Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ROOF REPLACEMENT AT FIRE STATION #1

Closed
25/26-77State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 7 hours ago

DEADLINE

in 9 days
NAICS: 238160
New
SLED
IFB Rain Gutter Replacement, Alameda County
Solicitation # 32A0745
The California Department of Transportation (Caltrans) has issued an Invitation for Bid (IFB) under solicitation number 32A0745 for the removal and installation of rain gutters, downspouts, and associated components at the Caltrans Equipment Main Shop 4 in San Leandro, Alameda County. The project involves installing approximately 960 feet of 24-gauge galvanized metal gutters, 17 downspouts, and powder-coated steel screen leaf guards, all of which must be primed and painted with low VOC latex paint. The successful contractor must complete all work and submit final invoicing within 90 days of the notice to proceed. The contract will be awarded to the lowest responsive and responsible bidder, with a mandatory requirement for a D-24 Metal Products license from the CSLB. Bids are due by November 24, 2026, at 2:00 p.m. and must be submitted to the Caltrans Division of Procurement and Contracts in Sacramento. Evaluation includes a 5% preference for certified Small Businesses (SB) or Microbusinesses (MB) and a 3% DVBE participation requirement. Additionally, a payment bond is required for bids exceeding 25,000 dollars, and prevailing wages apply if the total bid exceeds 15,000 dollars. All work must adhere to the 2025 California Building Standards Code, CALOSHA, and 2010 ADA Standards for Accessible Design.
California Department of Transportation

POSTED

about 15 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The project for Roof Replacement at Fire Station #1, solicitation number 25/26-77, involves the removal and replacement of approximately 7,100 square feet of ballasted built-up roofing with a new EPDM membrane system. The scope of work includes the off-site disposal of existing roofing materials, insulation, and metal flashings, as well as the replacement of the roof hatch, deteriorated decking, wood blocking, and roof drains with associated piping. The contractor is responsible for furnishing and installing the complete roofing system, including underlayment, flat and tapered insulation, and all necessary flashings, coping, fascia, and scuppers in accordance with project specifications and applicable codes. This solicitation was posted by the Facilities agency for the State of Connecticut in Manchester, with a response deadline of August 27, 2026. Primary contact for the project is Assistant Project Manager Garth McDonough, and the secondary contact is Purchasing Agent Cora Narracci. All work will be performed at the designated location within Connecticut.

General Info

Roof replacement at Fire Station #1, Manchester, CT, due August 27, 2026.

Place of Performance

CT, USA

Set-Aside

NONE

Documents

8

Connecticut Prevailing Wage Notes and Certification Form 2023-09-27

PDF, High priority: read this first19 pages · wage-determination
High

Fire Station #1 Roof Replacement – Bid Drawings

PDF, High priority: read this firstspecifications
High

Invitation to Bid 25/26-77 - Roof Replacement at Fire Station #1

PDF, High priority: read this first20 pages · itb
High

Manchester Fire Stations #1 & #3 Roof Detail SK1

PDF, High priority: read this firstspecifications
High

Prevailing Wage Rates for Fire Station #1 Roof Replacement

PDF, High priority: read this first9 pages · wage-determination
High

RE-Bid Fire Station #1 Roof Replacement Project Manual

PDF, High priority: read this first201 pages · project-manual
High

IRS Form W-9 Request for Taxpayer Identification Number and Certification

PDF, Low priority6 pages · tax-form
Low

RE-Bid_FIRE_STA_1_ROOF_REPLACEMENT_Asbestos_Inspection Report June 2021

PDF, Low priority66 pages · asbestos-inspection-report
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → Facilities
Contacts2 people available
OfficeManchester, CT, 06040, USA
Organization / AgencyConnecticut → Facilities
Office AddressManchester, CT, 06040, USA
Contacts
Garth McDonoughAssistant Project Manager
Cora NarracciPurchasing Agent

Interested Companies (16)

New Horizons ConstructionMiddletown, CT
The Imperial Company , Restoration ContractorCromwell, CT

See All 16 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The work consists of the removal and replacement of approximately 7,100 square feet of existing ballasted built-up roofing with a new EPDM membrane roofing system. Scope of work includes, but is not limited to, the removal and off-site disposal of existing roofing materials, including insulation, cant strips, tapered edge components, and metal flashings. The project also includes the removal and replacement of the existing roof hatch and associated roof accessories; removal and replacement of deteriorated roof decking and wood blocking as required; and removal and replacement of existing roof drains, including all associated piping and insulation. The contractor shall furnish and install a complete roofing system, including underlayment, flat and tapered insulation, blocking and EPDM membrane. Work shall also include the installation of new flashings, coping, fascia, and all related sheet metal trim, as specified and detailed, including new scuppers. All work shall be performed in accordance with project specifications and applicable codes.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS