Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on May 12, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFI Nett Warrior Electrical/Data Connector Assessment

Closed
W91CRB_21_NW_CONNECTORS_RFIFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

MD

Set-Aside

NONE

Documents

3

05-11-2021_RFI+Questions+and+Responces.xlsx

XLSX

20210223+Nett+Warrior+Connectors+Specification_For+Release.pdf

PDF

A1-44841D.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Apg
Contacts2 people available
OfficeABERDEEN PROVING GROU, MD, 21005-5001, USA
Office AddressABERDEEN PROVING GROU, MD, 21005-5001, USA
Contacts
Amanda M. Bailey

Full Description

Show more
Request for Information (RFI)- Nett Warrior Electrical/Data Connector Assessment Scope The purpose of this Request for Information (RFI) is to solicit industry feedback regarding their capability to deliver special-purpose electrical connectors for cable manufacturing to support Product Manager Integrated Visual Augmentation System (PM IVAS), Ft Belvoir, VA. These connectors are part of Nett Warrior (NW) and IVAS systems that provides Battle Command and Situational Awareness to dismounted soldiers. These connectors are also employed in US Army expeditionary power products used in the field. The NW program established a technical architecture for interconnect cables based on earlier versions of the system, extensive qualification, field testing, trade-offs with multiple alternative sources and design iterations in earlier versions of the system. Tobyhanna Army Depot (TYAD) produces the interconnect cable assemblies for the NW Production and Fielding phase. Glenair Inc. and TE Connectivity manufacture electrical connectors that are a miniaturized version of MIL-DTL-38999 open standard connectors. These push/pull connectors have been specified for use by the NW program. Based on program requirements, all interface cable connectors shall be fully compatible with specific versions of Glenair 807 series connectors and the qualified TE equivalents. Information contained in this RFI is the result of preliminary research on existing depot connector resources, business intelligence capabilities, is subject to modification and is in no way binding on the Government. There is no guarantee that any submission in response to this RFI will result in a Government contract. Process In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government does not intend to make an award on the basis of this RFI. This RFI is issued solely for information and planning purposes only and does not constitute a solicitation. Responses will be treated as information only and will not be considered a proposal. The information submitted in response to this RFI may be used to help the Government further define requirements and compatible connectors to be considered. If the Government develops a requirement that addresses any submitted or similar connectors, the resulting procurement will address technology and business requirements to achieve the required objectives. Any results developed from this RFI may be the subject of a subsequent acquisition, and any such acquisition will be publicized accordingly. Responders to this RFI will have no competitive advantage in receiving awards related to the submitted topic area. Responders are solely responsible for all expenses associated with responding to this RFI. The Government does not intend to pay for the information solicited. No entitlement to payment of direct or indirect costs or charges by the Government will arise because of submission of responses to this RFI and the Government's use of such information. All information received in response to this RFI that is marked as proprietary will be handled accordingly. Responses that indicate the information therein is proprietary, or represents confidential business information, will be received and held in confidence. Proprietary information submitted, as part of responses to the RFI, shall be clearly identified as COMMERCIAL IN-CONFIDENCE. The Government reserves the right to follow up on a one-on-one basis with RFI respondents to gain additional information or clarity about information submitted by respondents, best practices, industry environment, and other subjects relevant to this RFI. Interested responders shall provide data and production representative connectors in a phased approach to determine interest and capability to provide source of supply for connector equivalents that are 100% compatible with the connectors defined below: Glenair 8070-1675-01ZNU6-6SY, Connector Receptacle, Crimp Socket Glenair 8070-1676-06ZNU6-6PY, Connector Plug, Crimp Pins TE 2226920-1 TE 2226910-1 Responses require engineering analysis, submission of drawings, providing test results, and supplying production representative sample connectors for the Government to assess compatibility with the benchmarks. The Government will evaluate progress at the completion of each phase and determine if the candidate(s) sufficiently meet the criteria, before proceeding into subsequent efforts. Detailed requirements on connector performance and test criteria are available on request. Details The Government will conduct a four phased technical assessment: Identify candidates Evaluate test results provided by industry Manufacture sample cables for supplier testing Conduct system testing by TYAD, and/or other Government agencies Phase I--Identify Candidates Interested suppliers shall submit technical details on candidate connectors to TYAD for technical evaluation. This evaluation will assess the supplier's capacity to define the appropriate interfaces, dimensions, tolerances and materials in their candidate. Suppliers shall provide drawings with sufficient information to perform an engineering assessment conducted by TYAD. The Government will not assist industry in revising submissions or provide advice on developing a conforming product. Successful candidates, as determined by the TYAD engineering analysis, will be invited to participate in Phase II. Phase II--Manufacture sample connectors and test Suppliers meeting the criteria in Phase I may continue into Phase II to produce 20 each of both types of connectors. These connectors shall undergo testing by the supplier using certified equipment or by independent certified test facilities to validate conformance to a set of performance criteria provided by the Government. Tests, as defined by TYAD, shall include mechanical and electrical compatibility with the benchmarks, as well as certain types of environmental testing tailored from MIL STD 810. TYAD will evaluate test results documentation submitted by industry. Failure to meet all requirements will be reason for dismissal of the applicant. The Government will not assist industry in revising submissions or provide advice on developing a conforming product. Successful candidates, as determined by TYAD, will be invited to participate in Phase III. Phase III--Manufacture sample interconnects for subassembly testing Suppliers that successfully complete Phase II will be invited to provide 20 each of both types of connectors and sufficient instructions for TYAD to produce cable assemblies with the candidate connectors. The supplier may advise TYAD cable manufacturing on the assembly process to assure builds are complete as intended. Process metrics will be collected to assist the Government in determining materials and labor content required to manufacture interconnect assemblies. The Government may provide assembly details on interfacing the candidate connector the currently defined wire stock, cable shielding and overmolding. Ten each of the resulting products will be returned to the supplier to conduct cable assembly testing to validate conformance to specifications and associated verification criteria. Supplier testing shall use certified equipment or be conducted by independent certified test facilities. Test data shall be submitted to TYAD for evaluation and candidates assessed as successful shall be further evaluated in Phase IV by TYAD. Phase IV--System Testing Suppliers who successfully complete Phase III will continue evaluation into Government testing. TYAD will use the remaining 10 each cable assemblies to perform detailed testing on fully configured Nett Warrior systems to examine performance at the system level. This step is necessary to assess aspects of connector-related system performance that cannot be evaluated at the component level. A final evaluation will be conducted after completing testing and results will be provided to the Nett Warrior program office. Individual respective assessments will be provided to each supplier participating in this phase. Phase I is the initial focus of this RFI. Interested participants shall provide technical information as described for Phase I, sufficient for TYAD to determine physical compatibility with the benchmarks. Note any proprietary data as defined in the Process section of this RFI. Send questions or concerns regarding this RFI through e-mail to: Nett Warrior Systems Engineering usarmy.belvoir.peo-soldier.list.nett-warrior-qualification@mail.mil AND Amanda M. Bailey amanda.m.bailey32.civ@mail.mil Questions submitted prior to the closing date and answered by the Government will be published and available to parties registering interest in this RFI. Complete responses to this RFI shall to be submitted electronically to the above referenced e-mail address, no later than 14 May 2021. Responses shall include the name, telephone number, and e-mail address of a point of contact having authority and knowledge to discuss responses with TYAD. The suspense for all submissions is no later than 14 May 2021.

More opportunities from Department Of Defense → W6QK Acc-Apg

Same awarding agency

NAICS: 541519
New
Federal
Cyber Security Engineering and Risk Management Framework Support
Solicitation # W91CRB-26-B-A006
Solicitation W91CRB-26-B-A006 is a firm-fixed-price requirement for Cybersecurity Engineering and DoD Risk Management Framework (RMF) Support Services at the Aberdeen Test Center in Maryland. The contractor will provide all necessary personnel, equipment, and non-personal services to establish and maintain Authority to Operate (ATO) and RMF compliance for the ATC Local Area Network, Logically Isolated Network, Secure Test Environment, and Test and Evaluation Network. The scope includes RMF lifecycle activities, engineering and configuration support, and incident management, adhering to DoD RMF standards for Secret systems and Intelligence Community Directive 503 for Top Secret requirements. The contract spans a five-year period of performance from November 23, 2026, to November 22, 2031, consisting of a base year and four option years. This is a small business set-aside with a preference for HUBZone concerns. Award will be made to the lowest-priced, responsive, and responsible bidder based on a Total Evaluated Price calculation. Key personnel requirements include a Senior IT Solutions Architect with CISSP certification and 10 years of experience, as well as other IT professionals with CASP+ or equivalent certifications. Security requirements are stringent, requiring a Secret Facility Security Clearance at the time of bid, with specific personnel requiring Top Secret clearances for surge support.
Other Computer Related Services

POSTED

about 9 hours ago

DEADLINE

in 16 days
View Details
NAICS: 541611
New
Federal
FY27 Mentor Protege Program (MPP) Broad Agency Announcement
Solicitation # MPP-FY2027
The Department of War Mentor-Protégé Program (MPP) is a business development initiative designed to strengthen the Defense Industrial Base by pairing large prime contractors with eligible small businesses. Mentors must be prime contractors with at least 25 million dollars in Department of War contracts from the previous fiscal year and an active subcontracting plan. Eligible protégés include small businesses meeting SBA size standards and specific socio-economic categories, such as HUBZone, Women-Owned, or Service-Disabled Veteran-Owned firms. The program focuses on technical priorities including IT infrastructure modernization, cloud optimization, data integration, AI/ML implementation, and cybersecurity. The application process is a two-phase submission. Phase one requires a white paper summarizing technical and cost information, which are reviewed on a quarterly rolling basis. Selected applicants proceed to phase two to submit a final proposal, including a statement of work and cost proposal. Agreements are limited to reimbursable contracts with a maximum period of performance of 36 months. Additionally, the Protégé Pilot Initiative allows protégés to propose specific engineering or software projects for up to 25 percent of the annual agreement budget. All participants must maintain active registration in SAM.gov.
Administrative Management and General Management Consulting Services

POSTED

1 day ago

DEADLINE

in 9 months
View Details
NAICS: 541715
New
Federal
Request for Information – Prophylactic Platform for Medical Countermeasures
Solicitation # W911SR27SPPFC
The Department of Defense, through the Portfolio Management Executive for Chemical, Biological, Radiological and Nuclear Defense (PME CBRND) and the Accelerated Defense Pharmaceuticals (ADP) program, is issuing a Request for Information (RFI) under solicitation W911SR27SPPFC. The objective is to identify capable companies that can advance the development of prophylactic medical countermeasures (MCMs) using existing platform technologies. The program focuses on progressing these countermeasures through Phase I or Phase II clinical trials, with a goal of enabling interim fielding via Expanded Access Protocols or pre-Emergency Use Authorization. The anticipated period of performance is up to four years, with work primarily conducted at the contractor's facilities. Interested respondents must provide a comprehensive capability description, including technical approach, regulatory status with the FDA, cGMP manufacturing capabilities, and a development roadmap with rough order of magnitude cost estimates. Evaluation criteria for future selections will emphasize manufacturing process capability, product safety and efficacy, past FDA experience, and the plug-and-play nature of the platform across various pathogens. Submissions must be delivered as a single searchable PDF, featuring a specific cover page and a core capability description not exceeding four pages. All non-clinical and clinical data must be SEND and CDISC compliant, and manufacturing must adhere to cGMP standards to support an Investigational New Drug application through a Biologics License Application.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

1 day ago

DEADLINE

in 29 days
View Details
NAICS: 541512
New
Federal
Sizing Technology Pilot
Solicitation # HQDA-G-4_26_01
The Army Contracting Command-Aberdeen Proving Ground, acting for the Headquarters Department of the Army G-4, is seeking innovative commercial solutions for a Sizing Technology Pilot. The objective is to replace manual tape measurements with automated, non-contact methods such as body and foot scanning, computer vision, and AI-driven extraction to accurately determine standard Army uniform and footwear sizes. This initiative targets four primary pipelines: Initial Entry Training Soldiers at MEPS, West Point Cadets, Senior ROTC Cadets at civilian institutions, and in-service Soldiers preparing for deployment. The goal is to eliminate logistical bottlenecks and reduce high return rates of clothing and boots. Issued under the Defense Commercial Solutions Opening authority, this solicitation may result in FAR contracts, non-FAR agreements, or Other Transactions, with the government anticipating up to three small pilot contracts. Interested offerors must submit a Phase 1 Solution Brief by October 20, 2026, which will be evaluated based on technical merit, project schedule, and commercial viability. Key requirements include the ability to integrate with Army Vantage / ISM, strict compliance with Section 508 accessibility standards, and adherence to the Privacy Act. Additionally, the government requires 100 percent ownership of all captured measurement and sizing data. Eligible respondents must possess a Unique Entity ID and active SAM registration.
Computer Systems Design Services

POSTED

3 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS