Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Roofing Condition Assessment & Technical Design Support

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Georgia → Water SystemView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of T4027.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Northwest Cobb Water Reclamation Facility FY28 Roof Replacements

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Water System
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → Water System
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs specialized site surveys and technical documentation for prime contractors on Cobb County Water System facility projects. Executes test cuts to determine roof depth, field verifies building dimensions, and documents deficiency listings. Produces layout, plan, section, and detail sheets. Requires Professional Engineering (PE) license. Delivers condition reports and detailed construction drawings.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, potholing, geotechnical and geophysical investigations, LIDAR surveying, BIM/3D modeling, and commissioning planning. Additionally, requirements include environmental assessments, permitting support, hazardous materials surveys, and CPM scheduling. Interested firms, specifically those with DBE, MBE, WBE, and OBE certifications, must contact Kiewit to receive an Invitation to Bid via the Building Connected system by the September 11, 2026, deadline. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate the ability to maintain labor harmony, as Kiewit is signatory to several collective bargaining agreements. Plans and specifications are available for review at Kiewit's Costa Mesa, California office.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Georgia → Water System

Same awarding agency

NAICS: 541350
SLED
Northwest Cobb Water Reclamation Facility FY28 Roof Replacements
Solicitation # T4027
The Cobb County Water System is soliciting professional services under Program No. T4027 for the replacement and repair of roofing and gutter systems at the Northwest Cobb Water Reclamation Facility and an offsite influent pump station. The project involves eight roof replacements and four roof repairs across twelve buildings. The selected service provider will be responsible for reviewing existing conditions, developing design and bid documents, and providing construction inspection and management services. Key deliverables include a Technical Memorandum documenting the design development phase and a 95 percent design submittal consisting of pre-final construction drawings, specifications, a draft bid schedule, and a construction cost estimate. Proposals must be submitted electronically via the eProcurement Portal by September 10, 2026. Evaluation is based on a 125-point scale focusing on approach, staffing, experience, cost, and financial stability, with additional bonus points available for local vendors. The contract is estimated to be valued between 250,000 and 300,000 dollars for professional services and will be compensated on an hourly rate basis with a not-to-exceed ceiling. Compliance requirements include adherence to the Georgia Security and Immigration Compliance Act, E-Verify participation, and 2010 ADA Standards. All work is located at a secured site in Acworth, Georgia, requiring specific safety equipment and sign-in procedures for all visitors.
Building Inspection Services

POSTED

20 days ago

DEADLINE

in 4 days
View Details
NAICS: 237110
SLED
Sewell Mill Heights Water Main Replacement
Solicitation # W2436
The Sewell Mill Heights Water Main Replacement project, identified as Program No. W2436, is a solicitation by the Cobb County Water System in Georgia to replace approximately 1,300 linear feet of deteriorating 6-inch asbestos-cement water main with 6-inch ductile iron pipe and related appurtenances. The scope of work includes connecting to an existing 6-inch ductile iron water main, implementing temporary and permanent erosion and sedimentation control, and maintaining safe traffic flow within the subdivision. The project also involves the installation of fire hydrants, gate valve assemblies, and the restoration of paved concrete driveways and landscaping. The contract must be completed within 180 days of the Notice to Proceed. Bids are due by 12:00 Noon on September 10, 2026, and must be submitted via the eProcurement Portal. The award will be granted to the lowest responsive and responsible bidder among those prequalified with the Cobb County Water System. Requirements for submission include a bid bond for 5% of the bid amount, and the successful contractor must provide performance and payment bonds each totaling 100% of the bid. Additionally, the contractor is required to submit a tailored Health, Safety, and Environmental Plan 10 days before mobilization and obtain a Cobb County Trenching and Excavation Permit. Payment is processed monthly via partial payment estimates reviewed by a Construction Manager and the Owner's Representative.
Water and Sewer Line and Related Structures Construction

POSTED

23 days ago

DEADLINE

in 4 days
View Details