Roof System Design and Installation

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Old Bolsover Town Council involves the design, supply, and installation of a complete replacement roof system for the George Bratt Roof at Bolsover Assembly Hall. The scope of work includes the removal of existing coverings and the installation of a new primary roof covering, underlay, and battens, with a specific focus on implementing ventilation and condensation control. To ensure structural integrity and compliance with manufacturer standards, mechanical fixings for wind uplift must be applied to deliver a fully weathertight system backed by a manufacturer warranty. The project is categorized under NAICS code 238160 and was posted on September 16, 2026. Interested parties must submit their responses by the deadline of October 16, 2026. This contract is managed by the Old Bolsover Town Council and is intended for prime contractors to engage specialized services for the successful completion of the roofing system.

General Info

Old Bolsover Town Council contract for George Bratt Roof replacement by October 16, 2026.

Agency

Old Bolsover Town CouncilView Agency

NAICS

238160 - Roofing ContractorsView NAICS

Place of Performance

GBR

Set-Aside

NONE

Documents

This scope was carved out of 2026/S 000-087900.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Roof Renewal Works at Bolsover Assembly Hall

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOld Bolsover Town Council
ContactsNo contacts available
OfficeN/A
Organization / Agency
Old Bolsover Town Council
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs the design, supply, and installation of a complete replacement roof system for prime contractors on the Bolsover Assembly Hall George Bratt Roof project. Removes existing coverings, installs primary roof covering, underlay, and battens, and implements ventilation and condensation control. Applies mechanical fixings for wind uplift per manufacturer standards. Delivers a weathertight roof system with manufacturer warranty.

Similar Contracts

Same NAICS industry code

NAICS: 238160
New
Federal
Z--REPLACE ROOF SURFACES ON DEWA LOCATIONS
Solicitation # 140P4526R0034
Solicitation 140P4526R0034 is a firm-fixed-price construction contract issued by the National Park Service for the replacement of roof surfaces at the Delaware Water Gap National Recreation Area. This project is a 100 percent small business set-aside under NAICS 238160, with an estimated project magnitude between 250,000 and 500,000 dollars. The scope of work involves the demolition and in-kind replacement of roofing systems, flashing, and underlayment at two specific locations: the Dingmans School in the North Zone and the Jackson House in the South Zone. Key deliverables include the installation of self-sealing ice and water shields, copper gutters, and snow rakes, as well as the selective replacement of up to 50 percent of damaged roof decking and sheathing. Because these are historic structures, all replacement carpentry must match existing profiles, dimensions, and wood species, and all roofing materials must be tested for asbestos prior to demolition. The contract requires performance to begin within 10 calendar days of award or notice to proceed, with a total performance period of 180 days. Award will be based on the best value to the government, utilizing a pass/fail evaluation of technical approach and past performance, with the final selection going to the lowest evaluated price among acceptable offerors. Contractors must be registered in the System for Award Management and comply with Davis-Bacon Act wage determinations for Pike County, Pennsylvania. Administrative requirements include the submission of performance and payment bonds, liability insurance, and electronic invoicing through the Invoice Processing Platform. The government maintains the right to inspect all work, and any nonconforming services must be reperformed at no additional cost to the government.
Ner Services Mabo (43000)

POSTED

about 21 hours ago

DEADLINE

in 4 days
View Details

More opportunities from Old Bolsover Town Council

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS