This Solicitation opportunity from Colorado was posted on September 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Attachment B - Insurance Requirements (Poudre School District): This document outlines the mandatory insurance requirements for contractors doing business with Poudre School District. It specifies minimum coverage limits for Commercial General Liability ($2M occurrence/$3M aggregate), Commercial Automobile Liability ($1M combined single limit), and Workers' Compensation. It includes requirements for A.M. Best ratings, additional insured status for the District, and the process for submitting certificates of insurance.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for Attachment C - Contractor Qualification Statement: A contractor qualification form used to evaluate a bidder's organizational history, licensing, experience, claims history, and insurance. It requires detailed information on business structure, project history in Colorado, and references from school districts.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris Elementary School Roof Replacement and Repairs (Project No. F6246227): Issued for Construction (IFC) package dated August 22, 2025, for the Poudre School District R-1. The document includes the project manual table of contents and detailed technical specifications for Section 06 10 00 (Rough Carpentry), covering wood blocking, curbs, and nailers required for roofing work.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for IFB #26-700-006 Addendum 1.0 Q&A - Roofing Replacement Services: Addendum 1.0 for IFB #26-700-006 regarding Roofing Replacement Services for Poudre School District R-1. The document provides clarifications on the bid due date (extended to October 16, 2025), phasing plans for Shepardson and Poudre High schools, and manufacturer qualification requirements for EPDM roofing installation.
PDF
PDF, High priority: read this first61 pages · contract-document
HighAI Summary for IFB 26-700-006 Large Construction Agreement - Roofing Replacement Services: This Large Construction Agreement dated September 10, 2025, is between Poudre School District R-1 and the Contractor for IFB 26-700-006 involving roofing replacement services at multiple schools in Fort Collins, CO. The agreement includes the contract documents such as the Invitation for Bid, Contractor's Proposal, and General Conditions. It outlines the scope of work, time of commencement and completion (June 1, 2026 to August 14, 2026), liquidated damages for delays, contract sum, acceptance and final payment procedures, representations, warranties, and binding effect. The Contractor agrees to perform all work in a first-class manner and complete the project within the specified timeframe, with a two-year warranty on workmanship and materials.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB #26-700-006 - Roofing Replacement Services - Multiple Schools: Invitation for Bid (IFB #26-700-006) issued by Poudre School District R-1 for roofing replacement services at Irish Elementary, Shepardson Elementary, Harris Elementary, and Poudre High School. The document outlines a mandatory site visit on September 24, 2025, a question deadline of September 29, 2025, and a final bid submission deadline of October 06, 2025, via BidNet.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Irish Elementary School Roof Replacement and Repairs (Project No. F6246227): Issued for Construction (IFC) package dated August 22, 2025, for the Poudre School District R-1. The document includes the project title page, a table of contents for the project manual (covering divisions for wood, thermal/moisture protection, and various roof plans), and detailed technical specifications for Section 06 10 00 (Rough Carpentry), including quality assurance, submittals, and product requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Poudre High School Roof Replacement and Repairs (Project No. F6246227): Issued for Construction (IFC) package dated August 22, 2025, for the Poudre High School Roof Replacement and Repairs in Fort Collins, CO. The document includes the project title page, a comprehensive project manual table of contents listing divisions for wood and thermal/moisture protection, a detailed list of drawing sheets, and technical specifications for Section 06 10 00 (Rough Carpentry).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Shepardson Elementary School Roof Replacement and Repairs (Project No. F6246227): Issued for Construction (IFC) package dated August 22, 2025, for the Poudre School District R-1. The document contains the project manual, table of contents for divisions 06, 07, and 08, a comprehensive list of drawing sheets, and detailed technical specifications for Section 06 10 00 (Rough Carpentry), including material standards and submittal requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Shepardson ES Roof Survey Report - Project #25017: A pre-renovation asbestos survey report for the roof of Shepardson Elementary School, prepared by Accenture I&CP for Poudre School District. Conducted in January and February 2025, the survey identified friable Asbestos Containing Materials (ACM) in the roof felt with tar across approximately 50,050 SF. The document provides regulatory information, sampling methodology, and laboratory results to ensure compliance with CO Reg. No. 8 Part B and AHERA.
PDF
PDF, Low priorityother
LowAI Summary for RES 628925-1 - Shepardson Elementary Asbestos Analysis: Laboratory analysis report from Eurofins Reservoirs Environmental, Inc. dated February 07, 2025, for Anser Advisory. The document provides PLM bulk analysis results for asbestos content in samples collected from Shepardson Elementary (Project 25001), identifying the presence of Chrysotile in specific material layers.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseClosed
Posted
Solicitation
Notice updated
Response deadline changed from Oct 16, 2025 to Oct 6, 2025. The notice description changed.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
26-700-006 - Roof Replacement Services for Various Schools. Location: Larimer County, Colorado, USA. Poudre School District is seeking electronic sealed bids from experienced and qualified contractors to supply all necessary materials and labor for the roof replacement project at Shepardson, Irish, Harris Elementary Schools, and Poudre High School, as outlined in this invitation...See more.