This Solicitation opportunity from Illinois was posted on February 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
This contract pertains to the Illinois Route 390 Tollway project, specifically the segment between mile points 6.0 (US 20/Lake Street) and 13.0 (I-290/Eisenhower Expressway), with a project scope estimated between 50 million and 100 million dollars. The solicitation, identified as 25-557THA-PROCU-B-46742, was posted on February 28, 2025, with a response deadline of March 14, 2025. The Illinois Toll Highway Authority, a state-level agency under Illinois, is overseeing this project, which falls under the NAICS code 541310, indicating architectural and engineering services. This particular notice clarifies that it is not a new solicitation but a cloning of a previous bid (24-557THA-ENGCO-B-42917) to facilitate stipend processing related to the Design Build Request for Proposal (RFP). The primary point of contact for this contract is Kristina L. Peart, the Contracting Officer, reachable at [phone hidden]. Additional details and documents related to the solicitation can be accessed through the Illinois bid portal link provided.
HighAI Summary for Addendum 11 to RFP RR-23-4920 Illinois Tollway: This document is Addendum No. 11 dated August 30, 2024, to the Request for Proposals (RFP) RR-23-4920 issued by the Illinois State Toll Highway Authority. It provides revisions to the original RFP, including updates to the Instructions to Proposers (ITP) Section 2 (Procurement Schedule) and the Price Proposal Form. The addendum clarifies that proposers must not include pricing information in the proposal documents but only in the BidBuy system as per Section 4.2 of the ITP. The document includes redlined modifications and updates key dates related to the stipend agreement, proposal due date, and selection of the apparent best value proposer. It also adds shared risk items to the price proposal form for reference. The addendum is critical for proposers to comply with updated submission instructions and procurement schedule changes.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 1 to RFP RR-23-4920 Illinois State Toll Highway Authority: This document is Addendum No. 1 dated 5/21/2024 to the Request for Proposals (RFP) RR-23-4920 issued by the Illinois State Toll Highway Authority. It includes revisions to the original RFP, with modified sections shown in redline format. Key changes affect the procurement schedule, price proposal contents, delivery format, and responsiveness requirements. The addendum clarifies that all price proposal information must be entered manually on the BidBuy platform, and the included price proposal form is for reference only. It also contains proposer questions and answers, a revised price proposal form, and a redlined Instructions to Proposers (ITP) document. This addendum is critical for proposers preparing their submissions under the RFP.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 2 to RFP RR-23-4920 Illinois State Toll Highway Authority: This document is Addendum No. 2 dated June 6, 2024, to the Request for Proposals (RFP) RR-23-4920 issued by the Illinois State Toll Highway Authority. It includes revisions to the original RFP, with modified sections shown in redline format. Key contents include proposer questions and answers, preproposal meeting sign-in sheets and presentation, a link to the meeting recording, and a redlined Instructions to Proposers (ITP). Notable revisions include updates to the procurement schedule and changes to the number of one-on-one meetings available. The addendum clarifies submission requirements, pricing form alignment with BidBuy, and directive design elements. It serves to update and clarify the RFP for prospective proposers.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 3 to RFP RR-23-4920 Illinois State Toll Highway Authority: This document is Addendum No. 3 dated June 27, 2024, to the Request for Proposals (RFP) RR-23-4920 issued by the Illinois State Toll Highway Authority. It contains revisions to the original RFP, including redlined modifications to various sections and exhibits across multiple books of the RFP. Key changes clarify concepts such as Directive Design, Governmental Approvals, compensation for hazardous materials remediation, and adjustments to contract deadlines and prices. The addendum also includes responses to proposer questions, workshop attendance sheets, and presentations related to DBE/VOSB participation. This amendment is critical for proposers to understand updated requirements, submission instructions, and evaluation criteria for the contract.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 4 to RFP RR-23-4920 Illinois State Toll Highway Authority: This document is Addendum No. 4 dated 7/10/2024 to the Request for Proposals (RFP) RR-23-4920 issued by the Illinois State Toll Highway Authority. It provides revisions and clarifications to the original RFP, specifically addressing discrepancies between the BidBuy system's required quote attachments and the Instructions to Proposers (ITP) Section 5.2.1 on responsiveness. The addendum clarifies that the ITP requirements take precedence over BidBuy listings, particularly regarding bond submissions. It instructs proposers to submit a Proposal Bond or Proposal Guaranty instead of separate Payment and Performance Bonds at the time of proposal submission. The addendum includes redlined modifications and corrections to ensure proposers follow the correct submission requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 5 to RFP RR-23-4920 Illinois State Toll Highway Authority: This document is Addendum No. 5 dated 7/26/2024 to the Request for Proposals (RFP) RR-23-4920 issued by the Illinois State Toll Highway Authority. It contains revisions to the original RFP, including redlined modifications to multiple sections across Books 1, 2, and 3, as well as the Instructions to Proposers (ITP). Key changes include clarifications on scope validation, insurance requirements, shared risk item work, submittal requirements, design criteria, and updated special provisions for various construction materials and methods. The addendum also includes proposer questions and answers and a revised price proposal form for reference. This amendment is critical for proposers to understand updated requirements and submit compliant proposals.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 6 to RFP RR-23-4920 Illinois State Toll Highway Authority: This document is Addendum No. 6 dated August 1, 2024, to the Request for Proposals (RFP) RR-23-4920 issued by the Illinois State Toll Highway Authority. It includes revisions to the original RFP, specifically changes to the Instructions to Proposers (ITP) Section 2 Procurement Schedule with updated deadlines for various submission and response dates. The addendum provides redlined modifications to the RFP and clarifies procedural and schedule changes. It also contains responses to proposer questions and updates to the procurement process, proposal requirements, evaluation, and post-selection contracting process. The document serves to update proposers on critical schedule changes and procedural clarifications for the design-build project under contract RR-23-4920.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 8 to RFP RR-23-4920 Illinois Tollway 08192024: This document is Addendum No. 8 dated August 19, 2024, to the Request for Proposals (RFP) RR-23-4920 issued by the Illinois State Toll Highway Authority. It includes revisions to the original RFP, presented in redlined format, with additions in blue and deletions in red. Key contents include responses to proposer questions and modifications to technical sections such as design requirements for shoulder rumble strip removal and seismic design of bridges. The addendum clarifies scope details, insurance certification requirements, and design responsibilities for light poles and utilities. It serves as an official update to the RFP, providing critical clarifications and changes for proposers.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 9 to RFP RR-23-4920 Illinois State Toll Highway Authority: This document is Addendum No. 9 dated August 20, 2024, to the Request for Proposals (RFP) RR-23-4920 issued by the Illinois State Toll Highway Authority. It includes revisions to the original RFP, specifically modifications to the Instructions to Proposers (ITP) Section 2 regarding the procurement schedule. The addendum provides updated dates for key milestones such as the last day to issue RFP addenda, stipend agreement submittal deadline, proposal due date, and anticipated selection of the apparent best value proposer. Changes are shown in redlined format, with additions in blue and deletions in red. The document also notes that all proposer questions have been answered and provides contact information for further inquiries. This addendum is critical for proposers to understand updated submission requirements and timelines for the design-build project under contract RR-23-4920.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 10 to RFP RR-23-4920 Illinois State Toll Highway Authority: This document is Addendum No. 10 dated 8/27/2024 to the Request for Proposals (RFP) RR-23-4920 issued by the Illinois State Toll Highway Authority. It contains revisions to the original RFP including redlined modifications to multiple sections such as Book 1 Section 16.1.1, Book 2 Sections 1.7, 10.3.2, 10.3.4, 14.2.6, 16.3.6.3, and others. The addendum includes updates to pricing, scope clarifications, removal and addition of work descriptions, and answers to proposer questions. It also revises the Instructions to Proposers and the Price Proposal Form. The document is critical for proposers as it updates technical specifications, pricing, and submission instructions for the contract RR-23-4920.
PDF
PDF, High priority: read this firstspecial-notice
HighAI Summary for CPO Notice 2023.12 Electronic Submission: This notice, dated May 10, 2023, from Ellen H. Daley of the Chief Procurement Office, announces the immediate effectiveness of electronic submission requirements for state agency procurements, rescinding CPO Notice 2020.06. It mandates that all competitive solicitations (IFB, RFP) and small purchase procurements accept only electronic submissions via BidBuy or email, prohibiting paper or other physical media submissions. The notice also directs agencies to use updated solicitation templates (IFB v23.3 and RFP v23.4) that reflect these electronic submission requirements. The document aims to improve procurement efficiency, cost savings, and file completeness.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Illinois Tollway Design-Build Project RR-23-4920 Instructions to Proposers: This document is the Instructions to Proposers (ITP) for the Illinois Tollway Design-Build Project, Job Number RR-23-4920, originally issued on May 15, 2024. It provides comprehensive guidance for proposers including project description, procurement method, proposal requirements, evaluation process, and post-selection contracting. The document includes detailed sections on disadvantaged business enterprise participation, proposal submission instructions, evaluation criteria, and contractual obligations. It also contains appendices with required forms and definitions relevant to the Request for Proposals (RFP) process for this design-build contract.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Illinois Tollway Design-Build Supplemental Specifications to IDOT Standards: This document is the Illinois Tollway Design-Build Supplemental Specifications issued March 1, 2024, supplementing the Illinois Department of Transportation Standard Specifications for Road and Bridge Construction adopted January 1, 2022. It provides amendments and additional provisions specific to Illinois Tollway contracts, including definitions, proposal requirements, contract execution, scope of work, control of work and materials, legal relations, prosecution and progress, measurement and payment, and miscellaneous sections. The specifications supersede conflicting IDOT provisions and are applicable to all Illinois Tollway contracts. The document includes detailed definitions, abbreviations, and references to standards and agencies relevant to construction and engineering.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Illinois Tollway Route 390 Design-Build Contract Book 1 Exhibits RR-23-4920: This document is the Design-Build Contract Book 1 - Exhibits for the Illinois State Toll Highway Authority's Route 390 project, contract number RR-23-4920, dated May 15, 2024. It contains definitions and acronyms critical to understanding the contract terms, including key project concepts such as Acceleration Costs, Acceptance, Additional Key Personnel, Alternative Technical Concepts, and Baseline Schedule. The exhibits provide foundational terminology and references used throughout the contract documents, essential for contract administration and project execution.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Illinois Tollway Route 390 Design-Build Contract Book 2 RR-23-4920: This document is Book 2 of the Design-Build Contract for Illinois Tollway Route 390, contract number RR-23-4920, dated May 15, 2024. It contains detailed project management plans, public information protocols, environmental compliance requirements, quality management procedures, utilities coordination, right-of-way responsibilities, and geotechnical requirements. The document serves as a comprehensive guide for design-builder responsibilities, administrative standards, submittal requirements, and construction criteria essential for the successful execution of the project.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Illinois Tollway Route 390 Design-Build Contract Book 3 RR-23-4920: This document is the Design-Build Contract Book 3 for the Illinois State Toll Highway Authority's Route 390 project, contract number RR-23-4920, dated May 15, 2024. It contains detailed design-build modifications to the Illinois Department of Transportation (IDOT) Standard Specifications adopted January 1, 2022, along with supplemental and recurring special provisions adopted January 1, 2024. The document includes extensive technical specifications covering earth and rock excavation, erosion control, asphalt mixtures, concrete structures, bridge repairs, traffic control, and other construction standards. It references multiple AASHTO standards and federal regulations governing the work. This contract document serves as a comprehensive technical guide and standard reference for the design-build pilot project.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Illinois Tollway Route 390 Design-Build Contract RR-23-4920 Book 1: This document is the Design-Build Contract Book 1 for the Illinois State Toll Highway Authority's Route 390 project, contract number RR-23-4920, dated May 15, 2024. It contains comprehensive contract terms including definitions, obligations of the design-builder, project completion timelines, control of work, utility and railroad responsibilities, right-of-way access, environmental compliance, labor standards, diversity and equal employment opportunity provisions, bonds, insurance requirements, risk of loss, payment terms, subcontractor requirements, change order procedures, suspension and termination clauses, default conditions, damages, indemnification, dispute resolution, project acceptance, warranty and maintenance, document and record keeping, and miscellaneous provisions. The document also includes exhibits such as definitions, proposal commitments, technical concepts, authorized representatives, special provisions for equal employment opportunity and disadvantaged business enterprise participation, claims process, warranties, state requirements, and performance bonds. This contract document is critical for understanding the full scope, legal obligations, and administrative requirements for the design-build pilot project.
PDF
PDF, High priority: read this firstitp-forms
HighAI Summary for RR-23-4920 ITP Appendix A Forms - Stipend Agreement and Participant Info: This document is Appendix A of the Instructions to Proposers (ITP) for the Design-Build Pilot Project RR-23-4920. It includes fillable forms for proposers, such as Form 1 for information about major participants and subcontractors, and Form 2, the Stipend Agreement. The Stipend Agreement outlines terms under which shortlisted proposers who submit responsive but unsuccessful proposals may receive a stipend up to $75,000 for the unlimited use of their work product by the Illinois Tollway. It details definitions, conditions for stipend payment, rights to proprietary items, indemnification, and procedural requirements. The document is dated May 15, 2024, and is critical for proposers responding to the RFP.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RR-23-4920 RFP Cover Page Illinois Tollway Design Build Pilot Project: This document is the cover page for the Request for Proposals (RFP) RR-23-4920 related to the Illinois Tollway Design Build Pilot Project. It indicates that only shortlisted proposers are eligible to submit proposals in response to this RFP. The document is dated May 15, 2024, and serves as an introductory page to the solicitation package.
DOCX
DOCX, Low priorityspecial-notice
LowAI Summary for Pre-Proposal Meeting Announcement for RFP RR-23-4920: This document is a meeting notification dated May 16, 2024, for a pre-proposal meeting related to the Illinois Tollway Design-Build Project RR-23-4920. The meeting is scheduled for May 21, 2024, at 2:30 p.m. at the Illinois Tollway Central Administration Building in Downers Grove, Illinois, with a virtual attendance option. The notice informs attendees about the project's background, procurement timeline, Instructions to Proposers (ITP), Request for Proposals (RFP), and evaluation processes. Attendance is mandatory for shortlisted teams and optional for others interested in teaming. The document provides contact information for questions and encourages subcontractors to meet shortlisted teams.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for RR-23-4920 Bid Opening Announcement: This document announces the bid opening meeting for contract RR-23-4920 with the Illinois State Toll Highway Authority. The meeting is scheduled for August 30, 2024, at 2:00 p.m. U.S. Central Daylight Time and will be held via Microsoft Teams. It includes the meeting ID, passcode, webinar link, and call-in information for audio participation. Registration is required to attend.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for RR-23-4920 Bid Opening Announcement: This document announces the bid opening meeting for contract RR-23-4920 with the Illinois State Toll Highway Authority. The meeting is scheduled for September 6, 2024, at 2:00 p.m. Central Daylight Time and will be held via Microsoft Teams. It includes details for joining the meeting, such as the meeting ID, passcode, webinar link, and phone call-in information. Registration is required to attend.