Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

RFQ 484-110926 CEI Services for US 278 Grade Separation over CSX Railroad

Active
PE-48401-RFQ-2027-000000630State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Georgia Department of Transportation (GDOT) is soliciting qualifications under RFQ 484-110926 for 100% frontline Construction Engineering Inspection (CEI) services for the US 278 Grade Separation over CSX Railroad project in Walton County. The selected consultant will be responsible for comprehensive contract administration, construction inspection, quality assurance, materials sampling and testing, and general contract compliance. Key deliverables include continuous observation of work to ensure conformity with project plans, precise quantity tracking of materials, and the maintenance of detailed project documentation. All services must adhere to GDOT standards, including the Construction Manual and the Bridge, Culvert, and Retaining Wall Construction Manual. This is a multi-phase, project-specific contract where the final scope and costs will be negotiated through individual task orders, which may be structured as lump sum, cost plus fixed fee, cost per unit of work, or a specific rate of compensation. The selection process consists of two phases: an initial Statement of Qualifications and a subsequent Technical Approach for shortlisted firms. Evaluation is heavily weighted toward the experience and qualifications of the Project Manager and Key Team Leaders (30%), the firm's approach to resources and challenges (20%), and the prime consultant's past performance (10%). Contractors must provide personnel meeting specific education and experience requirements in bridge construction inspection and must supply vehicles equipped with necessary safety gear and communication devices. Required administrative submissions include a notarized Certification Form and a Georgia Security and Immigration Compliance Act Affidavit. The procurement process is managed through a digital portal with a response deadline of November 9, 2026, requiring submissions in PDF format following strict naming conventions and page limits.

General Info

GDOT seeks qualified consultants for construction engineering inspection services in Walton County.

Place of Performance

GA, USA

Set-Aside

NONE

Documents

3

RFQ 484-110926 CEI Services for US 278 Grade Separation over CSX Railroad

PDF, High priority: read this firstrfq
High

LAP Evaluation Form

XLSX, Low priorityevaluation-form
Low

Local Project Evaluation Form

XLSX, Low priorityevaluation-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Department of Transportation-2
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Construction Engineering Inspection (CEI) Services for US 278 Grade Separation over CSX Railroad

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
International
Fire Hydrant Flow Testing and Hydraulic Modelling Services
Solicitation # WS-RFP-26-077
The Town of Whitchurch-Stouffville is soliciting bid proposals under solicitation number WS-RFP-26-077 for Fire Hydrant Flow Testing and Hydraulic Modelling Services. The project involves a multi-year engagement focused on annual flow monitoring and hydrant testing across Stouffville, Ballantrae, and Gormley. Key technical requirements include the installation and rotation of six continuous pressure monitors, quarterly data analysis and quality assurance from years one through five, and the final removal of equipment in year five. All field testing must adhere to the AWWA M17 manual, and any work performed on rights-of-way must comply with the Ministry of Transportation Book 7 of the Ontario Traffic Manual. The contract will be awarded to the proponent achieving the highest total score, with the lowest bid price receiving full points for the pricing component. Qualified proponents must be legally operating in Ontario and provide a project team led by a dedicated Project Manager, with all work performed by Ontario licensed trade personnel. Mandatory insurance requirements include a minimum of 2 million dollars for both automobile and professional liability coverage, with the latter remaining in force for 24 months post-completion. Payments will be processed via Electronic Funds Transfer within 28 days of approved invoice receipt. Proposals must be submitted electronically through the Bids and Tenders portal by November 2, 2026, at 3:00 p.m. local time.
Town of Whitchurch-Stouffville

POSTED

about 11 hours ago

DEADLINE

in 25 days
View Details
NAICS: 541330
New
SLED
Professional Engineering Services Lincoln Street Complete Streets Project
Solicitation # 26-09-02
The City of Oroville Public Works Department is soliciting proposals for professional engineering services for the Lincoln Street Complete Streets Project in Oroville, California. The scope of work requires a full-service team to manage the Project Approval and Environmental Document phase, Right-of-Way acquisition, Plans, Specifications and Estimates, and provide support during bidding and construction. Key technical requirements include civil and traffic engineering, environmental services, landscape architecture, topographic and boundary surveys, and modern roundabout design. The project must maintain Federal-Aid compliance, with Right-of-Way services adhering to Caltrans LAPM Chapter 13 and utility coordination following Caltrans guidelines. The City has currently secured 1.5 million dollars in Congestion Mitigation and Air Quality funds to initiate the first phase. Qualified proposers must have at least ten years of experience providing similar services in northern California and a proven track record with local agencies. Key discipline leads must hold appropriate professional licenses, and the firm must be registered with the Department of Industrial Relations. Proposals are due by 4:00 PM PDT on October 29, 2026, and must include three spiral-bound hard copies and one PDF copy on a USB drive. Award selection is based on a weighted scoring system, with the City negotiating with the highest-ranked qualified consultant. Successful contractors will be required to provide monthly progress reports and detailed invoices tracking tasks, contract balances, and reimbursable expenses. The target date for contract execution is December 1, 2026.
City of Oroville Public Works Department

POSTED

about 11 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541330
New
SLED
Construction Management, Inspections, And Materials Testing For Tuolumne Boulevard Pavement Rehabilitation
Solicitation # 2026-01
The City of Modesto is soliciting proposals under RFP/RFQ 2026-01 for construction management, inspections, and materials testing services for the Tuolumne Boulevard Pavement Rehabilitation project in Modesto, California. The selected consultant will be responsible for full-service construction coordination, site inspection, time-lapse camera services, and the oversight of ADA-compliant curb installation. A critical requirement is that the materials tester provided by the consultant must be independent and cannot be the same entity used for the contractor's quality control testing. The anticipated project timeline includes opening bids on October 20, 2026, with a construction contract award in December 2026 and a notice to proceed in January 2026. Proposals must be submitted via the OpenGov Procurement portal by October 20, 2026, at 11:00 am. Submissions must be split into a main technical proposal and a separate cost file, as the City will only open pricing after evaluating qualifications to negotiate with the top-ranking firm. Evaluation is based on a points-based system, with priority given to qualified local firms. The top three firms may be invited for interviews. Awarded consultants must maintain minimum insurance coverage of $1,000,000 for commercial general liability, automobile liability, and employer's liability, and must adhere to California Labor Code prevailing wage requirements for public works. Administration involves monthly detailed invoicing, with the City Manager authorized to approve additional services up to 10% of the maximum compensation.
City of Modesto

POSTED

about 11 hours ago

DEADLINE

in 12 days
View Details
NAICS: 541330
New
SLED
LIFT STATION 47 REDUNDANT FORCE MAIN CONSTRUCTION ADMINISTRATION & INSPECTION SERVICES
Solicitation # WS90501000
The City of Phoenix, through the Office of the City Engineer, is seeking a qualified consultant team to provide construction administration and inspection services for the Lift Station 47 Redundant Force Main project. The scope of work involves the construction of a new 12-inch high density polyethylene redundant force main approximately 9,480 linear feet in length, extending from the lift station at 4102 West 113th Drive to 99th Avenue and Indian School Road. Key responsibilities include the reconfiguration of the lift station discharge header, coordination of utility relocations, documentation review of assessment reports and CCTV recordings, and performing field inspections to ensure work conforms to construction documents. The consultant must maintain pipe fusion records, evaluate quality control testing, and prepare a final punch list of corrective work. Selection will be conducted via a qualifications-based process where a Selection Panel evaluates Statements of Qualifications (SOQ) without formal interviews. The evaluation is based on a 1,000-point scale for the SOQ, with additional points awarded through reference checks. Interested firms must be registered in the City's Vendor Management System and submit a single PDF SOQ of no more than 10 pages by 12:00 pm Phoenix time on October 30, 2026. Technical requirements include the potential use of the UNIFIER project management database and the maintenance of all project records in electronic format. While the estimated construction cost for the project is 7.9 million dollars, the specific value for the administration and inspection services is not provided.
Design and Construction Procurement

POSTED

about 11 hours ago

DEADLINE

in 22 days
View Details

More opportunities from Georgia → Department of Transportation-2

Same awarding agency

NAICS: 541330
New
SLED
PNA 484-111626 ICE in Support of ADP
Solicitation # PNA 484-111626
The Georgia Department of Transportation Public-Private Partnership Division is seeking qualified consultants under solicitation PNA 484-111626 to provide Independent Cost Estimating services for Alternative Delivery programs, including major P3, DB, and CM/GC projects. The selected consultant will serve as an independent advisor responsible for developing contractor-style, production-based, bottom-up cost estimates and construction schedules. Key deliverables include independent quantity take-offs, evaluation of construction means and methods, project risk assessment and pricing, constructability and value engineering support, and commercial negotiation support. This is a presolicitation notice posted on October 7, 2026, with the formal Request for Qualifications expected on October 16, 2026, and a Statement of Qualifications deadline of November 16, 2026. Firms will be evaluated based on their demonstrated qualifications, relevant experience, and ability to perform the services. To broaden competition and attract specialized expertise, no GDOT prequalification Area Classes are required. The anticipated project team should include an ICE Principal, Project Manager, Lead Estimator, Discipline-Specific Estimators, and a Scheduler. The primary point of contact for this effort is Curtis Scott within the Office of Procurement, Engineering and Design Services.
Engineering Services

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS