Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oregon was posted on May 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP for City of Detroit Water System Rehabilitation, Loan Administration, & Civil Engineering

Closed
S-Q10041-00016890State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 9 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Detroit, Oregon, has issued a solicitation (S-Q10041-00016890) for consulting services to design and potentially oversee the construction of an emergency potable water intertie between the neighboring communities of Detroit and Idanha, approximately five miles apart. The project scope involves installation of roughly 25,000 feet of new water main along Highway 22, modifications to existing pressure reducing valve stations, and construction of a new bidirectional pump station equipped with a flow meter to enable water transfer between the treated water reservoirs of both cities. The contract is divided into two phases: Phase 1, which is guaranteed and focuses on engineering design, feasibility, and detailed project documentation, and an optional Phase 2 for construction oversight that may be awarded to the Phase 1 proposer at the City's discretion. Deliverables must comply with federal and state regulations, including FEMA procurement standards, civil rights laws, and Oregon Workers’ Compensation rules. Proposals are evaluated through a best-value trade-off process emphasizing experience with grant administration and water system engineering (40%), familiarity with the City of Detroit (25%), references (15%), and understanding of the project and proposal quality (20% combined). Submissions are limited to hard copies only, with strict page limits and deadlines to promote clarity and conciseness. The City requires compliance with multiple statutes but does not mandate federal FAR clauses or explicit contract clauses; instead, it uses municipal RFP provisions and federal grant regulations. The contract value and pricing data are not disclosed, with negotiation expected post-selection. Contract administration details such as payment offices and technical representatives are not specified, though Michelle Connor, City Recorder, serves as the primary point of contact for proposal submission. The award process involves City Council approval, with anticipated contract commencement shortly after June 2026. The City reserves the right to award Phase 2 construction oversight solely to the winning Phase 1 proposer. No formal packaging, inspection protocols, or socioeconomic certifications are required, but proposals must meet public records laws and other standard administrative compliance mandates.

General Info

Detroit, Oregon seeks consulting for emergency water intertie design; two-phase contract with City approval.

Place of Performance

Detroit, OR, 97342, USA

Set-Aside

NONE

Documents

1

City of Detroit Water System Rehabilitation, Loan Administration, and Civil Engineering RFP

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → City Hall
Contacts1 person available
OfficeDetroit, OR, 97342, USA
Organization / AgencyOregon → City Hall
Office AddressDetroit, OR, 97342, USA
Contacts
Michelle ConnorPurchaser

Full Description

Show more
The project will construct an emergency potable water intertie between Detroit and Idanha. The two communities are located approximately five miles apart. The intertie would consist of approximately 25,000 feet of new water main installed along highway 22, alterations to existing pressure reducing valve stations, a new bidirectional pump station, and a bidirectional flow meter. Water should be able to be pumped back and forth between the treated water reservoirs for both Detroit and Idanha.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS