Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

RFP - Trout River Floodplain Restoration Final Design

Active
73965State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

N/A

Place of Performance

VT, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, US
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressVT, US

Full Description

Show more
The Franklin County Natural Resources Conservation District (FCNRCD) seeks proposals from engineering consultants regarding final design along the Trout River floodplain in Montgomery, VT, as part of the Final Design phase of a proposed floodplain restoration project overseen by FCNRCD; this project involves 3 distinct sites with 5 different landowners.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 237310
New
SLED
Aluminum Ornamental Fence InstallationThe Town of Milton is soliciting proposals for the supply and installation of approximately 704 linear feet of black aluminum ornamental fencing along the road frontage of St. Ann’s Cemetery at the corner of Middle Road and Railroad Street. This project replaces a fenceline reconfigured during the Hourglass Project and must conform to the Town’s unified development regulations. The fence is to be 54 inches high with a three-rail, flush bottom design in black, and must include two 10-foot and two 14-foot recessed double drive gates. Proposers must provide distinct pricing for two gate style options: flat top, flush bottom gates matching the fence, and estate style gates consistent with existing cemetery fencing in Milton. The existing overhead entrance sign at the cemetery must be preserved and integrated into the new fence and gate system. All aspects of the project, including labor, materials, equipment, site preparation, and restoration, must be fully covered in the proposal. The project must be completed by October 31, 2026, with an anticipated start as soon as possible after award. Proposals are due by August 7, 2026, and must align with the Town’s Purchasing Policy and Procedures #FI413.067. The solicitation, numbered 73962, is issued by the Department of Economic Development under the state of Vermont and is accessible via the Vermont Business Registry. Questions and communications should be directed to Christopher Taylor at ctaylor@miltonvt.gov or 802-893-6655. All work must be performed on-site at the specified location in Milton, Vermont, with no set-aside provisions specified.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 541611
New
SLED
Owner's Rep/Construction ManagerThe Town of Hardwick is soliciting proposals to engage a qualified Owner’s Representative or Construction Manager to oversee the Utility Elevation Assistance Program, a project funded by the State of Vermont’s Community Resilience and Disaster Mitigation Fund. The initiative aims to elevate or relocate critical utilities on approximately eleven residential properties to protect them from flood damage by raising them above the Base Flood Elevation. The selected consultant will act as the Town’s direct representative throughout the construction phase, ensuring all work adheres to project specifications, safety standards, and regulatory requirements while coordinating between contractors, property owners, and town officials to maintain efficiency and compliance. Proposals must be submitted by August 10, 2026, and the solicitation is issued under number 73961 by the Vermont Department of Economic Development. The project is led by the Town of Hardwick, with primary coordination handled by the Zoning Administrator, reachable via email and phone provided in the solicitation. Performance will occur within the Town of Hardwick, Vermont, and the consultant must possess the expertise to manage multiple residential utility elevation projects simultaneously. The role demands strong project oversight, communication skills, and familiarity with flood mitigation practices and state-funded program guidelines.
Administrative Management and General Management Consulting Services

POSTED

1 day ago

DEADLINE

in 23 days
View Details