Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 16, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFID Tool Boxes

Closed
F1RT2A8259A001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

423830 - Industrial Machinery and Equipment Merchant Wholesalers

Place of Performance

381 Third Street, DYESS AFB, TX, 79607, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4661 7 Cons Cd
Contacts2 people available
OfficeDYESS AFB, TX, 79607-1581, USA
Office AddressDYESS AFB, TX, 79607-1581, USA
Contacts
John M HebdonContracting Officer
Steven M GrowContract Manager

Full Description

Show more
In accordance with FAR 5.207 (14) the 7th Contracting Squadron is posting this notification to the public. The proposed acquisition is for equipment for which the Government intends to solicit and negotiate with only one source under authority of FAR 6.302. The IDZ Company has demonstrated a unique and innovative tool control system and is presently available for delivery. This system includes but is not limited to check-in/out of many tools to many users, control of non-taggable tools and equipment, world-wide use of system without licensing requirements, 14 hour battery power while sustaining steady use, small enough to be transported a C-130 or KC-135, use of pre-existing government tools, adaptable to existing rooms and infrastructure (small enough not to exceed standard tool box sizes), use easily replaceable parts so that users have ability to fix system, visual screens with easy to read color-coding for quick end-of-day turnover, foam or visual control for manual check-out, adaptability to future tool additions/changes in tool sizes/or removal of tools without having to replace the system, AFI21-101 reports automated, user-friendly networked system/screens for management and for daily shift supervisors, customizable reports able to be seen/manipulated with Microsoft products, use of Common Access Card (CAC) for tool access, restriction on tool access based on grade or position, auto back-up/ability to store or transfer information automatically, ability to encode digital WWIDs/unique 9-code identifiers into micro-chip, inspection/calibration/warranty tracking ability, unique tool recognition (ability to distinguish between like-items and real-time information stored in system and tool to ID user), ability to check-out tools for extended periods of time (TDY) without cluttering end-of-day turnover screen, user paired with check-out tool from within software system and tool to include time of check-out/location of tool within box/WWID/and user ID, ability to track individual item utilization rates for addition of high interest tools/removal of low interest/use tools, capable of kitting items by job for check-out (i.e. multiple sockets kitted for check-out), constant real-time inventory with visual/audio indicators, missing/broken tool coded tools, capability to manually access and easily issue tools under power-out conditions, 100% security/accountability after loss of power, ability to quickly/easily refresh software and accountability after a power loss, option for all-weather capable, option for night vision lighting for night use in night vision conditions, easily used in chemical protective equipment (MOPP 4), option to have ruggedized for use in trailer on the flight line. 100% automated control with integrated wireless software capability and software rights for 1,000 tools using at least five check-in/out points for parallel operations all with their own screens for easy accountability with 100 spare RFID tracking devices and ability to encode new RFID tags at two locations and a one year on-site maintenance guarantee. Note 22 apply - exception: All reference in note 22 in regarding 45 and 30 days is changed to 7 days. Interested parties may identify their interest and capability to respond. This notice of interest is not a request for a competitive proposal, however proposals received within 7 days (23 Sep 08 / 1200 CST) will be considered. A determination by the government not to compete this requirement is based on responses to this notice and is solely within the discretion of the Government. All offerors may respond to this offer no later than the date stated above via email to john.hebdon@dyess.af.mil , fax attention to SSgt John Hebdon at (325) 696-4078 or lastly mailed to 381 Third Street Dyess AF, TX 79607.

More opportunities from Department Of Defense → FA4661 7 Cons Cd

Same awarding agency

NAICS: 238120
New
Federal
Airfield Blast Shield
Solicitation # FA466126R0008
Solicitation FA466126R0008 is a 100% Small Business Set-Aside invitation for bid for the fabrication and erection of new blast deflector fences for B1-B bombers at the South Apron of Dyess Air Force Base, Texas. The project has an estimated magnitude between 1 million and 5 million dollars. The required deflectors must be curved, non-perforated, galvanized, and corrugated, with the Lynnco Type GS-20-2 serving as the technical standard. These structures must be capable of withstanding 30,000 lbs of thrust from a B1-B engine nozzle at a minimum distance of 90 feet, enduring temperatures of approximately 1400 degrees Fahrenheit and velocities of 900 MPH. All work must comply with the International Building Code, National Fire Codes, Unified Facilities Criteria, and other applicable federal, state, and local regulations. The contract is divided into a base bid for five deflectors with a 60-calendar day performance period and an option for two additional deflectors with a 14-calendar day performance period. Award will be based on the Lowest Price Technically Acceptable (LPTA) methodology, evaluating technical narratives for feasibility and the ability to recover from schedule slippages exceeding 5 percent. Contractors are required to provide performance and payment bonds, adhere to Davis-Bacon Act wage determinations, and follow strict airfield safety and security protocols, including the use of designated haul routes and escorts for restricted area access. Invoicing and payment will be processed electronically through the Wide Area WorkFlow system.
Structural Steel and Precast Concrete Contractors

POSTED

4 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS