Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on July 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP #26-07-001 LCTA Engineering For Bus Stop Improvements

Closed
Luzerne County Transportation Authority, PAState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Luzerne County Transportation Authority (LCTA) is soliciting engineering and design services to improve accessibility at 27 existing bus stops across its system in compliance with the Americans with Disabilities Act (ADA) and the Public Right-of-Way Accessibility Guidelines (PROWAG). The scope of work is restricted to the development of bid-ready construction plans for concrete improvements, including slope adjustments, boarding dimensions, and right-of-way verification, with no design or environmental work required for curb cuts or electrification. Proposers must deliver complete design packages for all 27 locations, incorporating detailed drafting of PennDOT Highway Occupancy Permits (HOPs) for 16 stops located on state roadways, submission of these permits via PennDOT’s E-permitting system (EPS), and completion of the Section 106 and Categorical Exclusion documentation for FTA compliance. The work must be conducted within existing public right-of-way, with additional site surveys required if relocation or encroachment onto private property is necessary. A detailed month-by-month project schedule is required, outlining key milestones including data gathering, 30%, 60%, and 90% design phases, permit submissions, and final bid package delivery, with full project completion expected within six to eight months. Proposals must be submitted electronically through the PennBid portal by August 31, 2026, and must consist of separate technical qualifications and cost proposals, with a strict 25-page limit inclusive of all resumes and supporting documentation. The procurement follows Qualification-Based Selection (QBS) under the Brooks Act and FTA Circular 4220.1F, meaning evaluation and ranking will be based solely on technical merit—weighted as follows: Project Approach & Sequencing Strategy (30 points), PennDOT and Local Municipality Experience (25 points), Qualifications & Technical Competence of Key Personnel (25 points), and Past Performance on Similar Transit Projects (20 points). Price will not be considered until after the highest-ranked firm is selected, at which point contract negotiations will proceed based on a fair and reasonable price. All proposers must complete and submit the Bidder/Proposer List Application, along with required federal certifications, including Buy America, Federal Debarment, Lobbying Disclosure, ADA Compliance, and Environmental Standards, and must demonstrate experience with PennDOT HOP processes, Section 106 and CE submissions to the Federal Transit Administration, and successful delivery of bus stop, sidewalk, or streetscape

General Info

LCTA seeks ADA/PROWAG-compliant bus stop design plans for 27 stops with PennDOT HOPs, Section 106, and CE docs, due Aug 31, 2026.

Place of Performance

Luzerne County, PA, USA

Set-Aside

NONE

Documents

15

FTA Required Clauses Appendix A Updated 04-01-26

PDF, High priority: read this firstcontract-document
High

RFP #26-07-001 LCTA Engineering for Bus Stop Improvements

PDF, High priority: read this firstrfp
High

RFP 26-07-001 LCTA Engineering for Bus Stop Improvements

PDF, High priority: read this firstrfp
High

RFP 26-07-001 Luzerne County Transportation Authority Bus Stop Engineering

PDF, High priority: read this firstrfp
High

LCTA Vendor Profile & Bidders List Application Form

PDF, Low priorityapplication-form
Low

Luzerne County Transportation Authority Vendor Profile & Bidders List Application

PDF, Low priorityvendor-profile-application
Low

Appendix A Project Locations and Improvements.zip

ZIP

Appendix A Project Locations and Improvements.zip

ZIP

Appendix A Project Locations and Improvements.zip

ZIP

Appendix B LCTA Equipment Specs and Shelter Pad plan.zip

ZIP

Appendix B LCTA Equipment Specs and Shelter Pad plan.zip

ZIP

Appendix B LCTA Equipment Specs and Shelter Pad plan.zip

ZIP

Appendix C Environmentals and Section 106.zip

ZIP

Appendix C Environmentals and Section 106.zip

ZIP

Appendix C Environmentals and Section 106.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Luzerne County
ContactsNo contacts available
OfficeLuzerne County, PA, USA
Organization / AgencyPennsylvania → Luzerne County
Office AddressLuzerne County, PA, USA
ContactsNo contact information available

Interested Companies (78)

PaleoWestTallahassee, FL
IMSSan Diego, CA
Wallace MontgomeryHunt Valley, MD

See All 78 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The goal of this project is to engineer improved bus stop accessibility at existing bus stops across the LCTA system, while ensuring compliance with the Americans with Disabilities Act (ADA) and the Public Right of Way Accessibility Guidelines (PROWAG). Using LCTA’s Bus Stop Improvement Plan, developed in coordination with the Pennsylvania Department of Transportation (PennDOT) and supported by Kimley‑Horn, LCTA has selected 27 existing bus stop locations to receive improvements. The Engineering scope of work includes developing concrete construction plans that address technical specifications such as slope and boarding dimensions, right-of-way (ROW) verification, and ultimately delivering final construction plans that will be executed in a separate Phase II construction bid, with the Phase II RFP to be released promptly upon completion of this Engineering phase. The project only includes design work for concrete improvements at existing bus stops and permitting, along with completing the Section 106 and Categorical Exclusion worksheet to support the Federally funded project. There is no design or environmental work needed pertaining to curb cuts or electrification. Bidding Documents can be obtained at no cost on PennBid at https://pennbid.bonfirehub.com.
Proposal Submission Requirements Bids must be submitted electronically via PennBid at https://pennbid.bonfirehub.com. Proposers must submit technical qualifications and cost proposals in separate documents.
In addition to all proposal requirements, all proposers must complete and submit with their RFP the Bidder/Proposer List Application in PennBid at https://pennbid.bonfirehub.com.
Failure to submit the completed Bidder/Proposer List Application with your proposal may result in the proposal being deemed non-responsive. All required federal forms, certifications, and affidavits included with this RFP must be fully completed, signed, and submitted with the proposal. Failure to provide completed and signed federal forms may result in the proposal being deemed non-responsive. Total page limit for proposals is capped at a total of 25 pages (including resumes of key project staff). Late submissions will not be accepted. Questions and Clarifications Questions regarding this project shall be submitted via the “Ask a Question” feature in PennBid at https://pennbid.bonfirehub.com
Responses will be issued via addendum. Addenda will be posted on PennBid and notification via Public Notice sent to Bidders who have registered with and downloaded documents from PennBid.
Procurement Schedule LCTA anticipates the procurement process will proceed according to the following schedule: Milestone Date RFP Release Date Monday, July 20, 2026 Deadline for Questions Monday, August 3rd, 2026 Responses to Questions/Addendum Issued Monday, August 17th, 2026 Proposal Due Date and Time Monday, August 31st, 2026 Anticipated Award Recommendation Wednesday, September 16th, 2026 Anticipated Board Approval Tuesday, September 22nd, 2026
Scope of Work: Engineering & Design LCTA has identified 27 locations to move to design. The locations are in the public r/w but would need boundary survey if the stop is identified for relocation, or would encroach on private property with additional concrete or expanded boarding areas. Please see Appendix A for locations and associated accessibility improvements. The spreadsheet “LCTA Bus Stop Database of Conditions” and the locations highlighted in the “Task 2 Field” tab is integral for proposers to review and base your proposal on, as it outlines what specific improvements have been identified for each location. It outlines slope percentages as gathered during planning. • Proposers must include a month-by-month plan to accomplish the project and outline a realistic schedule to submit final, bid-ready design packages. Suggested project milestone schedule: o Data Gathering and Site Surveys o 30% design/submit Section 106 o 60% design/submit CE Worksheet o 90% Final Plans and Specs o Permits submitted & Bid packages
Project Approach and Experience • In addition to submitting a statement of work, proposers must answer the following items in their RFP response: ○ Please describe your firm’s experience with the PennDOT HOP process. ○ Please describe your firm’s experience (if any) submitting Section 106 and Categorical Exclusion documentation to the Department of Transportation (DOT), in this case specifically to Federal Transit Administration (FTA). ○ Please describe how your firm plans to avoid unnecessary delays and to work across different roadway types with different permitting requirements. ○ Please list your firm’s track record delivering bus stop, sidewalk, or streetscape designs on time and within budget. Transit experience is important but not prohibitive. ○ Please provide resumes and qualifications for project staff that would be assigned to the project.
Project Schedule: The timeline for full completion of the project is estimated at 6-8 months start to finish for Tasks 1 & 2.
Project Tasks ● Task 1: Deliverables (27 stop accessibility plans, delivered within 6-8 months): Design bid packages to fully support moving to construction, including necessary permitting applications drafted and entered into the EPS system for LCTA. ○ Simple improvements, such as single additions of concrete segments, entirely within existing right-of-way may be shown on a single aerial plan sheet, while more complex locations, such as stops without any current concrete conditions, may require full survey, grading plans, and site plans. ○ Drafting of PennDOT Highway Occupancy Permits (HOPs) for the state-route stops. Includes submitting PennDOT Highway Occupancy Permits (HOPs) in E-permitting (PennDOT EPS) and ongoing support until HOP is issued. ■ 16 stops need state HOP. The 16 stops on state roadways are expected to be submitted into PennDOT’s E-permitting system (EPS) on behalf of LCTA. LCTA has an active EPS account. LCTA does not assume any costs to submit HOPs—we are a municipal authority. ○ Task I Deliverable: 100% bid-ready design packages for the 27 bus stops. ● Task 2: Environmentals: Complete the Section 106 letter and categorical exclusion (CE) worksheet and all supporting information (in Appendix C) to achieve full compliance with FTA’s environmental regulation (23 CFR § 771.118). ○ Deliverable: Completed Section 106 letter and CE worksheet submitted to FTA Region 3 (completed and submitted after the Data Gathering and Site Surveys.)
Progress Meetings Five (5) project meetings (virtual is acceptable) are to occur at the completion of milestone design phases to update LCTA on the progress of the project.
Procurement Method and Basis of Award: In accordance with the Brooks Act (40 U.S.C. 1101-1104) and FTA Circular 4220.1F, Architectural and Engineering (A&E) services for Phase I of this project will be procured utilizing Qualification-Based Selection (QBS) procedures. Proposals will be evaluated and ranked solely on the technical qualifications and criteria. Proposers must submit technical qualifications and cost proposals in separate documents. Price will not be a factor in the initial evaluation or ranking of proposals. LCTA (the “Agency”) will open the cost proposal and enter into contract negotiations strictly with the highest-ranked, qualified firm. If a mutually satisfactory contract cannot be negotiated at a price determined by the Agency to be fair and reasonable, negotiations with that firm will be formally terminated, and negotiations will begin with the next highest-ranked firm.
Technical Scoring Project Approach & Sequencing Strategy (30 Points) PennDOT & Local Municipality Experience (25 Points) Qualifications & Technical Competence of Key Personnel (25 Points) Past Performance on Similar Transit Projects (20 Points)

More opportunities from Pennsylvania → Luzerne County

Same awarding agency

NAICS: 237990
SLED
REBID - Norfolk Southern Double Railroad Bore and Sanitary System Upgrade
Solicitation # 329326.000
Greater Hazleton CAN DO Inc. is soliciting sealed bids for the Norfolk Southern Double Railroad Bore and Sanitary System Upgrade Project in Hazle Township, Luzerne County, Pennsylvania. The scope of work encompasses all labor, materials, tools, oversight, and permits required for the installation of 24 inch PVC SDR-35 gravity sewer pipe and fittings, including approximately 294 linear feet of boring operations, tie-ins to existing Manhole 6, and the implementation of soil erosion and pollution control measures. Bids must be submitted online via the PennBid Program by 3:00 PM on October 30, 2026. The contract will be awarded to the lowest responsive and responsible bidder, with price serving as the primary evaluation factor. Bidders are required to provide a bid bond equal to 10 percent of the total bid amount from a corporate surety authorized to do business in Pennsylvania. Upon award, the successful contractor must furnish certificates of insurance, a performance bond, and a payment bond. Project performance is governed by PennDOT Publication 408 Specifications and various ASTM standards for concrete, mortar, and sewer piping. The contractor must submit a detailed work schedule within 30 days of the award, with no single task exceeding ten calendar days. Compliance with the Pennsylvania Human Relations Act No. 222 is mandatory, although the Pennsylvania Prevailing Wage Act is not required for this project.
Other Heavy and Civil Engineering Construction

POSTED

15 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS