Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Missouri was posted on March 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Road Construction/Re-Build - Iron Grain Lane

Closed
IFB-004-0-2025/AFState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
W2SD Endist New England

POSTED

about 4 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The project involves comprehensive roadway improvements along Iron Grain Lane, including final grading for asphalt pavement with the subgrade prepared approximately two-tenths of a foot below finished grade. Construction activities encompass the installation of concrete curb and gutter, base courses, and ADA-compliant sidewalks, along with finish grading and landscaping at the back of curbs and sidewalks. Additional work includes seeding or sod installation, the construction of a handrail at the east culvert, and the building of concrete approaches as specified in the bid. Temporary traffic control measures will be implemented to facilitate construction activities. Certain tasks are explicitly excluded from the scope, notably stormwater utility and riprap installation, as well as erosion control measures. The project details are supported by engineering plans and bid quantities provided in the referenced exhibits. The contract, issued by the City of Republic in Missouri under solicitation number IFB-004-0-2025/AF, has a project value estimated between $500,000 and $1,500,000, with a response deadline of March 24, 2025.

General Info

Agency

Missouri → City of Republic

Place of Performance

MO, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMissouri → City of Republic
ContactsNo contacts available
OfficeN/A
Organization / Agency
Missouri → City of Republic
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Project shall include the following: • Final grading for installation of asphalt pavement. Pavement subgrade will be installed to approximately two-tenths below finished grade. • Construction and installation of concrete curb and gutter, and base course. • Finish Grade Work & Associated Landscaping, i.e., at back of curb and sidewalks. • Application/installation of seeding and/ or sod. • Installation of Handrail at culvert on east end. • Construction of ADA-compliant sidewalks. • Temporary Traffic Control. • Construction and installation of concrete approach (additive portion of bid). This Project DOES NOT INCLUDE the following: • Stormwater utility installation and Riprap installation. • Erosion control installation Please refer to the following attachments for additional specifications and details: 1. EXHIBIT 1 – Iron Grain Lane Roadway Improvements Engineering Plans 2. EXHIBIT 2 – Bid Quantities

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS