Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Rio Consumnes Correctional Center New Potable Water Tank

Active
20260902045State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of Sacramento is seeking bids for the design and construction of a 350,000-gallon potable water prestressed concrete tank at the Rio Consumnes Correctional Center in Elk Grove, California. The scope of work encompasses site preparation, the creation of a gravel access road, and the installation of water lines and conduits to link the new tank with the existing water treatment facility. The selected contractor must provide design drawings and calculations sealed by a California-registered Engineer to secure necessary building permits and must adhere to the specific experience and equipment standards outlined in Technical Specification 10 30 05. Because the project is located within a secure correctional facility, all personnel must pass background checks and strictly follow facility regulations. Interested parties must attend a mandatory pre-bid meeting. Bids for solicitation number 20260902045 are due by October 8, 2026. Primary inquiries should be directed to Jennifer Shively.

General Info

Sacramento County seeks bids for a 350,000-gallon water tank by October 8, 2026.

Agency

California → County of SacramentoView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Elk Grove, CA, 95757, USA

Set-Aside

NONE

Documents

(3)

Contract_4689_-_RCCC_New_Potable_Water_Tank_-_Drawings.pdf

PDF

Sacramento_County_-_StandardConstructionSpecs_-_Rev_Nov_2024.pdf

PDF

Rio_Consumnes_Correctional_Center_New_Potable_Water_Tank1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → County of Sacramento
Contacts1 person available
OfficeN/A
Organization / Agency
California → County of Sacramento
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
Bid #4689: The County of Sacramento is soliciting bids from a qualified Tank Contractor to design and construct a new 350,000-gallon potable water prestressed concrete tank at the Rio Consumnes Correctional Center (RCCC). The project includes site preparation, construction of a gravel access road surrounding the tank, and installation of proposed water lines and conduit to connect the tank to the existing water treatment facility. The Contractor is required to submit design drawings and calculations for the tank and foundation suitable for obtaining building permits, sealed by a California-registered Engineer. All work will occur within a secure correctional facility, necessitating background checks for all personnel, including those attending the mandatory pre-bid meeting. All facility regulations must be followed throughout the project duration. The Tank Contractor must meet specific experience and equipment requirements as detailed in Technical Specification 10 30 05 Strand Wound, Prestressed Concrete Tank.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The JCSD Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as welding, cathodic protection, valves, and jack and bore operations, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Additionally, the project requires technical services for surveying, settlement monitoring, videography, E&IC, and environmental management through SWPPP implementation and asbestos pipe demolition and removal. This solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications through Julia Masaitis.
Filanc

POSTED

about 11 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves the installation of critical water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional infrastructure components include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. Civil works involve the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. Bids are due by September 29, 2026, with all negotiations required to be finalized 24 hours prior to the bid opening. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of equipment and materials. Quality control testing is a specified requirement for the project.
James W. Fowler Co.

POSTED

about 11 hours ago

DEADLINE

in 25 days
View Details

More opportunities from California → County of Sacramento

Same awarding agency

NAICS: 237990
New
SLED
Kiefer Landfill- Module 5, Phase 1 Liner Construction
Solicitation # 20260901044
The County of Sacramento is soliciting bids for the construction of the Module 5, Phase 1 base liner system and related structures at the Kiefer Landfill in Sloughhouse, California. This project involves the development of approximately 24 acres, including earthwork for soil excavation and stockpiling, the installation of a multi-layer base liner system consisting of HDPE geomembranes, GCL, and geotextiles, and the construction of a leachate collection and removal system. Additional infrastructure work includes surface water drainage structures, perimeter access road extensions, and the installation of utility alignments for electrical power, landfill gas header pipes, and leachate force mains. The estimated construction cost is 29 million dollars, which includes a 500,000 dollar bonus for early completion by March 15, 2028. The contract will be awarded to the lowest qualified, responsive, and responsible bidder. Bids must be submitted electronically via the Sacramento County portal by October 8, 2026, at 2:00 PM. Requirements for bidders include a bid bond of at least 10 percent of the aggregate bid sum, a valid CSLB license, and registration with the California Department of Industrial Relations. The successful contractor must provide performance and payment bonds for 100 percent of the contract price and adhere to prevailing wage requirements. The project has a completion timeline of 350 working days, with liquidated damages set at 10,000 dollars per calendar day for delays beyond the established completion date. Quality assurance is managed through a comprehensive CQA plan and strict testing requirements for all liner layers and welding certifications.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details