This Solicitation opportunity from Florida was posted on March 17, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Roof Replacement and Designated Repairs
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the comprehensive replacement of the roofing systems on buildings 5 and 6, requiring the removal of the existing metal panels down to the sloped metal roof decks. The project includes stripping away the current sub-framing and insulation, then installing a new base layer consisting of 1 ½ inch non-tapered rigid insulation and 5/8 inch plywood sheathing, which will be primed and prepared with self-adhered underlayment before the installation of a new aluminum metal panel roof system. The contractor must be licensed in Florida and adhere to a strict ninety-day completion timeline. All project plans and specifications are provided by A/R/C Associates, Inc., and the work must comply with the State Requirements for Educational Facilities (SREF) as outlined in the Florida Building Code, given the facilities' ownership by the Pinellas County School Board. The solicitation for this project, titled "Roof Replacement and Designated Repairs," was posted on March 17, 2025, with a response deadline of April 10, 2025. The project is valued between $500,000 and $1,500,000 and is managed by the Pinellas County School Board, with primary contact being Mary Ann McConahy. Interested contractors can find additional bid details through the provided vendor link. The project emphasizes adherence to local building codes, licensing requirements, and a clear timeline to ensure timely completion of the roof replacement.
General Info
Place of Performance
FL, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Remove the existing metal panel roof system down to the existing sloped metal roof deck. Remove existing sub-framing and insulation over existing roof deck. Fasten a base layer of 1 ½” thick non tapered rigid insulation and 5/8” thick plywood sheathing for new metal roof panel attachment. Prime new sheathing as needed and apply self adhered underlayment. Install new aluminum metal panel roof system. The contractor shall be a Florida licensed Roofing Contractor.
This bid will adhere to a ninety-day contract period.
All plans and specifications have been provided by A/R/C Associates, Inc.
The State Requirements for Educational Facilities (SREF) are part of the Florida Building Code. SREF requirements shall apply to construction, renovation, and remodeling of public educational facilities owned by Pinellas County School Board.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
