Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Georgia was posted on January 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rincon WRF Improvements - CMAR Request

Closed
PE-66548-NONST-2026-000000007State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
PIDC Project 1 - Bldg. 3 plumbing, boiler, FA, painting and WWTP
Solicitation # 872281
This project involves a Firm-Fixed-Price task order issued under an 8(a) MACC IDIQ for the U.S. Immigration and Customs Enforcement at the Port Isabel Detention Center in Los Fresnos, Texas. With an estimated magnitude between 1.5 million and 2 million dollars, the scope of work focuses on critical infrastructure repairs and upgrades across several systems. Key requirements include the replacement of domestic water and sanitary sewer systems in Multipurpose Building 3 using PEX and PVC piping, the installation of energy-efficient boilers in the Admin, Processing, Medical, and Dining areas, and the replacement of the dining facility fire alarm system. Additionally, the project includes painting 11 facilities and upgrading the wastewater treatment plant by replacing worn valves, repairing aeration ditch piping, and installing sewage grinders to ensure the system is durable and coastal weather resistant. The contract has a performance period of 365 days from the date of award. Award decisions are based solely on the lowest total evaluated price, provided the offeror meets technical, safety, and quality control requirements. Contractors must provide a Project Manager with at least five years of federal contracting experience and submit a comprehensive Quality Control Plan and safety plan. All work must adhere to Davis-Bacon Act wage determinations for Cameron County, Texas, and requires performance and payment bonds. Personnel must undergo background checks for facility access, and specific installations for the fire alarm and wastewater systems require manufacturer certification. Payment is processed electronically via the Invoice Processing Platform with the requirement of certified payroll.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the installation of approximately 1,450 square feet of permeable pavement and eight vegetated stormwater management cells to treat roughly 1.7 acres of impervious surface within a 3.3-acre drainage area. Additional requirements include the installation of six native trees and approximately 345 native plants, as well as necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. The project also encompasses limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, concluding with final stabilization, cleanup, and restoration. This opportunity specifically seeks subcontractors and suppliers from Minority Business Enterprises, Disadvantaged Business Enterprises, and Women-Owned Business Enterprises, as well as other small business categories including HUBZone and Veteran-Owned Small Businesses. Interested parties are encouraged to form consortiums if individual bid items are too large for a single small business to manage. Bids must be submitted by September 17, 2026, at 4:00 P.M. Primary points of contact for the solicitation include Jennifer Wilson and Jonah Leith.
Harbel, Inc.

POSTED

about 9 hours ago

DEADLINE

in 5 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure solicitation issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids are due by September 29, 2026, and the project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The City of Rincon, Georgia, is seeking proposals from qualified Construction Manager at Risk (CMAR) firms to undertake immediate improvements to the existing Rincon Water Reclamation Facility (WRF). The project aims to increase the facility’s initial capacity and set the stage for future expansions, utilizing state grant funds. Due to the urgency of the project, the City has chosen the CMAR delivery method to expedite the process. The contract includes limited preconstruction services, followed by a construction agreement based on a mutually agreed Guaranteed Maximum Price (GMP). The contract allows flexibility, enabling the Owner to add additional work scopes after the initial GMP as the project evolves. Interested parties must submit proposals by the response deadline of February 16, 2026. The selected CMAR will first provide preconstruction services and then transition into the construction phase under the agreed GMP terms. This solicitation does not impose set-asides and is managed by the City of Rincon, with primary contact Cole Hodges available for inquiries. The project represents a critical infrastructure upgrade for the City’s water management system, emphasizing prompt implementation and adaptability throughout the construction process.

General Info

City of Rincon seeks CMAR for urgent Rincon WRF capacity expansion, using state grant funds.

Agency

Georgia → City of RinconView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(7)

City of Rincon Water Pollution Control Plant Upgrade and Expansion - December 2002

PDFspecifications

Rincon WRF Interim Upgrades CMAR Request for Proposals

PDF14 pagesrfp

Rincon WRF Interim Upgrades Addendum No. 1

PDF387 pagesamendment

Rincon WRF Interim Upgrades IFB Plan Set 1_13

PDF41 pagesifb

Addendum No. 2 for Rincon WRF Interim Upgrades

PDF1 pageamendment

City of Rincon Water Pollution Control Plant Water Reuse Expansion April 2006

PDFspecifications

RFP for Construction Manager-at-Risk Services for Rincon WRF Interim Upgrades

PDF720 pagesrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Rincon
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → City of Rincon
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
The City of Rincon, GA (City) is requesting proposals from a Construction Manager at Risk (CMAR). The purpose of the project is to use funds granted by the state to make immediate improvements to the existing Rincon Water Reclamation Facility (WRF) to increase initial capacity and prepare for a future expansion. Due to the speed of the project, the City desires to implement the CMAR delivery method. Limited preconstruction services will be required. The City intends to enter into an agreement with the selected CMAR for preconstruction services and then immediately enter into a construction contract for a mutually agreed upon Guaranteed Maximum Price (GMP). This is not limited to a single GMP or scope of work. The Owner may elect to add additional scope of work as the project progresses at its sole discretion.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS