Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Missouri was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Route DD 300,000 Gallon Elevated Storage Tank

Closed
22-0293State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Federal
Jennifer Brown (COW)
Solicitation # 75H70126Q00036
Solicitation 75H70126Q00036 is a request for quotations issued by the Indian Health Service Division of Engineering Services for the installation of a replacement individual on-site septic system at a residential property in Ridgefield, Washington. This project is a total small business set-aside under NAICS 237110, with an estimated contract value between $25,000 and $100,000. The scope of work includes the installation of a 1500-gallon septic tank, a 1050-gallon dose tank with timed dosing controls, a 1440 square foot subsurface drip dispersal field, and associated sewer piping and cleanouts, as well as the removal and disposal of the existing system. The project is governed by a firm-fixed-price contract type and is subject to Davis-Bacon Act wage determinations for Clark and Skamania counties. Eligible offerors must be Clark County certified septic installers and registered in the System for Award Management. The award will be based on price and compliance with all terms and conditions. Once awarded, the contractor must commence work within 10 calendar days of the notice to proceed and complete the entire project, including final cleanup and the submission of as-built drawings, within 30 calendar days. Payment requests must be submitted electronically via the Department of Treasury Invoice Processing Platform. Special requirements include adherence to OSHA trench safety regulations and the potential for Buy Indian Act preferences for certified Indian Economic Enterprises.
Division Of Engineering Svcs - Seattle

POSTED

about 2 hours ago

DEADLINE

in 8 days
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves critical wastewater infrastructure upgrades for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive improvements to the Morgans Branch Pumping Station. Key station upgrades entail the installation of a new wet well, valve vault, and associated appurtenances, alongside the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and supporting site improvements such as stormwater facilities, fencing, and landscaping. The estimated project value is 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must adhere to strict submission requirements, including the use of prescribed EJCDC forms and the provision of bid security. The project mandates specific socioeconomic goals, including a 10 percent combined MBE/WBE participation goal for the State of North Carolina and separate EPA goals of 10.9 percent for MBE and 10.4 percent for WBE. Performance and payment bonds are required, and insurance providers must maintain an A.M. Best rating of A-VII or better. Contract administration is governed by EJCDC standard general and supplementary conditions. Payments are processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. The project includes liquidated damages of 1,000 dollars per day for delays in reaching both substantial and final completion. Quality assurance is managed through site inspections by the Engineer and independent testing laboratories, with specific adherence to NEMA and ASTM standards for motors and masonry.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

Andrew County Public Drinking Water Supply District No. 1 is seeking sealed bids for Project 22-0293, which involves the construction of a 300,000 gallon elevated storage tank on Route DD. The scope of work includes the tank, foundation, piping, and appurtenances, as well as potential incidental tasks such as waterline relocation, excavation, demolition, and tank disinfection. The project is expected to be completed within 12 months of the construction start date. Bids must be submitted to the District office in Savannah, Missouri, by 1:00 pm CST on June 8, 2026, and must include a bid security equal to 5 percent of the total bid. Contractors are required to adhere to Missouri Prevailing Wage Law, OSA safety training, and citizenship e-verification requirements. Additionally, the project must comply with the Build America, Buy America Act, requiring the use of United States-produced iron, steel, and construction materials unless a waiver is granted. All official bidding documents and addenda are available through the designated Drexel Tech website.

General Info

Bids for 300,000 gallon elevated storage tank construction due June 8, 2026.

Place of Performance

Andrew County, Savannah, MO, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMissouri → TREKK Design Group LLC
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Interested Companies (11)

Empire Electric Services and TechnologiesLeeton, MO
ConstructConnectCincinnati, OH
Mellen & AssociatesCouncil Bluffs, IA

See All 11 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
General Notice
Andrew County Public Drinking Water Supply District No. 1 (Owner) is requesting sealed bids for the construction of the following Project:
Route DD 300,000 Gallon Elevated Storage Tank
Project #22-0293
Bids for the construction of the Project will be received at Public Water Supply District No. 1 of Andrew County located at 201 S 71 Hwy, Savannah, MO 64485, until 8th day of June, 2026 at 1:00 pm CST. At that time the Bids received will be publicly opened and read. The Owner reserves the right to award the contract to the “lowest and best responsible bidder.” The Owner reserves the right to reject any or all bids and the right to waive any irregularities in any or all bids. Any bids received after the date and time specified will not be opened. Each bid must be accompanied by a 5% of the bid total as bid security. Bid bond, cashier’s check, or approved money order will be accepted, payable to Andrew County PWSD #1.
The Project includes the following Work:
Construction of a new 300,000 gallon elevated storage tank, foundation, piping and appurtenances. Incidental work may include: relocating existing waterline, excavation, piping, valving, controls, demolition, cut/fill, concrete, placement, paving/resurfacing, tank disinfection, start-up, testing and all other appurtenances.
The work described above is expected to be completed within 12 months of commencing construction. The Contractor shall comply with all applicable OSA safety training and requirements. Wage rates applicable to this project are required by the State of Missouri Prevailing Wage Law and are provided in the proposal. The contractor shall comply with all requirements regarding immigration and e-verification of citizenship. By law, only Missouri laborers and laborers from non-restrictive states are allowed to be employed on Missouri’s public works projects with the unemployment rate exceeding 5% for two consecutive months.
Obtaining the Bidding Documents
Information and Bidding Documents for the Project can be found at the following designated website:
WWW.DREXELTECH.COM
Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.
Instructions to Bidders
For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
Domestic Preference
This project is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58, §§ 70901-70953. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States.
This Advertisement is issued by:
Owner: Andrew County PWSD No. 1
By: Randy Holt
Title: District Manager
Date: April 29, 2026

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS