Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on January 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP for Material Testing and Deputy Inspection Services - University Student Union Renovation & Expansion

Closed
CSULBSOQ74State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Agency

Purchasing Office Department of California State University, Long BeachView Agency

NAICS

541380 - Testing Laboratories and ServicesView NAICS

Place of Performance

1250 Bellflower Blvd. MS 0123 Long Beach, California 90840, CA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Contract opportunity posted

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPurchasing Office Department of California State University, Long Beach
Contacts1 person available
OfficeCA, USA
Organization / Agency
Purchasing Office Department of California State University, Long Beach
View Agency Profile
Office AddressCA, USA
Contacts

Full Description

Show more
Scope: The office of Design & Construction Services is soliciting fee proposals for material testing and deputy inspection services for the University Student Union Renovation & Expansion Project.
Project Overview The project includes the renovation of 180,000 GSF of the existing University Student Union and a 50,000 GSF addition. The renovated space is a combination of 160,000 SF of indoor space and 20,000 SF of outdoor covered walkways and seating areas.
Schedule: • Construction Start: February 1, 2026 • Completion: May 15, 2028
Scope of Services The required material testing and deputy inspection services shall include, but are not limited to: 1. All required inspections per 2022 California Building Standards Code and project scope of work. 2. Visual inspection of concrete formwork, concrete testing, and reinforcement inspections. 3. Welding inspection for rebar (shop and site) and continuous inspection for placement of all reinforcing steel. 4. Onsite inspection and material testing for unit masonry assemblies, including preconstruction testing and pull test at wall anchors. 5. Inspection of field and shop welds, high strength bolt connections, non-destructive testing, inspection of all erection and identification of all structural steel. 6. Inspection of steel deck welding. 7. Inspection of sheathing and framing. 8. Inspection of all light-gage welding. 9. Inspection of full brick veneer installation. 10. Inspection of stairs and handrails connections (welds, bolts, etc.). 11. Pull test of approximately 10% of acoustical panel ceiling suspension wires. 12. Visual inspections for epoxy/drill in anchors. 13. Inspection of firestop penetrations and joints in accordance with 2022 CBC Section 1705.18. 14. Inspection of sprayed fire-resistive materials and intumescent fire-resistive materials. 15. Inspection and testing of roof top fall arrest anchors in accordance with CalOSHA and other applicable AHJ requirements. Provide unit cost per anchor. 16. Inspection of high-performance coating, of a representative area, on building exterior to confirm dry and wet film thicknesses. 17. Inspection of Fiber Reinforced Polymer (FRP) diaphragm strengthening and associated fire proofing in the existing USU building. 18. Inspection of shoring and lagging system. 19. Laboratory testing as required for reporting preparation. 20. Written daily field reports for each day of inspection and testing. 21. Written reports from in-house engineers as requested by the University. 22. Inclusion of all administrative fees in the proposal. 23. Note: Geotechnical scope of work is not included in this RFP.
Notes: THIS IS AN ADVERTISEMENT ONLY
Access to Documents Plans and specifications are available upon request. Email Lisa.Salgado@csulb.edu to obtain file access to construction documents.
Submission & Contact Information Email proposal to: Lisa.Salgado@csulb.edu Or deliver/mail to: California State University, Long Beach Office of Design and Construction 1331 Palo Verde Ave. Long Beach, CA 90815 Attn: Lisa Salgado
For questions, please contact: Lisa Salgado Phone: (562) 985-1467 Email: Lisa.Salgado@csulb.edu