Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Rip-Rap Installation & Erosion Control

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the supply and installation of rip-rap for erosion protection at drainage outfalls within the City of Corona, California, requiring comprehensive site preparation, grading, and precise placement of materials in full compliance with both city and state regulatory standards. Work must ensure long-term stability of drainage infrastructure by mitigating erosion risks through properly engineered rock placement, with all activities aligned to local environmental and civil engineering specifications. Execution of this subcontract is focused exclusively on the specified location in Corona, with no alternative performance sites permitted. The project falls under NAICS code 237990, indicating it is categorized as other heavy and civil engineering construction, and it is not subject to any formal set-aside provisions. The contract was posted on July 6, 2026, and all work must be completed according to the technical and procedural requirements outlined by municipal authorities to ensure public safety and infrastructure integrity.

General Info

Supply and install rip-rap for erosion protection at Corona drainage outfalls per city and state standards.

Agency

California → City of Corona

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Corona, CA

Set-Aside

NONE

Documents

This scope was carved out of Skyline Heights Project.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Corona
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Corona
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and install rip-rap for erosion protection at drainage outfalls, including site preparation, grading, and placement per City and state standards.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The scope of work involves mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and the installation or reworking of stone to fill voids. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The project is located in Haleiwa, Oahu, Hawaii, and is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certified entities under NAICS code 237990. The contract requires a rigorous quality control and inspection process consisting of preparatory, initial, and follow-up phases, culminating in punch-out, pre-final, and final acceptance inspections. Contractors must adhere to specific ASTM standards for stone materials and comply with USACE EM 385-1-1 safety regulations, including the appointment of a Site Safety and Health Officer with an OSHA 30-hour certification. Key personnel, such as the Project Manager and Quality Control System Manager, are subject to approval by the Contracting Officer. Financial terms include monthly invoicing and a liquidated damages penalty of 2,297 dollars per calendar day of delay. Bidders must provide a bid guarantee and subsequent performance and payment bonds to ensure contract fulfillment.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is serving as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19,300,000.00 dollars, the project scope involves the design and removal of existing trailer-mounted electrodialysis reversal, slab-mounted membrane filtration, and reverse osmosis units. These will be replaced with new slab-mounted membrane filtration and reverse osmosis units to create a demineralization facility at the South Bay Water Reclamation Plant aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks subcontractors for various trades including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. All subcontractors must utilize union labor and be prepared to provide a 100 percent payment and performance bond from a US Treasury listed surety company, though Garney will reimburse the bond premium. The project strongly encourages participation from SLBE, ELBE, DBE, MBE, WBE, and SBE certified firms, and offers assistance to these firms in obtaining bonding lines of credit or insurance. Bids are due by August 27, 2026, at 2:00 PM PT, and will be based on Garney Standard Purchase Order and Subcontract forms.
Garney Pacific, Inc.

POSTED

about 14 hours ago

DEADLINE

in 2 days
View Details