This Solicitation opportunity from Florida was posted on December 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this first16 pages · specifications
HighAI Summary for 087100 EOS Door Hardware Specification: This document is a specification section for mechanical and electrified door hardware for swinging doors, identified as 087100 EOS Door Hardware Specification. It includes general provisions, references to standards such as UL, DHI, ANSI, and Florida Building Codes, and detailed submittal requirements including product data, wiring diagrams, samples, hardware schedules, key schedules, templates, and certifications. The document outlines quality assurance, product substitution rules, and closeout submittals like operations and maintenance data. It serves as a technical guide for compliance, installation, and coordination of door hardware in construction projects.
PDF
PDF, High priority: read this firstrecord-drawings
HighAI Summary for 1992-05 Record Drawings for Ridge Manor WRF Lift Stations & Force Main: This document contains the record drawings for the Hernando County Water & Sewer District Ridge Manor West Subregional Wastewater Treatment Plant, including lift stations and force mains. It includes location maps, agency approvals, design engineer certification, hydraulic profiles, structural details such as column, beam, and footing schedules, foundation plans, gate and frame specifications, and control panel layouts. The drawings certify all significant changes and additions approved during construction, reflecting the final as-built conditions. The document is dated 1992-05 and serves as a comprehensive technical reference for the constructed wastewater treatment facility components.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for Addendum 5 Ridge Manor Water Reclamation FP-110 R24: This document is Addendum #5 dated 01/09/2026 for the Ridge Manor Water Reclamation Facility Expansion and Emergency Operations Structure project. It includes fire protection sprinkler system design criteria, area classifications, and notes on automatic sprinkler system requirements per NFPA 13. The addendum references permit/bid set revisions and clarifies fire sprinkler intent and contractor responsibilities for final piping layout and hydraulic calculations. It serves as an update to previous design packages dated 02/18/2025, 05/27/2025, and 08/29/2025.
PDF
PDF, High priority: read this first1 page · bid-document
HighAI Summary for Alternate Bid Item A.3 Sheet for Ridge Manor WRF Project: This document is an alternate bid item sheet labeled A.3 for the Ridge Manor Water Reclamation Facility (WRF) and Emergency Operations Structure (EOS) project in Hernando County. It includes detailed engineering drawings and bid information prepared by Brian M. Lamberg Professional Engineering Associates, Inc., with a 90% package date of July 8, 2025. The document contains graphic scales, legends, and revision dates relevant to the bid process for this construction project.
PDF
PDF, High priority: read this first4 pages · bid-form
HighAI Summary for Bid Form for Ridge Manor WRF & EOS Expansion: This document is a bid form for the Ridge Manor Wastewater Reclamation Facility (WRF) and Emergency Operations Structure (EOS) expansion project. It includes a detailed list of bid items with descriptions, units, estimated quantities, and placeholders for bid unit prices and total bid prices. The bid form covers lump-sum items such as mobilization, construction of various facility components, demolition, wildlife survey, and upgrades, as well as unit price items like soil stabilization, sodding, paving, and utility locates. It also includes allowances for quality control testing, record drawings, and temporary systems, along with an additive bid alternate for an additional sludge tank and site fill haul. The form is structured to capture comprehensive pricing for the base bid and alternates, facilitating contractor submissions for the project.
PDF
PDF, High priority: read this first43 pages · permit-revision
HighAI Summary for FLA012031 Ridge Manor Subregional WWTF Minor Permit Revision: This document is a minor permit revision issued by the Florida Department of Environmental Protection for the Ridge Manor Subregional Wastewater Treatment Facility (Permit No. FLA012031). Dated September 22, 2017, it corrects the facility name and updates the Discharge Monitoring Reports (DMRs) accordingly. The permit authorizes Hernando County Utilities to operate a 0.750 MGD domestic wastewater treatment plant with specified treatment and land application systems. The permit includes detailed effluent limitations, monitoring requirements, and operational conditions effective through January 30, 2028.
PDF
PDF, High priority: read this first126 pages · itb
HighAI Summary for ITB 26-C01237/JG Ridge Manor Water Reclamation Facility Expansion & Emergency Operations Structure: This Invitation to Bid (ITB No. 26-C01237/JG) issued by Hernando County, Florida, solicits bids for the Ridge Manor Water Reclamation Facility Expansion & Emergency Operations Structure project. The document includes solicitation instructions, general and special conditions, scope and specifications, pricing proposal, and vendor questionnaire. It specifies bid submission via the County's eProcurement Portal by 10:00 a.m. on January 28, 2026, and details bonding requirements. A non-mandatory pre-bid conference is scheduled for December 17, 2025. The document aims to procure a general contractor licensed in concrete tankage construction and related sitework, electrical, instrumentation, and new building installations.
PDF
PDF, High priority: read this first9 pages · contract-document
HighAI Summary for ITB NO. 26-C01237/JG - Ridge Manor Water Reclamation Facility & Emergency Operations Structure: Construction contract between Hernando County, Florida, and a Vendor/Contractor for the Ridge Manor Water Reclamation Facility & Emergency Operations Structure (ITB NO. 26-C01237/JG). The document outlines contract documents, roles of the engineer, a substantial completion timeline of 730 calendar days, liquidated damages of $2,000 per day, and a lump sum pricing schedule for facility expansion components.
DOCX
DOCX, High priority: read this first8 pages · contract-document
HighAI Summary for Performance and Payment Bond and Construction Coordination Documents: This document is a Performance and Payment Bond form for a construction contract with Hernando County, Florida. It binds the Vendor/Contractor and Surety to ensure faithful contract performance and payment to labor and material suppliers. The bond includes indemnification clauses, payment obligations, and a one-year warranty period. Additionally, the document contains emergency contact information for project personnel and vital agencies, utility coordination certifications, and a maintenance of traffic plan certification for construction sites. It is intended for use after contract award to ensure compliance and coordination during project execution.
PDF
PDF, High priority: read this first1810 pages · specifications
HighAI Summary for Ridge Manor WRF Expansion Bid Specifications 2025-10-29: This document contains the bidding and construction contract documents and technical specifications for the Hernando County Ridge Manor Water Reclamation Facility (WRF) Expansion and Emergency Operations Structure (EOS) project, Project No. 08375-060-01. It includes a detailed table of contents covering divisions from general requirements, site construction, concrete, masonry, metals, woods and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, special construction, mechanical, and electrical. The document is prepared by Jones Edmunds & Associates, Inc. and dated October 29, 2025. It serves as a comprehensive guide for contractors outlining project requirements, construction coordination, materials, equipment, testing, and various technical specifications necessary for the project execution.
PDF
PDF, High priority: read this first1816 pages · specifications
HighAI Summary for Ridge Manor WRF Expansion Bid Specs Revised 1-9-2026: This document contains the bidding and construction contract documents and technical specifications for the Hernando County Ridge Manor Water Reclamation Facility (WRF) Expansion and Emergency Operations Structure (EOS) project, Project No. 08375-060-01. It includes detailed divisions covering general requirements, site construction, concrete, masonry, metals, woods and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, special construction, mechanical, and electrical work. The document is revised as of January 9, 2026, and provides comprehensive technical specifications and project requirements necessary for bidding and construction.
PDF
PDF, High priority: read this first17 pages · operation-and-maintenance-plan
HighAI Summary for Stormwater Management Facility Operation and Maintenance Plan - Ridge Manor WRF: This document is the Stormwater Management Facility Operation and Maintenance Plan for the Ridge Manor Water Reclamation Facility (WRF), Project No. 24054, dated July 7, 2025. It provides a detailed description of the project site, including location, topography, and existing conditions. The plan outlines responsible parties, stormwater facilities and components, maintenance activities, schedules, inspection requirements, and future capital expenditures. The facility includes an expanded dry retention pond and associated stormwater management systems designed to contain runoff within the site. The document supports permit applications and compliance with environmental regulations for stormwater management at the facility.
PDF
PDF, Low priority5 pages · amendment
LowAI Summary for 08375-060 Yard Piping Addendum 5: This document is Addendum 5 for the specification 08375-060 Yard Piping. The content of the document is not available, so no further details can be provided.
PDF
PDF, Low priority152 pages · report
LowAI Summary for Land Application Report for Hernando County Ridge Manor WRF July 2025: This Land Application Report, dated July 2025, supports the Domestic Wastewater Facility Permit Application for the Hernando County Ridge Manor Water Reclamation Facility (WRF) in Florida. Prepared by Jones Edmunds & Associates, Inc. and Liquid Solutions Group, LLC, the report provides technical data per Florida Administrative Code Chapter 62-610. It details the existing facility's treatment and effluent disposal capacities, site location, geotechnical data, hydrogeologic characteristics, groundwater monitoring plans, and project evaluation including groundwater flow modeling. The report aims to support the redesign and expansion of the WRF from 0.75 MGD to 2.0 MGD with potential future expansion to 4.0 MGD, ensuring compliance with environmental protection objectives and safeguarding groundwater and surface water quality.
PDF
PDF, Low priority1 page · orientation
LowAI Summary for Owner Direct Purchase Contractor Orientation: This document provides an orientation on the Owner Direct Purchase (ODP) process used by the County. It explains that the County directly purchases certain construction materials or equipment to save on Florida sales tax and reduce project costs. The document outlines the contractor's role, including bidding with full material costs, providing supplier information, managing materials, inspections, and coordinating deliveries. It also details payment procedures and contract adjustments through deductive change orders. The orientation emphasizes contractor responsibilities for quality, coordination, installation, and warranty management of ODP materials.
PDF
PDF, Low priority95 pages · geotechnical-report
LowAI Summary for Ridge Manor WRF Geotechnical Engineering Services Report 2025-08-26: This is the Final Geotechnical Engineering Services Report for the Ridge Manor Water Reclamation Facility (WRF) in Hernando County, Florida, dated August 26, 2025. The report presents findings from geotechnical exploration including subsurface conditions, soil borings, groundwater data, and laboratory testing. It provides preliminary geotechnical recommendations to support design improvements for various facility components such as tanks, pump stations, buildings, and stormwater management features. The report includes a scope of services, review of published data, and construction considerations, with appendices containing survey plans, soil profiles, and test results.
PDF
PDF, Low prioritybiotic-evaluation
LowAI Summary for Ridge Manor WTP Biotic Evaluation Report 11-04-2024: This biotic evaluation report dated November 4, 2024, assesses the Ridge Manor Subregional WRF Expansion site in Hernando County, Florida. Prepared by Coastal Engineering Associates, Inc. for Hernando County Utilities Department and Jones Edmunds, it covers a 95.6-acre project area. The report includes site characteristics, habitat characterization, and surveys of flora and fauna, focusing on threatened and endangered species such as the gopher tortoise and sandhill crane. It details methodology, topography, soils, and ecological communities, with findings supporting environmental compliance and permitting requirements.
The Ridge Manor Water Reclamation Facility & Emergency Operations Structure project consists of building a brand-new water reclamation facility adjacent to an existing in use wastewater treatment plant. The existing wastewater treatment plant shall always remain active until final completion and acceptance of the new water reclamation facility. The existing plant is 0.75 MGD and the new facility is 2.0 MGD with a bid alternate of an additional 1.0 MGD and would bring the total facility if awarded with the alternate to a 3.0 MGD. The new water reclamation facility will be constructed within the existing rapid infiltration basin number 2 which will need to be taken offline from the existing wastewater treatment plant. The existing rapid infiltration basin number 1 shall remain active. There will be new rapid infiltrations basins constructed as part of the project and should allow the clean fill to be used from the site to assist in the construction of the new project. The Emergency Operations Structure project consists of building an approximately 2,500 square foot site built concrete split face block structure. The structure will have general office space, large conference room, breakroom, restrooms, general mechanical/SCADA rooms. The structures' primary purpose will be the office of the new water reclamation facility for overview of all facility controls. The building will also serve in times of declared state of emergencies for Department staff. The structure will be served with back up power from the generator installed with the new water reclamation facility.