Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on August 1, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP - Greenhouse Design and Installation for Highland High School

Closed
TB2622-GHHState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

31 minutes ago

DEADLINE

in 4 days
NAICS: 238160
New
SLED
47971 CONSTRUCTION
Solicitation # 47971 - C
Solicitation 47971-C is a construction project issued by the New York State OGS Design and Construction for the replacement of the roof and associated mechanical systems at the Troop F Headquarters in Middletown, New York. The scope of work encompasses comprehensive architectural, electrical, and structural modifications, including the removal of specific skylights and roof framing, the application of various waterproof and general surface finishes, and abatement work related to the first-floor reflected ceiling plan. Electrical requirements include the installation of keyed systems, the relocation of equipment for HVAC engineers, and the installation of permanent conductive fiber optic cables. The contractor is responsible for providing all necessary tools, equipment, and materials, as well as procuring all permits required for the final certificate of occupancy. All work must adhere to applicable building codes, local safety and zone differential regulations, and manufacturer recommendations. Key deliverables include the final inspection of roof trusses, sheathing, tiles, gutters, downspouts, and storm drainage systems, with final acceptance of the fastening system requiring written approval from the Owner and Architect. The solicitation was posted on October 16, 2026, with a response deadline of November 18, 2026.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 3 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Salt Lake City School District is seeking qualified vendors to design and install a new greenhouse at Highland High School in Salt Lake City, Utah, to support the Bio Agriculture academic program. The project will coincide with the construction of a new high school building replacing the existing Highland High School on the same site. Interested vendors must submit their proposals through the Bonfire system, adhering strictly to the specified format and including all required information as outlined in the main RFP document and associated attachments. All questions regarding the solicitation must be directed through Bonfire, and any modifications or clarifications will be issued via official addenda from the district’s Purchasing Department, which will be the sole authoritative source for official communications. Proposals will be evaluated based on criteria detailed in the evaluation scoresheet, and responses must be submitted securely through Bonfire by the deadline of August 18, 2025. The contract value is estimated to range between $500,000 and $1,500,000. The solicitation includes several attachments covering terms, conditions, scope of work, and evaluation procedures, emphasizing the importance of reviewing these documents thoroughly. The project aims to ensure a compliant, well-documented process for the design and installation of the greenhouse, integral to the educational program at Highland High School.

General Info

Place of Performance

UT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah → Salt Lake City School District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Salt Lake City School District is soliciting qualified greenhouse vendors for design and installation of a new greenhouse located at Highland High School in Salt Lake City. The greenhouse will be used for the Bio Agriculture academic program. It will be constructed in conjunction with the new high school (which will replace the existing Highland High School on the same site). You are instructed to pay special attention to the RFP language regarding the information to be submitted with your proposal and the format of that information. Evaluation of the proposals received will be in accordance with the evaluation criteria contained herein. ALL questions concerning this solicitation MUST be submitted through the Bonfire system. Only answers issued through the Bonfire system or issued via an authorized and properly issued addendum shall be the official position of the Salt Lake City School District (SLCSD). Any modification to this procurement effort shall be made by addendum issued by the SLCSD Purchasing Department. Only authorized and properly issued addenda shall constitute the official position of the SLCSD and shall be binding. Anyone submitting a response to this solicitation, with basis in or other communication or information received from sources other than through official addendum, assumes full risk including the possibility of a determination of non-responsiveness and may be rejected at the sole discretion of the SLCSD. Responses submitted in Bonfire are completely secure. NO ONE can see them until after the solicitation deadline. Therefore, you do not have to wait until the last minute to submit; and you may change your submission any time until the solicitation closes. If you have not completed the submission by the deadline, Periscope will reject your submission. Please plan well.
A list of attachments is included below. For details on terms and conditions, specifications, scope of work, and other VERY IMPORTANT information, please see documents: Main RFP Document - Greenhouse Design and Installation for Highland High Attachment A - Standard Terms and Conditions Attachment B - Solicitation General Provisions Attachment C - Claim of Business Confidentiality Form Attachment D - Highland High - Level 2 Plans Attachment E - RFP Evaluation Scoresheet Attachment F - Price Proposal Form

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS