Rock Creek WRRF Gravity Belt Thickener Drain Piping Replacement Project No. 6372.094
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Clean Water Services is seeking sealed bids for the Rock Creek WRRF Gravity Belt Thickener Drain Piping Replacement Project No. 6372.094, located in Hillsboro, Oregon. The project involves providing temporary bypass piping, demolishing and removing existing steel drain pipes and elbows, performing video inspections, and installing new 12 inch PVC piping to reconnect the WASSTRIPATE wet well, GBT drains, and floor drains to the SPR wet well. The estimated construction cost for this public works project is 300,000 dollars. Bids must be submitted electronically via Bid Locker by 2:00 p.m. on September 8, 2026, with First-Tier Subcontractor Disclosure Forms due by 4:00 p.m. that same day. A mandatory prebid conference and site visit is scheduled for August 25, 2026, at 9:00 a.m. Bidders must be registered with the Oregon Construction Contractors Board and qualified under ORS 279C. Bid security must be delivered by mail or in person within five business days following the bid deadline.
General Info
Agency
NAICS
Place of Performance
OR, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Bids will be publicly opened and read aloud by telephone conference at 2:00 p.m. local time on September 8, 2026. Bidders can attend the opening by calling the telephone conference number 503.681.4499.
Contractor shall complete the work as specified or indicated in Owner’s Contract Documents for the Project. The Project generally consists of the following:
Furnish all labor, materials, and equipment necessary to:
A. Provide temporary bypass piping to direct flows from the existing Gravity Belt Thickener (GBT) drains to the backwash pump suction header.
B. Demolish and remove the existing Filtrate/Emergency Overflow (FILT/EOF) welded steel drain pipe (10” to 14”) connecting the WASSTRIPATE wet well and GBTs to the Solids Process Recycling (SPR) wet well.
C. Demolish and remove the 14” drain elbow and drop pipe inside the SPR wet well. Video inspect approximately 15 linear feet of the remaining 14” FILT/EOF pipe.
D. Install a new 12” polyvinyl chloride FILT/EOF pipe to reconnect the WASSTRIPATE wet well, GBT drains, and floor drains to the SPR wet well.
E. Install related equipment, temporary items, and appurtenances necessary to complete the Work and to provide a complete and functional system in accordance with the Contract Documents.
The Work Site is located at Rock Creek Water Resource Recovery Facility, 3235 SE River Road, Hillsboro, Oregon 97123 (Site). The Work will occur on the Ground Level and Lower Level Pipe Tunnel of the Thickening and Dewatering Buildings. The Work is a public works project subject to ORS 279C.800 to 279C.870. Bidders are advised that amendments made to ORS 279C.800 by Oregon State Legislature House Bill 2688 (HB 2688) became operative July 1, 2026 and public works contracts entered into on or after this date are subject to HB 2688 related law changes. Bidders’ attention is directed to the provisions of Section 00300 Bids Forms paragraph 5.1.6.
The estimated construction cost of the Work is $300,000
The Bidding Documents are entitled “Rock Creek WRRF Gravity Belt Thickener Drain Piping Replacement Project No. 6372.094.” All Bidding Documents and Bid Results can be downloaded from Bid Locker at https://bidlocker.us/details/6000. It is the Bidder’s responsibility to refer daily to Bid Locker’s website to check for any available amendments or addenda, response to inquiries or questions, cancellations, or notices of intent to award, and any and all information regarding this opportunity. It is not Owner’s responsibility to notify participating Bidders by email or by any other means of any of the above. Copies of this advertisement can be obtained on the Bid Locker website or Owner’s website at https://dynamic.cleanwaterservices.org/Bids. If problems are experienced downloading the documents, please contact Steve Waldron at waldrons@cleanwaterservices.org.
Each Bid must be submitted on the prescribed Bid Form and accompanied by Bid security as prescribed in the Instructions to Bidders. Bidders must deliver the original of the Bid security to Steve Waldron either by first class mail to Administration Building Complex, 2550 SW Hillsboro Hwy, Hillsboro, Oregon 97123 (Owner’s Office), or by hand delivery to the Durham Treatment Plant Services Building, 16060 SW 85th Avenue, Tigard, OR 97224, within five business days after the Bid Deadline.
The Successful Bidder will be required to furnish the additional bond(s) and insurance prescribed in the Bidding Documents. Prior to submission of its Bid, Bidder shall be registered with the Oregon Construction Contractors Board.
The Work does not involve asbestos, so the requirements of ORS 468A.700 through 468A.760 shall not apply. Bidders must be qualified in accordance with the applicable parts of ORS 279C in order to submit a Bid for public work in Oregon.
For questions regarding technical and administrative issues, contact Owner: Steve Waldron, at 503.547.8134, or by email to waldrons@cleanwaterservices.org.
Prospective Bidders are required to attend a mandatory prebid conference and Site visit that will begin at 9:00 a.m. local time on August 25, 2026 in the Rock Creek WRRF Engineering Building Dewatering Conference Room and last approximately one hour. Representatives of Owner and Engineer will be present to discuss the Project.
Owner reserves its right to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents.