This Solicitation opportunity from Texas was posted on April 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Harris County is soliciting proposals for turn-key maintenance, repair, and replacement services for the Harris County Sheriff’s Office jail facilities, including multiple locations such as 1200 Baker Street and 700 North San Jacinto. The scope of work encompasses comprehensive facility maintenance, 24/7 operational support, and the management of a Service Response Center to handle work requests and preventive maintenance. Key technical requirements include adherence to TCJS and NFPA standards, specific lighting and HVAC maintenance protocols, and the provision of qualified personnel such as stationary engineers, electricians, and plumbers. Contractors must also comply with the Prison Rape Elimination Act (PREA) and undergo background checks for CJIS access.
The contract is awarded based on a best-value trade-off process, with evaluation weights split between qualifications and experience (30%), pricing (30%), technical capability (25%), responsiveness (10%), and references (5%). Bidders must meet a 7.74% M/WBE participation goal and adhere to a minimum wage floor of $21.65 per hour for contract workers. Mandatory requirements include a pre-proposal conference on May 4, 2026, and the submission of comprehensive insurance coverage for general liability, workers compensation, and professional liability. Proposals must be submitted via the Bonfire portal by June 1, 2026, following a strict six-section format.
General Info
Harris County seeks turn-key maintenance services for Sheriff Office jails by June 1, 2026.
HighAI Summary for 2026 Building Information Sheet - CPI-U Price Adjustment: This document outlines the methodology for calculating price adjustments for contract renewals based on the Consumer Price Index of All Consumers (CPI-U) for Houston, Texas. It details the process of averaging inflationary/deflationary effects over six twelve-month periods to determine renewal pricing.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for 2026 Kitchen and Laundry Equipment List By Location: A solicitation document from Harris County for kitchen and laundry equipment. It outlines general requirements, including access to records, ACH payment, award criteria based on 'lowest and best offer', bonding requirements, and mandatory certifications such as Form 1295 and federal debarment compliance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 2026 Prevailing Wages - Insurance Requirements: This document outlines the minimum commercial insurance requirements for contractors working with Harris County, Texas. It specifies required coverage limits for Workers Compensation, Commercial General Liability, Automobile Liability, Umbrella/Excess Liability, and Professional Liability. It also details requirements for additional insured status, A.M. Best ratings, and notice periods for policy changes.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 2026 Work Request Flow Chart: A technical document outlining the work request process and flow between HCSO and the FMI Facilities Center. It specifies requirements for the vendor to establish a Service Response Center, manage preventive maintenance, provide technical support/software, and conduct quality control on 20% of requests.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 - 250348: M/WBE Trucking Procedure Compliance: Addendum No. 1 for solicitation 250348 from the Harris County Department of Economic Equity and Opportunity (DEEO). It outlines the Commercially Useful Function (CUF) requirements for M/WBE trucking firms, including ownership, operation, and leasing rules to receive participation credit. It also details the required submittal documentation and the process for courtesy review of Utilization Plans.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Harris County Minimum Wage Policy for Contract Workers: This policy establishes a minimum wage floor for workers on contracts solicited by Harris County, Texas. Effective for contracts solicited on or after July 1, 2025, the initial rate is set at $21.65 per hour, with annual adjustments based on the MIT Living Wage Calculator. The document defines applicable staff, lists exempt contract types (e.g., sole source, emergency, or those under $50,000/year), and outlines administration by the Purchasing Department.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris County Project 250348 M/WBE Goal Participation: This document outlines the Minority- and Woman-Owned Business Enterprise (M/WBE) goal participation requirements for a Harris County project. It establishes a 7.74% participation goal, details the required M/WBE Utilization Plan and Commitment Form, lists accepted certifications, and defines the criteria for 'Significant Local Presence' and 'Commercially Useful Function' to ensure valid goal credit.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Harris County RFP Vendor Instructions: This document outlines the submission requirements and evaluation process for a Harris County Request for Proposal (RFP). It specifies a six-section response format including a transmittal letter, scope of services, pricing, qualifications, legal documents, and miscellaneous items. It also details the evaluation process, confidentiality rules under the Public Information Act, and communication protocols via Harris County Purchasing.
PDF
PDF, High priority: read this firstsow
HighAI Summary for HCSO Turn-Key Maintenance, Repair and Replacement Services Specifications: This document outlines the technical specifications and scope of work for turn-key maintenance, repair, and replacement services for Harris County Sheriff's Office jail facilities. It includes details on a mandatory pre-proposal conference (May 4, 2026), renewal options, vendor liabilities for major repairs, and guidelines for handling vandalism repairs.
PDF
PDF, High priority: read this firstutilization-plan
HighAI Summary for M/WBE Utilization Commitment and Plan Form: This document is the Minority- and Woman-Owned Business Enterprise (M/WBE) Utilization Commitment Form and Utilization Plan for a procurement project. It includes sections for bidders to commit to M/WBE participation goals, submit Letters of Intent for subcontractors, and document Good Faith Efforts if goals are not met. The form requires detailed information about the prime company and M/WBE subcontractors, including certification status, contact details, and percentage of contract value. It also contains instructions and tips for compliance with Harris County M/WBE policies. The document is intended to be submitted with bids to demonstrate compliance with M/WBE participation requirements and becomes part of the contract upon award.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for TX Harris County Building Construction Prevailing Wage Determination 2026: This document is the General Decision Number TX20260253 dated January 2, 2026, for prevailing wage rates applicable to building construction projects in Harris County, Texas. It supersedes the previous decision TX20250253. The document lists wage rates and fringe benefits for various construction trades such as asbestos workers, boilermakers, carpenters, electricians, elevator mechanics, and many others. It includes footnotes on wage adjustments based on experience and holidays, and mandates compliance with Harris County's Minimum Wage Policy. The document also references Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements for federal contractors. The wage rates are detailed for union and survey classifications relevant to the construction type and geographic area.
PDF
PDF, Low priority1 page · other
LowAI Summary for 2026 Adult Detention Work Task Request Flow Chart: A process flow chart detailing the work task request cycle for Adult Detention, outlining the steps from the initial HCSO ELOG request through vendor assessment for vandalism and final close-out by FMI.
PDF
PDF, Low prioritybuilding-information-sheet
LowAI Summary for 2026 Building Information Sheet - Houston Jail Facilities: This document provides detailed building information for multiple jail facilities located in Houston, TX, including 701 & 711 North San Jacinto, 1200 Baker Street, 1307 Baker Street, 700 North San Jacinto, and 1201 Commerce Street. It lists gross square footage, bed counts per floor, and special notes such as the presence of commercial kitchens, laundries, inmate medical clinics, jail tunnels, parking garages, loading docks, and Sally Ports. The document serves as a reference for the physical and functional characteristics of these correctional buildings.
PDF
PDF, Low priorityequipment-list
LowAI Summary for 2026 Kitchen and Laundry Equipment List by Location: This document is a detailed list of kitchen and laundry equipment categorized by location for the year 2026. It includes quantities of various appliances such as ice machines, dishwashers, disposals, ovens, washers, dryers, and other related equipment for multiple addresses including 1200 Baker Street, 1307 Baker Street, 701 N. San Jacinto, and 700 N. San Jacinto. The list is organized in a tabular format showing equipment types and their quantities per location.
PDF
PDF, Low prioritystaffing-definitions
LowAI Summary for 2026 Staffing Definitions for Building Engineering and Maintenance Roles: This document provides detailed staffing definitions for various building engineering and maintenance roles including Stationary Engineer Technician, Maintenance Mechanic I, II, III, General Maintenance Worker, Electrician, Plumber, and Painter. It outlines required certifications, licenses, years of experience, and key responsibilities for each position. The document serves as a reference for qualifications and duties related to repair, maintenance, and operation of commercial and industrial facilities. It is intended to support staffing and contract management decisions for facility maintenance services.
PDF
PDF, Low priority1 page · supporting-document
LowAI Summary for General Requirements for Proposals - Tax Form/Debt/Residence Certification: A certification form for bidders submitting proposals for advertised projects in Harris County, Texas. The document collects the Taxpayer Identification Number, business registration status, property ownership within Harris County, disclosure of debts owed to the county, and residence certification per Texas Government Code §2252.001.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for Harris County M/WBE Trucking Procedure Compliance Guidance: This document from the Harris County Department of Economic Equity and Opportunity outlines the procedures and compliance requirements for M/WBE trucking firms to ensure Commercially Useful Function (CUF). It details responsibilities such as ownership and operation of trucks, exclusive use and control, subcontracting rules, leasing conditions, and required submittal documentation including W-9, insurance, and proof of ownership. The document also provides instructions for courtesy review requests of Utilization Plans prior to solicitation closure, emphasizing documentation completeness and submission protocols. Contact information and a website link for the M/WBE Program Policy are included for further reference.
PDF
PDF, Low priorityother
LowAI Summary for Harris County Sheriff's Office Personal Inquiry Waiver: A background check authorization and release of information form for individuals applying for contract or intern positions with the Harris County Sheriff's Office, specifically regarding suitability for CJIS access.
PDF
PDF, Low priorityother
LowAI Summary for HCSO PREA Contractor and Volunteer Acknowledgement Form: A compliance document from the Harris County Sheriff's Office requiring contractors and volunteers to acknowledge the Prison Rape Elimination Act of 2003 (PREA) policies, zero tolerance for sexual abuse, and mandatory reporting requirements.
PDF
PDF, Low prioritysupporting-document
LowAI Summary for RFP Acknowledgement Form: A standard RFP Acknowledgement form requiring a signature from a corporate officer to certify that the proposal is submitted without collusion and that the bidder agrees to all terms and conditions of the solicitation.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.