Roof Insulation and Slope Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract calls for the supply and installation of tapered extruded polystyrene insulation to create a minimum 2 percent slope directed toward roof drains, ensuring proper water runoff and preventing ponding. The work includes the integration of drainage board and filter fabric as part of the overall roofing system to protect the insulation and facilitate efficient water management. All materials and methods must meet technical specifications for durability, thermal performance, and compatibility with existing roof assemblies. The project is located in Frankfurt with performance requirements tied strictly to achieving the required slope and proper layering of components under the supervision of qualified personnel. This is a subcontract under the Department of State via Acquisitions - Rpso Frankfurt, issued on June 17, 2026, with proposals due by July 3, 2026 at 1:00 PM. The North American Industry Classification System code is 327212, indicating it falls under the manufactured homes and modular buildings sector, though the work specifically targets roofing systems. There is no set-aside classification specified, and no point of contact is listed in the data. Contractors must comply with all installation standards, material certifications, and site-specific conditions to meet the performance objectives outlined in the scope of work.
General Info
Agency
NAICS
Place of Performance
Franakfurt, DC, DEUSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
