Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on August 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFQ-484-091525 Construction Engineering and Inspection (CEI) Services for District 7 - I-285

Closed
PE-48401-RFQ-2026-000000419State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 13 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves providing Construction Engineering and Inspection (CEI) services along the I-285 corridor in District 7 of Metro Atlanta, covering Fulton and Cobb Counties. The scope includes contract administration, inspection, and materials sampling/testing for various project types such as new construction, widening, reconstruction, pavement rehabilitation, bridge replacement, safety, and resurfacing, with some inspections requiring night or weekend work. The work is performed at project sites within the specified corridor, with deliverables including inspection reports, sampling/test results, and administrative records, all adhering to GDOT standards and procedures. The contract emphasizes compliance with federal and state laws, including FHWA participation, and mandates quality control, inspector training, and resource management. It is structured as a multi-phase, project-specific agreement with flexible payment options (lump sum, cost-plus, or unit rates), to be negotiated after selection. The procurement process uses a qualifications-based, best-value trade-off approach, with a two-phase evaluation: initial qualification review focusing on personnel experience, resources, and past performance (weighted at 30%, 20%, and 10%, respectively), followed by a technical approach and past performance assessment (weighted at 40% and incorporated into overall scoring). The selection committee scores proposals numerically, ranks firms, and negotiates contracts with the top-ranked firm, with debriefings provided to all respondents. The RFQ, issued on August 15, 2025, closes on September 15, 2025, and the contract is awarded to the most qualified firm based on comprehensive evaluation criteria. The contract does not specify explicit FAR clauses but incorporates federal and state regulations, including cost principles under 48 CFR Part 31, DBE and EEO requirements, debarment certifications, and audit compliance. It mandates that all services conform to GDOT standards, with detailed personnel qualifications, conflict of interest disclosures, and certifications required from proposers. Submittal instructions specify a single electronic PDF upload via GDOT’s portal, with strict adherence to page limits, formatting, and submission deadlines. The agreement emphasizes confidentiality, proper labeling, and the delivery of all project records upon completion, with no explicit physical packaging or bar-coding requirements. Overall, the contract establishes a comprehensive framework for qualified firms to deliver high-quality CEI services under federal and state oversight, ensuring project compliance, transparency, and accountability.

General Info

Place of Performance

GA, USA

Set-Aside

NONE

Documents

1

RFQ for Construction Engineering and Inspection Services on I-285 in Fulton and Cobb Counties

PDF, High priority: read this first34 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 48401 TRANSPORTATION-2, PE-48401-RFQ-2026-000000419 to PE-48401-RFQ-2026-000000419.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia Department of Transportation-2
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The Consultant shall provide Construction Engineering and Inspection (CEI) Services for projects along I-285 corridor in District Seven (7) ¿ Metro Atlanta, which are required for contract administration, inspection, and materials sampling and testing for the construction projects assigned to the Metro Atlanta District Office. Some of the projects will require night and weekend inspection. The project types may include new construction, widening and reconstruction, rehabilitation of asphalt and concrete pavement, bridge replacement, safety and resurfacing. Projects may include Various work types of projects including Safety, Interchange Construction, Ramp Construction, Realignment, Grade Separation, Widening and/or New Construction but is not limited to a type of work and some projects may be excluded from the I-285 corridor: (PI 0018191, 0018192 & 0018193).

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS