This Solicitation opportunity from Kansas was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
RFP - Backup Generator System Replacement - Gardner, KS
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Gardner, Kansas, is seeking a licensed contractor for the replacement of its outdated diesel backup generator system to ensure reliable emergency power for critical municipal facilities. The project requires a turnkey solution that includes the removal of the existing system and the installation of a new Caterpillar C13 generator and ASCO C300 automatic transfer switch, both of which will be provided by Foley Caterpillar. The selected contractor will be responsible for the full installation process, including testing and staff training. Interested respondents must attend a mandatory site visit at City Hall. Proposals must be submitted in a sealed envelope containing four printed copies and one digital copy via USB flash drive to the City Clerk. All submissions must be received by the deadline of November 18, 2025, at 3:00 PM to be considered eligible. Primary coordination for the project is handled by Building Maintenance Supervisor Pete Cappelatti.
General Info
Place of Performance
Gardner, KS, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (16)
See All 16 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Proposal Submittal Deadline: the above time
City of Gardner
City Clerk
120 E. Main St.
Gardner, KS 66030
Contact: Pete Cappelatti, Building Maintenance Supervisor
Phone: +1 (555) 000-0000
Email: contact@example.gov
A mandatory site visit will be conducted at the above time, at City Hall.
PURPOSE
The City of Gardner is seeking a licensed contractor to remove our existing diesel backup generator system and install a new Caterpillar C13 generator and ASCO C300 automatic transfer switch that the City will be purchasing from Foley Caterpillar.
GENERAL BACKGROUND
The City of Gardner relies on a diesel backup generator to provide emergency power to critical municipal facilities. The current system is outdated and due for replacement. This project will ensure reliable backup power through the installation of a new generator system, an automatic transfer switch, and supporting components. The City seeks a turnkey solution including removal, installation, testing, and staff training. Ensuring operational continuity during utility outages is a key objective of this replacement.
SUBMISSION INSTRUCTIONS
Respondents must submit four (4) printed copies and one (1) digital copy (USB flash drive) of the proposal no later than the above time. Any proposals received after 9:00 A.M. will be deemed ineligible. Please submit the proposal in a sealed envelope.
Submit proposals to:
Renee Rich
City Clerk
120 E. Main St
Gardner, KS 66030
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
