Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on January 22, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Roof And Hvac Replacement At Harbor Police Headquarters

Closed
2020-16State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
Federal
Camptonville Housing Decommissioning
Solicitation # 127EAX26Q0076
Solicitation 127EAX27Q0010 is a combined synopsis and request for quotation issued by the USDA Forest Service for the decommissioning of barracks and other buildings at the Tahoe National Forest in Nevada City, California. The scope of work includes demolishing structures, clearing and disposing of debris, capping utilities, and performing HAZMAT mitigation for lead paint, asbestos, and animal feces. This is a total small business set-aside under NAICS code 238910, with a small business size standard of 19 million dollars. The anticipated contract is a firm fixed price award with an estimated price range between 100,000 and 250,000 dollars. The government will award the contract based on the lowest price technically acceptable criteria. Qualified offerors must be registered in the System for Award Management and submit four separate PDF documents, including a signed SF-1442, a price proposal schedule of items, and a technical proposal detailing their approach and past performance. A bid guarantee of 20 percent is required for quotes exceeding 150,000 dollars. The selected contractor must commence work within 10 calendar days of the notice to proceed and complete all activities, including final cleanup, within 90 calendar days. The project is subject to the Davis-Bacon Act and Buy American requirements for construction materials.
USDA Forest Serivce

POSTED

about 8 hours ago

DEADLINE

in 29 days

AI Contract Overview

Show more

This contract involves a comprehensive roofing and HVAC replacement project at the Harbor Police Headquarters in San Diego, California. The scope includes the complete removal and disposal of an existing built-up roof system covering approximately 12,000 square feet, down to the wood substrate, followed by the installation of a new fully adhered TPO membrane roofing system over high-density coverboard and polyisocyanurate insulation. The work also encompasses the removal and replacement of all roof flashings, copings, roof drains, and penetrations, ensuring proper disposal of hazardous materials such as asbestos and lead-based paints as identified in the hazardous materials survey. Mechanical work involves removing existing equipment, ductwork, and related components at the main building and auxiliary structures, then installing new mechanical systems with seismic restraints and necessary appurtenances, including connecting the new HVAC system to existing electrical and control systems. Additionally, the project includes electrical modifications for the new HVAC setup, such as system demolition, installation of a new automatic control system, and integration with existing systems across multiple buildings. Testing, balancing, commissioning, and staff training are required to ensure proper operation of the new systems. Temporary protective measures, including mobile partitions and crane permits, are part of the work to facilitate construction activities while safeguarding existing improvements not scheduled for demolition. The project emphasizes coordination of various trades and adherence to specified drawings and requirements, with a response deadline set for March 6, 2024. The contract is managed by the Port of San Diego, with a designated point of contact for inquiries.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

1

Spec 2020-16: Roof and HVAC Replacement at HPHD

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Port of San Diego
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
A. The Work Includes1. Furnish all labor, materials, equipment, supplies, transportation and disposal as necessary to complete the construction of DIVISION 1 – GENERAL REQUIREMENTS, San Diego, California. 2. The Work shall include but is not limited to the following:a. Removal and disposal of approximately 12,000 square feet (Harbor Police Administration Building) of built up roof system down to wood substrate including all materials attached to the existing roofing system as shown on the drawings. Installation of new fully adhered Thermoplastic Polyolefin (TPO) Membrane Roofing System over high density coverboard polyisocyanurate insulation on the existing roof wood plank decking.b. Removal and disposal of all cants, flashing, copings, roof drains and all roof penetrations. Installation of new flashing, flashing, coping, roof drains and all roof penetration.c. Proper removal and disposal of asbestos containing materials and lead paint containing surfaces listed on APPENDIX C – LIMITED HAZARDOUS BUILDING MATERIALS SURVEY OF HARBOR POLICE ADMINISTRATION BUILDING of the Specifications.d. Removal and Disposal of mechanical equipment, all related ductwork and appurtenances at the Harbor Police Administration Building and the two Metal Buildings (HP Auxiliary building 1W and HP Auxiliary Building 2E) as shown on the Drawings. e. Installation of new mechanical equipment, all related ductwork, seismic restraint and all other related appurtenances as shown on the drawings and as specified.f. Demolition and modification of electrical system related to the installation of new AC system including installation of uninterruptible power system (UPS) including connection to the existing temporary power.g. Installation of new Automatic Control System for the new HVAC equipment at the Harbor Police Administration Building. All existing HVAC system in the gymnasium, Annex building, Investigation and Patrol Building shall be connected to the new Automatic Control System.h. Testing, balancing, commissioning and training of District staff of new HVAC equipment and Automatic Control System.i. Protection of all existing improvements that are not included for demolition, otherwise noted on the drawings.j. Installation of mobile temporary in certain rooms at the Harbor Police Administration Building as necessary during construction.k. Use of crane and permit requirements and other means and methods for completion of the Work.l. Other works as shown on the drawings and as specified.DOWNLOAD SPECIFICATION AND RELATED DOCUMENTS FOR COMPLETE SCOPE OF WORK AND BIDDING REQUIREMENTS

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS