Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 22, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP Amendment Utility Program (UP) Technical Support to U.S. Army IMCOM G-4 Public Works

Closed
W912DY-23-R-0026Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 15 hours ago

DEADLINE

in 14 days

General Info

Contract Value

$756,640.21

NAICS

541330 - Engineering Services

Place of Performance

AL, USA

Set-Aside

NONE

Award Issued Date

Documents

10

Amendment 0001 to Solicitation W912DY23R0026

PDF, High priority: read this firstamendment
High

RFQ 23R0026 Pricing Breakout Spreadsheet

XLSX, High priority: read this first2 pages · specifications
High

SCA Report Template

DOCX, High priority: read this first1 page · specifications
High

Small Business Participation Plan (Format)

PDF, High priority: read this firstsupporting-documents
High

Solicitation W912DY23R0026 - UP Technical Support IMCOM

PDF, High priority: read this firstrfp
High

W912DY23R0026 Amendment 0002 - IMCOM Utility Program Technical Support

PDF, High priority: read this firstamendment
High

Attachment 1 - Key Sub-Teaming Letter of Commitment

PDF, Low priority1 page · teaming-agreement-template
Low

Monthly Activity Report Template

DOCX, Low prioritytemplate
Low

Past Performance Questionnaire

PDF, Low priority4 pages · past-performance
Low

Trip Report Template

DOCX, Low priority1 page · template
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Aug 17, 2023 to Aug 24, 2023. The notice title changed.

Deadline changed

Response deadline changed from Aug 24, 2023 to Aug 30, 2023.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil
Contacts2 people available
OfficeREDSTONE ARSENAL, AL, 35898-0000, USA
Office AddressREDSTONE ARSENAL, AL, 35898-0000, USA

Full Description

Show more
UTILITY PROGRAM TECHNICAL SUPPORT: The contractor shall provide specialized Utility Program technical support to US Army Installation Management Command (IMCOM) G-4 Public Works Energy Division; work to be performed at the HQ IMCOM at Joint Base San Antonio (JBSA), IMCOM installations in CONUS, and at OCONUS locations as required. Effort includes Utilities Program management support services for Government Owned (GO) systems in the Utilities Privatization (UP) portfolio. Contractor shall perform Post-Award Contract Management support to include UP contracts administered by Defense Logistics Agency-Energy (DLA-Energy), Mission Installation Contracting Command (MICC), and Army Contracting Command (ACC). Effort will consist of a 12-month Base performance period, and a 12-month Option performance period. Effort includes evaluation of GO utility systems for input to the Army utility maintenance and management systems; to include the Installation Status Report - Infrastructure (ISR-I) and ISR - Mission Capability (ISR-MC), and the Utilities Sustainment Management System (SMS) under development. Support services include performing on-site Technical Assistance Visits (TAV) of UP utility systems as required to validate the Monthly System Performance Reports (MSPRs), and the verify system condition reports submitted by UP System Owners. Program Management support shall also include TAVs to conduct review and analysis of 5/10 Year Capital Investment Plans, maintenance management reports, and resiliency progress reports for GO systems. All work performed shall reflect thorough, professional, detailed knowledge of utility industry standards, alternative financing mechanisms (AFMs) laws and regulations, and UP policy and guidance, including but not limited to Congressional guidance and amendments of 10 U.S. Code (USC) 2688, 10 USC 2922a, 10 USC 2813, the National Defense Authorization Act (NDAA), Office of the Secretary of Defense (OSD) guidance, and applicable Army policies. Support will be provided under direction of the IMCOM G-4 Energy Division Chief within the Public Works Directorate. The Contractor shall also work closely with other staff and offices supporting the Army Utilities Program, the UP-Working Group, and the OSD UP Working Group Team. A member of the Energy Division of the US Army Engineering and Support Center, Huntsville (CEHNC) will act as the COR on this contract. The Contractor will provide support with Subject Matter Experts (SME) assigned on-site at JBSA (1 FTE) and off site (1 FTE), with significant knowledge of the utility management, Army utility management SME supporting other CONUS and OCONUS locations. Work will require a government issued computer and network access which will be provided by IMCOM. The computer will remain accountable to IMCOM but will be sub-hand receipted to the contractor for the performance of this contract via IMCOM's hand receipt method. Use of the computer and network access will only be allowed for the performance of this contract and the computer will not be removed from the Government's facility where it is located and utilized by the Contractor, unless otherwise provided for in this contract or approved by the Contracting Officer. Program management function includes associated support for program execution, such as meetings, teleconferences, support for or presentation of briefings, and tracking of milestones needed for timely program execution.

More opportunities from Department Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil

Same awarding agency

NAICS: 236220
Federal
HQ USMC Phase 2 Relocatables Progressive Design Build OTA
Solicitation # CEHNC-HQUSMC-10072026
The U.S. Army Corps of Engineers, through the Engineering and Support Center Huntsville, is initiating a competition for the HQ USMC Phase 2 Relocatables project. This effort utilizes a Progressive Design Build approach under 10 USC 2808a Other Transaction Authority for Construction. The project involves the design and construction of ICD 705-compliant Secured Working Areas (SWA) capable of dual accreditation in accordance with ICD/ICS 705, DoD 5200.1, and NSA 94-106. Key technical requirements include 100% Fiber-to-the-Desk infrastructure, STC 50 acoustic attenuation for all interior spaces, and rigorous RF shielding verified through third-party Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT). The scope encompasses a turnkey solution including civil site development, environmental mitigation, life safety, and comprehensive interior design. The total period of performance is 630 calendar days from the Notice to Proceed, with specific timelines requiring site adaptation within 100 days, assembly within one week of delivery, and final hookup and furniture installation within 40 days of delivery. Facilities must be manufactured at the vendor's secure location and delivered to designated project sites. Key personnel, including the Site Superintendent, Site Safety and Health Officer, and Quality Control Representative, must be U.S. citizens. The government will conduct an Industry Day on October 27, 2026, to provide further details on the acquisition strategy and requirements, with RSVPs required by October 23, 2026. Design deliverables are structured around sequential submissions at 65%, 95%, 100%, and Issued for Construction milestones.
Commercial and Institutional Building Construction

POSTED

13 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS