Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Michigan was posted on August 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP-171-260000002453-2 | 751/26405.JGH; Lake Orion BAS - Site Improvements

Closed
RFP-171-260000002453-2State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Michigan Department of Technology, Management and Budget (DTMB) has issued a Request for Proposals for professional architectural and engineering services to support the Lake Orion Boating Access Site Improvements project. Located at 421 Indianwood Rd, Lake Orion, MI, the project aims to renovate and repair infrastructure that has exceeded its service life. The scope of work encompasses preliminary design, final design, and construction administration, including specific tasks such as repaving the drive and parking lot, constructing new bathroom and attendant booth structures, installing signage and bollards, and evaluating the boat launch surround, retaining walls, and stormwater drainage. The professional firm will be responsible for managing construction quality control, monitoring contractor performance, and ensuring all work meets design intent and regulatory standards. Proposals are due by August 27, 2026, at 2:00 p.m. ET and must be submitted electronically via the SIGMA VSS portal. Evaluation will be conducted by an Ad Hoc Advisory Committee based on a combined assessment of technical and cost proposals, with the technical portion weighted at 80% and the cost portion at 20%. The contract will be awarded on an hourly billing rate basis with a maximum not-to-exceed cost determined by the selected professional. Key requirements for respondents include the appointment of a dedicated Project Manager, compliance with various state and federal regulations including ADA and prevailing wage laws, and the submission of specific certifications regarding Michigan business status and professional responsibility. Successful contractors must also provide necessary performance and payment bonds and maintain required insurance coverage.

General Info

DTMB seeks architectural and engineering services for Lake Orion Boating Access Site infrastructure improvements.

Place of Performance

MI, USA

Set-Aside

NONE

Documents

16

04-PAV-GRADE - Bio Retention and Water Basis Calculations

DOWNLOAD, High priority: read this firstspecifications
High

Addendum 01 - 751/26405.JGH Lake Orion Boating Access Site Improvements

DOWNLOAD, High priority: read this first2 pages · amendment
High

Concrete Pavement Details Sheet

DOWNLOAD, High priority: read this firstspecifications
High

DTMB-0427 Lake Orion Boating Access Site Improvements Project Statement

DOWNLOAD, High priority: read this first2 pages · project-statement
High

DTMB-0430 RFP Billable Rate 751-26405-JGH

DOWNLOAD, High priority: read this first19 pages · rfp
High

Lake Orion Boat Access Site Topographical Survey

DOWNLOAD, High priority: read this firstsow
High

Lake Orion Boating Access Site Engineering Plans

DOWNLOAD, High priority: read this firstspecifications
High

Lake Orion Boating Access Site - Geometric and Striping Plan

DOWNLOAD, High priority: read this firstspecifications
High

Lake Orion Boating Access Site - Removal Plan

DOWNLOAD, High priority: read this firstsow
High

Landscape Specifications

DOWNLOAD, High priority: read this firstspecifications
High

Michigan Professional Services Contract Billing Rate Rev 04-25

PDF, High priority: read this first63 pages · contract-document
High

Meeting Attendance Record - Lake Onno Building Access Site Improvement

DOWNLOAD, Low priorityother
Low

State of Michigan Facilities Administration – General Work

DOWNLOAD, Low priorityother
Low

05-SECTIONS (1).pdf

DOWNLOAD

09-SOIL EROSION (1).pdf

DOWNLOAD

10-SOIL DETAILS.PDF

DOWNLOAD

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMichigan → DTMB
Contacts2 people available
OfficeVarious, MI, USA
Organization / AgencyMichigan → DTMB
Office AddressVarious, MI, USA

Full Description

Show more
751/26405.JGH; Lake Orion BAS - Site Improvements

More opportunities from Michigan → DTMB

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS