Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ROUTE 16 WATER MAIN REPLACEMENT PROJECT

Closed
Washington Township Municipal Authority, Franklin CountyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of $16,690,000. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a substantial completion timeline of 560 calendar days. Bidders must provide a bid bond using form EJCDC C-430 and submit required MWBE documentation, including a Good Faith Efforts Form and Table A. The project is administered by Willis Engineers, who serve as the Owner's Representative. Payment is processed via Applications for Payment, with payments becoming due 30 days after presentation to the owner. Technical standards for the work include compliance with AWS D1.2 for welding, NEMA standards for motors, and ASTM C 1093 for masonry testing.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to motor control center components, and the installation of new instrumentation, electrical systems, and slide gates. Key deliverables for the project include lead abatement, metals fabrication, painting and coatings, concrete resurfacing, and the installation of FRP reinforcing systems and access hatches. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond premiums reimbursed by Garney Pacific. Interested parties must submit their quotes, including their bond rate and any redlines to standard subcontract forms, by November 17, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of dual 14 to 16-inch diameter HDPE DR 11 pipelines from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station featuring a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on DBE participation. Bids are due by 2:00 PM on October 29, 2025. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 7 hours ago

DEADLINE

in about 18 hours

AI Contract Overview

Show more

The project involves the installation of approximately 1,125 feet of 8-inch PVC water line and the replacement of 18 water services in Washington Township, Franklin County, Pennsylvania, with full lawn and pavement restoration as depicted on the approved drawings and specified in the contract documents. All materials, labor, and equipment necessary to complete the work must be furnished and installed in accordance with manufacturer instructions, applicable industry standards such as AWWA C900 and ASTM, and oversight by the designated Engineer. The work is subject to inspection and acceptance at the project site, with the Contractor responsible for arranging and paying for all required inspections, including those conducted by external agencies like the Pennsylvania Department of Transportation and the Department of Environmental Protection. Compliance with state laws including the Pennsylvania Prevailing Wage Act, Steel Products Procurement Act, and Act 127 Public Works Employment Verification is mandatory, and the Contractor must maintain proper permits, submit detailed safety programs, and provide resumes for key personnel including a designated on-site safety representative. Materials must be delivered in the manufacturer’s original sealed packaging or equivalent, stored for no more than 30 days prior to installation under temperature and humidity conditions outlined by the manufacturer, and protected from damage, deterioration, or theft in weathertight, ventilated areas. No federal FAR-style clauses are included; instead, the contract is structured around Articles addressing definitions, payment, change orders, claims, and compliance. Bids must be submitted electronically via PennBid, with no formal contract value or pricing line items provided in the solicitation. The bidding process has a deadline of May 28, 2026, and no set-aside provisions, socioeconomic certifications, or evaluation factor weights are specified beyond a general requirement for responsible bidders. Acceptance of the work occurs upon final inspection at the site, and the Contractor remains liable for all work until formal sign-off by the Engineer.

General Info

Install 1,125 feet of 8-inch PVC water line, replace 18 services, restore lawns and pavement, comply with state laws and inspections.

Place of Performance

Franklin County, PA, USA

Set-Aside

NONE

Documents

3

Route 16 Water Main Replacement Bid Drawings

PDF, High priority: read this firstspecifications
High

Route 16 Water Main Replacement Project (12678282)

PDF, High priority: read this firstrfb
High

Route 16 Water Main Replacement Project - Addendum No. 1

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Franklin County
ContactsNo contacts available
OfficeFranklin County, PA, USA
Office AddressFranklin County, PA, USA
ContactsNo contact information available

Interested Companies (55)

Schuylkill Tree and Landscaping
Gov AlphaBrooklyn, New York
ConstructConnectCincinnati, OH

See All 55 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The work includes all material, labor, and equipment necessary for the installation of approximately 1,125 feet of 8” PVC water line, replacement of 18 water services, lawn and pavement restoration as shown on the drawings and as specified. The project is located in Washington Township, Franklin County.

More opportunities from Pennsylvania → Franklin County

Same awarding agency

NAICS: 237110
New
SLED
Montour Township Board of Supervisors - Pump Station No. 4 Modifications (General & Electrical)
Solicitation # Montour Township, Columbia County
The Montour Township Board of Supervisors is soliciting bids for the modification of Pump Station No. 4 in Franklin County, Pennsylvania. The project is divided into two separate contracts to comply with state public contracting requirements: Contract 1 for General Construction, covering mechanical, site, and general work, and Contract 2 for Electrical Construction. The scope of work involves the removal and replacement of sewage pumps, brackets, supports, guide rails, controls, level floats, probes, piping, valves, and fittings, as well as the integration of these new components with the existing communication and monitoring system. This project is funded by a Community Development Block Grant, making it subject to specific federal requirements. The contract will be awarded to the lowest responsive and responsible bidder based on a total lump sum bid amount. Bids must be submitted electronically via the PennBid portal by December 8, 2026. Awarded contractors are required to provide performance and payment bonds equal to 100 percent of the contract price, as well as certificates of insurance, within ten days of notification. Additionally, contractors must adhere to Pennsylvania prevailing wage rates and comply with O.S.H.A. safety guidelines and various federal and state non-discrimination and equal employment opportunity certifications. Payment is processed monthly, with a 10 percent retention held until the work is 50 percent complete, at which point the retention reduces to 5 percent. Final acceptance is contingent upon the delivery of record drawings and the approval of the engineer.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS