RFQ Engineering Services – US 19E Water Distribution Line Project

Closed
724-S.2026.02State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

26 minutes ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

26 minutes ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station featuring a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes from various trades, including SWPPP, survey, aggregates, demolition, paving, precast concrete, masonry, metals, coatings, process equipment, fire suppression, piping, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids are due by 2:00 PM on October 29, 2025. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

26 minutes ago

DEADLINE

in about 11 hours

AI Contract Overview

Show more

The Town of Burnsville is requesting statements of qualifications from qualified firms to provide engineering, planning, and construction inspection services for a multi-faceted water infrastructure project along US 19E. The project entails three main components: relocating the town’s primary water distribution line to the highway shoulder, developing two new water supply wells to serve as backup sources alongside the existing surface water supply, and constructing a 300,000-gallon ground-level water storage tank. These improvements aim to enhance the reliability and resilience of the town’s water supply system. The solicitation, titled "RFQ Engineering Services – US 19E Water Distribution Line Project," was posted on April 9, 2026, with responses due by May 15, 2026. The Town of Burnsville, located in North Carolina, is managing this project and has designated Chad Fox as the primary point of contact. The selected firm will be responsible for comprehensive services encompassing all phases of the project, from initial planning through construction oversight. This effort underscores the town’s commitment to infrastructure modernization and improved water resource management.

General Info

Town of Burnsville seeks firms for engineering and inspection of US 19E water infrastructure project.

Documents

1

Town of Burnsville RFQ - Engineering Drinking Water (SRF-D-HEL-0019)

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → Town of Burnsville
Contacts1 person available
OfficeNC, USA
Office AddressNC, USA
Contacts
Chad Fox

Full Description

Show more
The Town of Burnsville seeks statements of qualifications from firms capable of providing engineering, planning, and construction inspection services. 1. The first component involves relocating the Town’s main water distribution line along US 19E to the shoulder of the highway. 2. The second component of the project includes the development of two new water supply wells, which will serve as a redundant water source to supplement the Town’s existing surface water supply. 3. The third component involves constructing a 300,000-gallon ground-level storage tank.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS