2017) and three subsequent addenda (dated May 12, May 18, and May 26, 2017). The project involves traffic signal installation and interconnect at Winter Gardens Blvd and Winter Gardens Dr. The bid abstract lists totals for four bidders, with HMS Construction, Inc. as the apparent low bidder. The addenda provide technical changes to specifications, Q&A regarding trenching and AT&T coordination, and updates to special conditions and agency requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFB 8075: Winter Gardens Blvd & Winter Gardens Dr Project Plans: Construction plans and technical specifications for the traffic signal and interconnect project at Winter Gardens Blvd & Winter Gardens Dr in Lakeside, CA. The document includes references to Caltrans Standard Specifications (May 2006), Caltrans Standard Plans (2010), San Diego Area Regional Standard Drawings (Aug 2012), and San Diego County Design Standards (Nov 2012), along with a detailed project legend and survey control statements.
PDF
PDF, High priority: read this firstpre-bid-meeting
HighAI Summary for RFB No. 8075 - Winter Gardens Blvd. & Winter Gardens Drive Pre-Bid Presentation: Pre-bid conference presentation dated May 16, 2017, for RFB No. 8075 regarding the Winter Gardens Blvd. & Winter Gardens Drive Traffic Signal & Interconnect project. The document includes project limits, plan overviews, site conditions, and detailed bid schedules for the Base Bid and Additive Alternates, including specific quantities for fiber optics, conduits, and traffic control equipment.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for S40920 Addendum 3 - Wage and Safety Provisions: This document is Addendum 3 for project S40920. It outlines requirements for State and Federal prevailing wage compliance under the Davis-Bacon Act, specifically referencing General Decision Number CA170001 (Modification No. 9). Additionally, it specifies public safety requirements for the installation of temporary Type K railing near excavations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Winter Garden Blvd/Dr Traffic Signal Installation - Materials Lab Report: Dated August 22, 2014, this intradepartmental memorandum from the County of San Diego DPW Materials Lab provides structural section recommendations for the Winter Garden Blvd. and Winter Garden Dr. traffic signal installation project (W.A. #: 1018802). It includes field investigation results, laboratory soil testing (R-value of 44), and specific pavement design recommendations for asphalt concrete and aggregate base layers.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Bid #8075 Planholders List - Winter Gardens BI Traffic Signal Installation: A planholders list dated May 15, 2017, for Bid #8075 regarding the Winter Gardens BI at Winter Gardens Dr Traffic Signal Installation. The document lists companies that have obtained project plans, including Tri Group Construction and Servitek Solutions Inc., with a bid date of June 1, 2017.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Bid #8075 Planholders List - Winter Gardens BI Traffic Signal Installation: A planholders list for Bid #8075 regarding the Winter Gardens BI at Winter Gardens Dr Traffic Signal Installation, dated May 1, 2017, with a bid date of June 1, 2017. The document lists registered bidders, including Tri Group Construction.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Bid #8075 - Winter Gardens BI Traffic Signal Installation Planholders List: A planholders list dated May 2017 for Bid #8075 regarding the Winter Gardens BI at Winter Gardens Dr Traffic Signal Installation. The document lists registered general contractors, including Tri Group Construction, Servitek Solutions Inc., and HMS Construction, Inc.
TXT
TXT, Low priority1 page · award
LowAI Summary for PO 556930 - HMS Construction Inc Award: Award notification for PO 556930 to HMS Construction Inc for the Winter Gardens Blvd at Winter Gardens Drive traffic signal installation and interconnect project (Federal Aid Project No. HSIPL-5957). Performance period is from 10/4/2017 to 12/3/2017.
PDF
PDF, Low priorityother
LowAI Summary for RFB 8075 Pre-Bid Conference Sign-In Sheet: A sign-in sheet for the pre-bid conference regarding RFB 8075 for Winter Grades Blvd. and Winter Grades Drive Traffic Signal & Interconnect. The document records the names, companies, and contact information of attendees.